Laserfiche WebLink
<br />two months, and that is going to be based on the fact that we got the structural elements <br />designed, etc., and so from the point of NTP [Notice to Proceed]. <br /> <br />15. You won't have the structural design for the proposal? <br />No, you have two weeks for the proposal according to the RFP. Are you saying that is <br />insufficient? <br /> <br />16. Well you are going to design the... <br />No, no, you are not designing anything for the RFP. You are establishing what it is that <br />you intend on doing, and how you intend on doing it, and sort of like what the image is <br />that is going to be out here. As an engineer, he sees designing as putting numbers to the <br />calculations, not to design. Is two weeks going to be sufficient to you all? <br /> <br />17 . Would it be possible to extend it another week? <br />Yes, okay we will add an additional week, giving you three weeks. <br /> <br />18. Without a design, how will you compare the proposals? <br />Submit a schematic. He will not tell you that you have to submit a design, he doesn't <br />use that terminology but you submit a schematic, a good enough schematic to where he <br />can make a determination as to what we need. If it is a design that you want to <br />produce, then that is fine, but a schematic will do. In other places that he has been at <br />that had done this kind of thing, they had actually attached photos of something similar <br />that they have done before that shows a semblance of what they are going to be, in <br />terms of color, of the lacing, to give a better impression than they have provided a <br />schematic that shows how it will look on your building element. That is one of the <br />reasons why he produced these images in back of the RFP. <br /> <br />19. You will give us a new date? <br />Yes, we will publish a new date and you will get an Addendum with the information. <br /> <br />20. Any other rates? <br />No labor rates it is all general funds, and so we are not going to be tying you to payroll <br />funds or minimum standards. <br /> <br />21. If the bid cannot meet your $50,000 budget, do we even submit a bid? <br />He has never told anyone not to submit a bid. The way he looks at it right now is that <br />we have a $50,000 budget. What happens between now and then could change, so don't <br />keep from submitting a bid because he is not the ultimate authority as to funds, can we <br />find a little bit more, maybe, maybe not. That is a risk that you all have to take. <br /> <br />22. I am not familiar with Demand Star, I found out through Blue Book, how do I access <br />Demand Star? <br />The web site is www.demandstar.com <br /> <br />If you have any other questions, send him an em ail and he will reply, and it will be <br />added to Demand Star. <br /> <br />Mandatory Pre-Submittal Conference QA 100610 <br /> <br />Page 4 of 5 <br />