Laserfiche WebLink
<br />~ <br /> <br />ARTICLE 455-11 (Pages 549 - 553) is expanded by the following: <br /> <br />455-11.15 Embedded Data Collectors: The quantity to be paid for will be the number of <br />EDCs as shown in the plans or authorized by the Engineer, actually installed in piles, completed <br />and accepted in accordance with the Contract Documents. The price of EDC will include all <br />costs related to the work as described herein. <br /> <br />SUBARTICLE 455-12. I 5 (Pages 555 and 556) is deleted and the following substituted: <br /> <br />455-12.15 Embedded Data Collectors: Price and payment will be full compensation for <br />all labor, equipment, and materials required to perform this work. <br /> <br />ARTICLE 455-12 (Pages 553-556) is expanded by the following: <br /> <br />455-12.16 Payment Items: Payment will be made under: <br /> <br />Item No. 455- 2- <br />Item No. 455- 14- <br />Item No. 455- 18- <br />Item No. 455- 34- <br />Item No. 455- 35- <br />Item No. 455- 36- <br />Item No. 455- 37- <br /> <br />Item No. 455-119- <br />Item No. 455-120- <br />Item No. 455-133- <br />Item No. 455-143- <br />Item No. 455-144- <br />Item No. 455-145- <br />Item No. 455-146- <br /> <br />Treated Timber Piling - per foot. <br />Concrete Sheet Piling - per foot. <br />Protection of Existing Structures - lump sum. <br />Prestressed Concrete Piling - per foot. <br />Steel Piling - per foot. <br />Concrete Cylinder Piling - per foot. <br />Fiberglass Structurally Reinforced Composite Piles-per <br />foot. <br />Test Loads- each. <br />Point Protection - each. <br />Steel Sheet Piling - per square foot. <br />Test Piles (Prestressed Concrete) - per foot. <br />Test Piles (Steel) - per foot. <br />Test Piles (Concrete Cylinder) - per foot. <br />Embedded Data Collector (EDC) - each <br />