My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Beiswenger - Structural
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 10-07-02 Fishing Pier
>
Specifications
>
Beiswenger - Structural
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2010 10:29:44 AM
Creation date
11/4/2010 4:01:32 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Demolish Fishing Pier
Bid No. (xx-xx-xx)
10-07-02
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />initial driving to determine time effects during the driving of test piles at no additional cost to the <br />Department. <br />I f additional set-checks are determined necessary by the Engineer within <br />two working days following the end of initial driving, each set-check will be paid as an <br />additional set-check. If set-checks are determined necessary by the Engineer after two working <br />days from the end of initial driving, each set-check will be paid for as Pile Redrive. <br />Install instruments on test piles when dynamic load tests are included in <br />the plans or when directed by the Engineer. <br /> <br />SUBARTICLE 455-7.2 (Page 543) is deleted and the following substituted: <br /> <br />455-7.2 Manufacture: Fabricate piles in accordance with Section 450. Supply and install <br />EDCs in all square prestressed bridge foundation piles in accordance with Index 20602. Ensure <br />the EDCs are installed by the manufacturer's approved personnel. <br /> <br />SUBARTICLE 455-7.8 (Pages 545 and 546) is deleted and the following substituted: <br /> <br />455-7.8 Pre-Planned Splices: Splices shall be made by the doweled splice method <br />contained in the Standard Indexes or may be made using proprietary splices which are listed on <br />the Department's QPL. Splice test piles in the same manner as the production piles. Include in <br />the pile installation plan, the chosen method of splicing and the approximate locations of the <br />splice. Generally, place the splice at approximately the midpoint between the estimated pile tip <br />and the ground surface, considering scour if applicable. Stagger the splice location between <br />adjacent piles by a minimum of 10 feet. Obtain the Engineer's approval prior to constructing any <br />pile sections. Construct piles which are to be spliced using the doweled splice with preformed <br />dowel holes in the bottom section and embedded dowels in the upper section. <br />When electing to use dowel splices, assist the Engineer in performing a dynamic <br />load test on each dowel spliced pile to verify the splicing integrity at the end of driving. Replace <br />any damaged pile splices in accordance with 455-11.2.7. Provide the Engineer 48 hours advance <br />notification prior to driving piles with epoxy-bonded dowel splices. <br />Ensure sections of mechanically spliced piles are restrained from rotating with <br />respect to the other sections. Mechanical pile splices shall be capable of developing the <br />following capacities in the pile section unless shown otherwise in the plans and capable of being <br />installed without damage to the pile, EDC, or splice: <br />a) Compressive strength = (Pile Cross sectional area) x (28 day concrete <br /> <br />strength) <br /> <br />b) Tensile Strength = (Pile Cross sectional area) x 900 psi <br /> <br />Pile Size (inches) <br />18 <br />20 <br />24 <br />30 <br />36 <br /> <br />Bendinll Strenllth (kip-feet) <br />245 <br />325 <br />600 <br />950 <br />1600 <br />
The URL can be used to link to this page
Your browser does not support the video tag.