My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SBLM
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-02) Prof. Architectural Svcs.
>
Responses
>
SBLM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2010 4:41:30 PM
Creation date
11/10/2010 4:41:13 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Architectural Svcs.
Bid No. (xx-xx-xx)
10-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />SBLM Qualifications <br />Relevant Experience, Staffing Approach & Project Organization <br /> <br />single facility. The design is a single pod form repeated <br />four times, one for each school, resulting in a modular <br />four-story classroom wing. The repeated forms created <br />economy and schedule efficiency by incorporating the <br />bulk of construction into a compact portion of the site. <br />Public spaces are organized across a courtyard space. <br />These spaces serve both the school and community use, <br />with the courtyard functioning as circulation, assembly <br />and featured space. <br /> <br />Staffing Approach <br />As a large, multi disciplinary architecture firm, SBLM is <br />well-equipped to handle the Sunny Isles Beach general <br />architectural services contract. With an architectural staff <br />of over 60 design professionals, SBLM has the ability <br />to evaluate a project's needs and staff it to match the <br />complexity of the project and the time necessary for the <br />completion of the assignment. The SBLM team assigned <br />to the project will remain on the project from inception <br />through construction administration and the final punch <br />list. This approach preserves the design integrity of each <br />project as it moves toward completion and reinforces a <br />seamless interface with the various project stakeholders. <br /> <br />Project Organization <br />The project team will be lead by James Cohen AlA, <br />LEED AP, serving as Principal-In-Charge. In this role, Mr. <br />Cohen will oversee all Sunny Isles Beach projects and <br />client requests. He will be responsible for managing the <br />execution of all services under the Sunny Isles Beach <br />contract and will ensure that resources are committed <br />to the project as required. <br /> <br />As the Project Manager, Glenn Lurie AlA, LEED AP will <br />serve as the day-to-day contact with the City of Sunny <br />Isles Beach. Mr. Lurie will have complete responsibility for <br />conventional management elements, including quality, <br />schedule and budget. He will be directly responsible for <br />managing the architectural team as well as consultant <br />coordination. <br /> <br />As Design Director, Anthony Koehler AlA, LEED AP will <br />work with Mr. Cohen, Mr. Lurie, and the City to establish a <br />clear design direction for the project. Mr. Koehler will play <br />a major role in the schematic and design development <br />phases and ensure the construction documents are <br />reflective of the design intent. <br /> <br />Qualifications and experience of the key project team <br />members are outlined in the pages to follow. <br /> <br />SBLM Architects <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.