Laserfiche WebLink
<br />OmETRIC <br />~ ENGINEERING <br /> <br />WHY THINGS WORK <br /> <br />E=NRIQUE: ANT E:l 0 <br />ProJe( t M HI ~ ~\ I <br /> <br />:;, )uth DadE' bllsV <lY Extension Segment II Miami Dade ~ I 1.ll <br />Project E:ngineel Construction of a 7.3 miles of roadway and bike path for <br />Miami-Dade Transit. Responsible for the design of all roadway signalization, <br />pavement marking, and drainage systems as well as plans and contract <br />document production and construction administration. The project design <br />involved intersection improvements, street lighting, signalization, <br />maintenance of traffic, and engineered mitigation of in-situ contaminated <br />soils within significant portions of the project corridor. (2001-2008) <br /> <br />45" Street I Haverhlll Road, Palm Beach County. Florida Dri>in iljt' <br />Engineer Roadway reconstruction and widening of 1.3 miles of urban <br />arterial between Jog Road and Haverhill Road. The project involves <br />widening the road to three lanes, a new intersection, milling and resurfacing, <br />drainage improvements, a new bridge crossing of Florida's Turnpike, <br />signalization, right of way acquisition, utility coordination, signing, and <br />pavement marking. Responsible for the design of signalization at two <br />intersaections an all pavement marking. (2006-2008) <br /> <br />"5R AlA South Roosevelt Boulevard, Key West FlOrida ~ ruj, t <br />Engineer Reconstruction of three miles of an urban arterial for FDOT <br />District 6. Responsible for roadway and drainage design, signalization, <br />lighting, plans and contract document production and construction <br />administration. Project involved complete reconstruction of seawall, <br />pavement, sidewalk, and drainage systems as well as significant project <br />permitting. Project is currently under construction and post-design services <br />are in progress. (2001-2008) <br /> <br />Washington Avenue Parking Lot, Homestead, Florida, Project Manager <br />Site development project for the City of Homestead Community <br />Redevelopment Agency to create a new one-acre, 68-space parking facility <br />in the Downtown Business District. Project involved site layout, paving, <br />drainage improvements, irrigation, landscaping, signing, lighting and post- <br />design services. (2006 - 2007) <br /> <br />Audoban Park, Homestead, Florida Project Manager - Site development <br />project for the City of Homestead Parks and Recreation Department to <br />construct improvements to the existing City park. Project included of a new <br />parking lot, site grading, multi-use path, lighting, and landscaping and post- <br />design services. (2006 - 2007) <br /> <br />Force Main Improvements, City of Dania Beach Florida ProJ<O'l t <br />Manager Construction of 2,300 linear feet of 16" sanitary sewer force main <br />under a joint project agreement between Dania Beach and FDOT. The <br />project involved fast-track design to upgrade and relocate existing sanitary <br />systems in advance of planned road improvements and to service local <br />redevelopment. The project also involved significant traffic control, <br />permitting, and post-design services. (2007-2008) <br /> <br />EDUCATION. <br />B.S. Engineering <br />Technology, Florida <br />International University, <br />1980 <br /> <br />YEARS OF <br />EXPERIENCf <br />36years <br /> <br />PROFE:SSIONAL <br />EXPERIENCE: <br />Mr. Antelo has 37 years of <br />extensive experience in <br />the technical execution of <br />complex civil engineering <br />projects, particularly in the <br />areas of roadway <br />geometrics, lighting <br />drainage, land subdivision, <br />and maintenance of traffic. <br />