Laserfiche WebLink
<br />12. NAME <br />Lawrence J. Morey Jr., P.E. <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />Com fete one Section E for each ke erson. <br />13. ROLE IN THIS CONTRACT <br />Project Engineer/Roadway <br /> <br />14. YEARS EXPERIENCE <br />a. TOTAL b. WITH CURRENT FIRM <br />30 6 <br /> <br />15. FIRM NAME AND LOCATION (CilyandState) <br />CPH Engineers, Inc./Miami, Florida <br /> <br />16. EDUCATION (DEGREE AND SPECIALlZA nON) <br />Master's of Science/ Engineering/ Civil Engineering and <br />Environmental Sciences <br />Bachelor's of Science/ Engineering/ Civil Engineering and <br />Environmental Sciences <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />FU Professional Engineer <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations. Training. Awards. elC) <br />American Society of Highway Engineers <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and Stale) (2) YEAR COMPLETED <br /> Lithia Pincrest Road PD&E Study and Four-Laning PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> 2008 <br />a. (3) BRIEF DESCRIPTION (Brief scope. size. cas!. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> The project consists of the preliminary study and design for a 4-lane widening of approximately 1.6 miles of existing 2-lane <br /> roadway. The study included Right-of-Way needs assessment, title searched, appraisals, typical section analysis, various <br /> alignment analysis, and preliminary cost estimating. The final design includes the final plans for permitting and construction for a 4- <br /> lane urban divided section. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Belle Terre Parkway Four Lane Design - PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> City of Palm Coast, FL 2007 2008 <br />b. (3) BRIEF DESCRIPTION (Brief scope, size. cost. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Task consisted of widening 4.2 miles of an existing 2-lane rural road to a 4-lane urban divided road, designing the stormwater <br /> management system, five new signalized intersections, and permitting through St. Johns River Water Management District. <br /> The project included utility coordination with Florida Power & Light, and the City of Palm Coast. Utility Department <br /> (1) TITLE AND LOCATION (CityandSfate) (2) YEAR COMPLETED <br /> Rhode Island Avenue and Westside Parkway PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> Vol usia County, FL 2007 2008 <br />c. (3) BRIEF DESCRIPTION (Brief scope, size, cas!. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Task consisted of designing a new 2-lane divided rural road with raised curbed median, and re-design of an existing signalized intersection, Design included <br /> a 2-lane typical section that can be widened in the future to a 4-lane urban road with minimal construction. The stormwater management system was <br /> designed to collect and treat the runoff from the current 2-lane rural road, but also has the capacity and the infrastructure in place to handle the future <br /> widening utilizing the same stormwater pipe/treatment system. Permitting included stormwater permitting through 5t. Johns River Water Management <br /> District and FOOT District 5 Drivewav Connection Permit. <br /> (1) TITLE AND LOCATION (City and Slate) (2) YEAR COMPLETED <br /> Michigan Ave. Widening PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> Kissimmee, FL 2002 2003 <br />d. (3) BRIEF DESCRIPTION (Brief scope, size. cost. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Project Manager - CPH provided roadway design services for the widening of Michigan Avenue from the existing 3 - lane (two <br /> through lanes and one continuous left turn lane), rural section to a 5 - lane, urban typical section. <br /> (1) TITLE AND LOCATION (Cily and Slale) (2) YEAR COMPLETED <br /> Indiana Avenue Streetscape Project PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> DeLand, FL 2004 2004 <br />e. (3) BRIEF DESCRIPTION (Brief scope, size. cost, etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Project Manager - East Indiana Avenue is a two-way, two-lane facility east of Woodland Boulevard to Alabama Avenue, which <br /> was streetscaped to conform with the streetscape design of West Indiana Avenue and Woodland Boulevard in downtown <br /> DeLand. All of the existing asphalt pavement on East Indiana Avenue was removed from the top of the original 6" thick <br /> concrete roadway, and replaced with Briick pavens. <br /> <br />STANDARD FORM 330 (1/2004) PAGE 2 <br />