Laserfiche WebLink
<br />12. NAME <br />CharlesJensen,CET <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />Com fete one Section E for each ke erson. <br />13. ROLE IN THIS CONTRACT <br />Project Designer <br /> <br />14. YEARS EXPERIENCE <br />a. TOTAL b. WITH CURRENT FIRM <br />32 28 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />CPH Engineers, Inc./Miami, Florida <br /> <br />16. EDUCATION (DEGREE AND SPECIALlZA nON) <br />AS in Engineering Technology <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />None <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations. Training. Awards, etc) <br />Certified Engineering Technician through NICET, (National Institute of Certified Engineering Technicians) <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> City of Palm Coast Water Treatment Plant No.3 PROFESSIONAL SERVICES CONSTRUCTION (II Applicable) <br /> City of Palm Coast, FL 2006 2008 <br />a. (3) BRIEF DESCRIPTION (Briel scope. size, cost. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Design and Construction of a 9 MGD (3 MGD first phase), Low Pressure Reverse Osmosis Water Treatment Plant. This project <br /> included the construction of an operations building, LPRO building, clear well, chemical building, generator building, 2 MG ground <br /> storage tank, and associated pumps and piping. Construction cost, $17,000,000.00 <br /> (1) TITLE AND LOCATION (Cily and Slale) (2) YEAR COMPLETED <br /> Volusia County Utilities Southeast Regional Water Reclamation Facility PROFESSIONAL SERVICES CONSTRUCTION (II Applicable) <br /> Oakhill, FL 2000 2003 <br />b. (3) BRIEF DESCRIPTION (Briel scope. size, cost. elc) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Design and Construction of a 0.5 MGD expandable to 1.2 MDG oxidation ditch wastewater treatment facility. This project <br /> consisted in the design and construction of an oxidation ditch (Orbal process), Clarifiers, tertiary filters, chlorine contact chamber, <br /> transfer pumps, 2 MG ground storage tank, irrigation pump station, grove irrigation system and operations building. The <br /> construction price for this project was $4,500,000.00 <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Vol usia County Utilities Southwest Regional Water Reclamation Facility PROFESSIONAL SERVICES CONSTRUCTION (II Applicable) <br /> Expansion, DeBary, FL 1998 2001 <br />c. (3) BRIEF DESCRIPTION (Briel scope. size. cost etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Design and Construction of the expansion of the Southwest Regional WRF from 0.5 MGD to 1.2 MGD, to include the construction <br /> of a 1.5 MG ground storage tank, adding an outer ring to the oxidation ditch, constructing reclaimed water distribution pump station, <br /> and associated pumps piping and controls. Construction Cost $3,000,000.00 <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Volusia County Utilities Deltona North Water Reclamation Facility PROFESSIONAL SERVICES CONSTRUCTION (II Applicable) <br /> Improvements, Deltona, FL 1996 1999 <br />d. (3) BRIEF DESCRIPTION (Briel scope. size. cost etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Design and Construction services for improvements to Volusia County's Water Reclamation Facility to provide tertiary filters, 1 MG <br /> ground storage tank, high level disinfection, reclaimed water distribution pump station, and associated pumps piping and controls. <br /> Construction Cost $2,500,000.00 <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Digester Improvements for Deltona North Wastewater Treatment Plant PROFESSIONAL SERVICES CONSTRUCTION (II Applicable) <br /> For Volusia County Utilities, Deltona, FL 1994 1996 <br />e. (3) BRIEF DESCRIPTION (Briel scope, size. cost. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Design and Construction of an aerobic digester for the Deltona North Wastewater Treatment Plant, consisted of providing sludge <br /> handling facilities consisting of a 250,000 gallon digester with blowers, aeration system and associated pumps, piping and <br /> electrical work. Construction cost $200,000.00 <br /> <br />STANDARD FORM 330 (1/2004) PAGE 2 <br />