<br />12. NAME
<br />CharlesJensen,CET
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />Com fete one Section E for each ke erson.
<br />13. ROLE IN THIS CONTRACT
<br />Project Designer
<br />
<br />14. YEARS EXPERIENCE
<br />a. TOTAL b. WITH CURRENT FIRM
<br />32 28
<br />
<br />15. FIRM NAME AND LOCATION (City and State)
<br />CPH Engineers, Inc./Miami, Florida
<br />
<br />16. EDUCATION (DEGREE AND SPECIALlZA nON)
<br />AS in Engineering Technology
<br />
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />None
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations. Training. Awards, etc)
<br />Certified Engineering Technician through NICET, (National Institute of Certified Engineering Technicians)
<br />
<br />19. RELEVANT PROJECTS
<br />
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> City of Palm Coast Water Treatment Plant No.3 PROFESSIONAL SERVICES CONSTRUCTION (II Applicable)
<br /> City of Palm Coast, FL 2006 2008
<br />a. (3) BRIEF DESCRIPTION (Briel scope. size, cost. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
<br /> Design and Construction of a 9 MGD (3 MGD first phase), Low Pressure Reverse Osmosis Water Treatment Plant. This project
<br /> included the construction of an operations building, LPRO building, clear well, chemical building, generator building, 2 MG ground
<br /> storage tank, and associated pumps and piping. Construction cost, $17,000,000.00
<br /> (1) TITLE AND LOCATION (Cily and Slale) (2) YEAR COMPLETED
<br /> Volusia County Utilities Southeast Regional Water Reclamation Facility PROFESSIONAL SERVICES CONSTRUCTION (II Applicable)
<br /> Oakhill, FL 2000 2003
<br />b. (3) BRIEF DESCRIPTION (Briel scope. size, cost. elc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
<br /> Design and Construction of a 0.5 MGD expandable to 1.2 MDG oxidation ditch wastewater treatment facility. This project
<br /> consisted in the design and construction of an oxidation ditch (Orbal process), Clarifiers, tertiary filters, chlorine contact chamber,
<br /> transfer pumps, 2 MG ground storage tank, irrigation pump station, grove irrigation system and operations building. The
<br /> construction price for this project was $4,500,000.00
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Vol usia County Utilities Southwest Regional Water Reclamation Facility PROFESSIONAL SERVICES CONSTRUCTION (II Applicable)
<br /> Expansion, DeBary, FL 1998 2001
<br />c. (3) BRIEF DESCRIPTION (Briel scope. size. cost etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
<br /> Design and Construction of the expansion of the Southwest Regional WRF from 0.5 MGD to 1.2 MGD, to include the construction
<br /> of a 1.5 MG ground storage tank, adding an outer ring to the oxidation ditch, constructing reclaimed water distribution pump station,
<br /> and associated pumps piping and controls. Construction Cost $3,000,000.00
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Volusia County Utilities Deltona North Water Reclamation Facility PROFESSIONAL SERVICES CONSTRUCTION (II Applicable)
<br /> Improvements, Deltona, FL 1996 1999
<br />d. (3) BRIEF DESCRIPTION (Briel scope. size. cost etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
<br /> Design and Construction services for improvements to Volusia County's Water Reclamation Facility to provide tertiary filters, 1 MG
<br /> ground storage tank, high level disinfection, reclaimed water distribution pump station, and associated pumps piping and controls.
<br /> Construction Cost $2,500,000.00
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Digester Improvements for Deltona North Wastewater Treatment Plant PROFESSIONAL SERVICES CONSTRUCTION (II Applicable)
<br /> For Volusia County Utilities, Deltona, FL 1994 1996
<br />e. (3) BRIEF DESCRIPTION (Briel scope, size. cost. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
<br /> Design and Construction of an aerobic digester for the Deltona North Wastewater Treatment Plant, consisted of providing sludge
<br /> handling facilities consisting of a 250,000 gallon digester with blowers, aeration system and associated pumps, piping and
<br /> electrical work. Construction cost $200,000.00
<br />
<br />STANDARD FORM 330 (1/2004) PAGE 2
<br />
|