My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CPH
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-01) Prof. Engineering Svcs.
>
Responses
>
CPH
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2010 8:47:11 AM
Creation date
11/17/2010 8:46:49 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Engineering Svcs.
Bid No. (xx-xx-xx)
10-04-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />12. NAME <br />Nicki M. McKenzie <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />Com lete one Section E for each ke <br />13. ROLE IN THIS CONTRACT <br />Project Designerffransportation <br /> <br /> <br />14. YEARS EXPERIENCE <br />a. TOTAL b. WITH CURRENT FIRM <br />35 2 <br /> <br />15. FIRM NAME AND LOCATION (CityandStale) <br />CPH Engineers, Inc./Miami, Florida <br /> <br />16. EDUCATION (DEGREE AND SPECIALlZA nON) <br />Roadway Design and Quality Control <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br /> <br />Intermediate Work Zone <br />Traffic Control MOT ApprovallD #40 <br />Qualified Stormwater Management Inspector #4026 <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publica lions, Organizations. Training. Awards. etc) <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (2) YEAR COMPLETED <br /> (1) TITLE AND LOCATION (CityandSlale) PROFESSIONAL SERVICES CONSTRUCTION (11 Applicable) <br /> Bell Shoals Road Four Lane Design - Newland Communities and <br /> Hillsborough County NC5016 CIP 69112 2006 pending <br />a. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br /> New construction of 3.2 miles of an existing 2-lane road to a 4-lane urban divided road with bridge widening and the design of the <br /> stormwater management system, five signalized intersections, and permitting through Southwest Florida Water Management <br /> District. The project includes utility coordination. <br /> (1) TITLE AND LOCATION (City and Slate) (2) YEAR COMPLETED <br /> Lithia Pincrest Road PD&E Study and Four-Laning PROFESSIONAL SERVICES CONSTRUCTION (11 Applicable) <br /> 2008 <br />b. (3) BRIEF DESCRIPTION (Brief scope. size, cost etc) AND SPECIFIC ROLE [X] Check if project performed with current firm <br /> The project consists of the preliminary study and design for a 4-lane widening of approximately 1.6 miles of existing 2-lane <br /> roadway. The study included Right-of-Way needs assessment, title searched, appraisals, typical section analysis, various <br /> alignment analysis, and preliminary cost estimating. The final design includes the final plans for permitting and construction for a 4- <br /> lane urban divided section. <br /> (2) YEAR COMPLETED <br /> (1) TITLE AND LOCATION (CityandState) PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br />C. (3) BRIEF DESCRIPTION (Brief scope. size. cost, elc) AND SPECIFIC ROLE [X] Check if project performed with current firm <br /> (1) TITLE AND LOCATION (CityandState) (2) YEAR COMPLETED <br /> PROFESSIONAL SERVICES CONSTRUCTION (11 Applicable) <br />d. (3) BRIEF DESCRIPTION (Brief scope, size, cost. elc) AND SPECIFIC ROLE [X] Check if project perfonned with current firm <br /> (1) TITLE AND LOCATION (CityandState) (2) YEAR COMPLETED <br /> PROFESSIONAL SERVICES CONSTRUCTION (11 Applicable) <br />e. (3) BRIEF DESCRIPTION (Brief scope. size. cost, etc) AND SPECIFIC ROLE [X.] Check if project performed with current firm <br /> <br />STANDARD FORM 330 (1/2004) PAGE 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.