Laserfiche WebLink
<br />12. NAME <br />Katriina Bowman, P.E. <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />Com fete one Section E for each ke erson. <br />13. ROLE IN THIS CONTRACT <br />Project Engineer <br /> <br />14. YEARS EXPERIENCE <br />a. TOTAL b. WITH CURRENT FIRM <br />19 17 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />CPH Engineers, Inc./Miami, Florida <br /> <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />Master's of Science/ Civil Engineering/ Clemson University/ 1988 <br />Bachelor's of Science/ Civil Engineering/ Clemson University/ 1986 <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />FL/ Professional Engineer <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publica lions. Organizations. Training. Awards, etc) <br />Certified Construction Specifier - Construction Specifications Institute (CSI)/ Qualified Stormwater Management Inspector (FDEP) <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Mill Creek & Cloud Branch Drainage Improvements PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> Sanford, FL 2000 2000 <br />a. (3) BRIEF DESCRIPTION (Brief scope. size. cost. elc) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Project Engineer <br /> The Mill Creek and Cloud Branch drainage basins are approximately t 980 acres located within the northwestem portion of the City. CPH's services included reviewing earlier <br /> reports, conducting field visits, gathering updated information, interviewing City and County staff, reviewing jurisdictional considerations, and establishing an existing condition <br /> and proposed improvements stormwater modeling and overall report that was used to obtain an Individual MSSW Permit from the SJRWMD. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> 2nd Street Stormwater Improvements PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> Sanford, FL 1999 1999 <br />b. (3) BRIEF DESCRIPTION (Brief scope. size. cost. elc) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Project Engineer <br /> The new stormwater system along Second Street consists of approximately 2400 lineal feet of storm sewer, ranging in size from 60" RCP to 6' x 7' concrete box <br /> culvert. Along a significant portion of the box culvert route along Second Street, the surface of the street was brick. An alignment of the new stormwater <br /> system was chosen to accommodate removal and replacement of the 27" sanitary sewer system. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> St. John's Parkway Phase 1 & 3 PROFESS~NALSERV~ES CONSTRUCTION (If Applicable) <br /> Sanford, FL 2004 2004 <br />C. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Project Engineer <br /> This project consisted of widening existing roadway and constructing new four lane divided roadway east and west of the Smith Canal. CPH's services <br /> included design, permitting through the SJRWMD, and CEI services. Design included extensive stormwater modeling to serve construction of four new <br /> stormwater ponds, diverting offsite flows around the ponds, and sizing of an arch culvert at the canal crossing. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Marina Island Improvements PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> Sanford, FL 2005 2005 <br />d. (3) BRIEF DESCRIPTION (Brief scope. size. cosl. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Project Engineer <br /> The Project consists of the construction of over 1300 linear feet of new seawall and shoreline stabalization (aluminum sheet pile with concrete revetment <br /> cap) along the north shore of Marina Island at Lake Monroe in downtown Sanford. CPH's services included design, permitting through FDEP. <br /> (1) TITLE AND LOCATION (Cily and State) (2) YEAR COMPLETED <br /> City of Sanford U.S. 17-92 Utility Relocation PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> Sanford, FL 2000 <br />e. (3) BRIEF DESCRIPTION (Brief scope. size. cosl, elc) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Project Engineer - This project consisted of relocating the City's 20" reclaimed water main (seasonal discharge line) along the construction area serving <br /> new ramps and stormwater structures on U.S. 17-92 at 1-4. CPH's services included design, permitting, attending utility coordination meetings, assisting <br /> the City with the preparation and submittal of the FOOT Utility Work Agreement and Utility Work Schedule, preparing and submitting invoicing for <br /> reimbursement from FOOT on behalf of the City, plus bidding and construction phase services. <br /> <br />STANDARD FORM 330 (1/2004) PAGE 2 <br />