Laserfiche WebLink
<br />12. NAME <br />Rocco N. Nasso, P.E. <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />Com tete one Section E for each ke <br />13. ROLE IN THIS CONTRACT <br />Project Engineer <br /> <br /> <br />14. YEARS EXPERIENCE <br />a. TOTAL b. WITH CURRENT FIRM <br />9 8 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />CPH Engineers, Inc./Miami, Florida <br /> <br />16. EDUCATION (DEGREE AND SPECIALlZA nON) <br />B.S. Civil Engineering, University of Central Florida <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Licensed Professional Engineer - Florida (No. 64727) <br />Qualified Stormwater Management Inspector (FDEP) <br />Intermediate Maintenance of Traffic Certification <br />OSHA Construction Safety and Health Certification <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations. Training, Awards. elc.) <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Sanford Gasification Plant - OU3 Feasibility Study Hydraulic Modeling PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> Sanford, FL 2007 N/A <br />a. (3) BRIEF DESCRIPTION (Brief scope. size. cost. elc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Conduct existing conditions modeling to establish pre-construction flows and levels, conduct preliminary hydraulic analysis / <br /> stormwater modeling for open channel and culvert options associated with the OU3 to assess the current proposed remedy in <br /> terms of the hydrologic design of the proposed stormwater conveyance system along 1600' of the Cloud Branch drainage channel. <br /> (1) TITLE AND LOCATION (City and Stale) (2) YEAR COMPLETED <br /> Cloud Branch Phase 2 Drainage Improvements PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> Sanford, FL 2007 pending <br />b. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Stormwater modeling using ICPR, permitting through the SJRWMD and CSX, construction of a 4.3 acre stormwater pond, 550-ft <br /> channel improvements, street crossing culvert upgrades. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Cloud Branch Phase 1 Drainage Improvements PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> Sanford, FL 2007 2007 <br />c. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Stormwater modeling using ICPR, permitting through the SJRWMD, construction of a 2.8 acre stormwater pond, regrading of <br /> approximately 2800 linear feet of existing channel, upgrading road crossing culverts with new box culvert sized 3' x 7' to 4' x 6'. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Orlando-Sanford International Airport Lift Stations and Force Mains PROFESSIONAL SERVICES CONSTRUCTION (1f Applicable) <br /> 2006 2006 <br />d. (3) BRIEF DESCRIPTION (Brief scope. size. cost. elc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Design, permitting, bidding, and CEI services for the construction of two new lift stations, removal of one existing lift station, <br /> removal of an abandoned WWTP, construction of 1300' of 20" FM, 11600' of 10"-12" FM, 1900' of 8"-12" sanitary sewer, and 3700' <br /> of 12" WM. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> St. Johns Parkway Ph. 1 and Ph. 3 Construction PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> Sanford, FL 2004 2004 <br />e. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Stormwater modeling using ICPR, permitting through the SJRWMD, widening existing roadway and constructing new four lane <br /> divided roadway, storm sewer ranging in size from 15"-60" to 48"x76", adjacent offsite parcel regrading and coordinating with two <br /> separate developers for the construction of joint use ponds on the privately owned parcels, enclosure of existing roadside swales <br /> via the installation of new culverts along the roadway. <br /> <br />STANDARD FORM 330 (1/2004) PAGE 2 <br />