Laserfiche WebLink
<br />12. NAME <br />Aaron P. Moore <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />Com lete one Section E for each ke erson. <br />13. ROLE IN THIS CONTRACT <br />Environmental Scientist <br /> <br />14. YEARS EXPERIENCE <br />a. TOTAL b. WITH CURRENT FIRM <br />9 3 <br /> <br />15. FIRM NAME AND LOCATION (Cilyandslate) <br />CPH Engineers, Inc./Miami, Florida <br /> <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />B.S. Biology, University of Central Florida <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Southwest Florida Water Management District, Soils <br />Identification Course, Army Corps of Engineers <br />Management Training and Certified Delineator No. 3975 <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Pub/icalions. Organizations. Training. Awards. elc) <br />Florida Association of Environmental Professionals, CLE International- Florida Wetlands Annual Conference, Orange County <br />Christmas Creek Restoration Workshops, Wetland Training Institute-Plant Identification, Florida Citrus Sports, Home Builders <br />Association <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and Slate) (2) YEAR COMPLETED <br /> Palm Coast, Florida Consumptive Use Permit PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> On-going On-going <br />a. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Wetland delineation and monitoring, apply and obtain wetland impact permits for utility infrastructure from Florida Department of <br /> Environmental Protection, Army Corps of Engineers, Flagler County and the St. Johns River Water Management District, gopher tortoise <br /> survey, permitting and relocation,. Complete wetland harm assessment for predicted withdrawals to the surficial aquifer and implement a <br /> monitoring program for wetlands with potential for harm with annual reporting to the St. Johns River Water Management District. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Port Orange, Florida-Eastpointe Business Park PROFESSIONAL SERVICES CONSTRUCTION (If Appticab/e) <br /> 2006 2007 <br />b. (3) BRIEF DESCRIPTION (Brief scope. size. COSI. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Project scientist responsible fore performing an emergency gopher tortoise survey and relocation for the City of Port Orange after Florida <br /> Fish and Wildlife Conservation Commission determined the project was in violation of State and Federal rules. Tasks included surveying <br /> the project site for protected species, expediting the permitting process with the FFWCC, making arrangements to allow the project to <br /> avoid being shut down and relocation of gopher tortoises. <br /> (1) TITLE AND LOCATION (Cilyand Stale) (2) YEAR COMPLETED <br /> Indian Trails Sports Complex Mitigation Area, Palm Coast, Florida PROFESSIONAL SERVICES CONSTRUCTION (If Appticab/e) <br /> On-going On-going <br />C. (3) BRIEF DESCRIPTION (Brief scope. size. cost. elc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Project scientist in charge of producing a mitigation plan for the City of Palm Coast for utilization for various City public work <br /> projects. Tasks included creating, operation, management and obtaining approval for a mitigation plan over 100 acres of City land <br /> with a 1 O-year prescribed burning land management and monitoring program. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Belle Terre Parkway Improvements- Palm Coast, Florida PROFESSIONAL SERVICES CONSTRUCTION (If Appticab/e) <br /> 2007 On-going <br />d. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Project scientist in charge of obtaining Army Corp of Engineers and St. Johns River Water Management District Environmental <br /> Resource Permits for roadway improvements to Belle Terre Parkway. Tasks included meetings with regulatory and city staff, <br /> wetland delineation, impact analysis on flora and fauna, protected species surveys and mitigation planning. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Lake Alfred, Florida- Water Use Permit PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> 2006 On-going <br />e. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Project scientist in charge of identifying wetlands within the City for continued monitoring during the duration of the Water Use <br /> Permit. Tasks included writing an Environmental Monitoring Program detailing wetland impact analysis and monitoring <br /> recommendations to the Southwest Florida Water Management District, meetings with District staff and field investigations and <br /> wetland assessments. <br /> <br />STANDARD FORM 330 (1/2004) PAGE 2 <br />