Laserfiche WebLink
<br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, If not specified. <br />Comolete one Section F for each oroiect.) <br />21. TITLE AND LOCATION (CityandSlale) <br />Volusia County -Continuing Contract <br />Vol usia County, FL <br /> <br />20. EXAMPLE PROJECT KEY <br />NUMBER <br /> <br />4 <br /> <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES I CONSTRUCTION (if Applicable) <br />Ongoing Ongoing <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br />a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER <br />Vol usia County Ms. Mary Anne Connors 386.736.5965 <br /> <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />CPH has been providing design and construction services to Vol usia County since 1974. Projects have included water, wastewater, stormwater, <br />roadway, parks, and trails. The team has provided services that include engineering, landscape architecture, architecture, planning, surveying, <br />environmental science, and construction administration. Some of the most recent projects for the County include: <br /> <br />Southwest Wastewater Treatment Plant- CPH provided planning, design (including environmental, civil, structural, electrical, etc.), permitting <br />(construction and operating), and services during construction for a .5 MGD wastewater treatment plant. The plant was designed for future expansion to <br />2 MGD. Initial effluent disposal was accomplished through use of on-site percolation ponds. The plant was designed to meet Class I Reliability Criteria. <br />The design includes: Headworks, Biological treatment system, Clarification, Chlorination, Sludge handling, Effluent pump station, Operations building, <br />and Percolation ponds. <br /> <br />Tenth Street - This task consisted of reconstructing 1.2 miles of an existing 2-lane rural road to a 4-lane divided urban road. <br />The proposed cross-section included four 12-ft lanes with 4-ft bike lanes in both directions. CPH also assisted Vol usia County <br />by preparing Right of Way Maps, and legal sketches and descriptions for the additional right of way and pond sites. The <br />Maintenance of Traffic was also a critical element to maintain and ensure full access to two schools, by both vehicles and <br />pedestrians, during construction. <br /> <br />~ <br /> <br />Rhode Island Avenue- Task consisted of designing 1.4 miles of a new 2-lane divided rural road with a raised curb median, and re-design of an existing <br />signalized intersection at US 17-92. The design included a 2-lane cross section that can be widened in the future to a 4-lane urban road with minimal <br />construction. The stormwater management system was designed to collect and treat runoff from the current 2-lane rural road, but also has the capacity <br />and the infrastructure in place to handle the future widening utilizing the same storm water pipe/treatment system. <br /> <br />Spring Hill Park/Trail - Engineering and Landscape Architectural services for the expansion of Spring Hill Park. CPH provided <br />preliminary engineering and site planning along with construction estimates. Assistance was provided to the client in public <br />presentations and community meetings. The final product consisted of phased construction plans with final engineering, a <br />basketball court, restroom facility, tot lot, and pavilion. The existing walking trail was expanded to encompass the additional <br />park area. Park landscaping was improved to provide shade to trails and vegetation screening at parking areas. <br /> <br />Lake Monroe Trail - CPH prepared the design for a 12' wide multi-purpose trail approximately 2.4 miles in length which winds <br />through wetlands, wooded uplands and open pasture land. Designs of elevated wooden boardwalks were provided to reduce <br />impact to existing wetlands. The Trail begins at Lake Monroe Park and terminates at Gemini Springs Park. The project included <br />preparation of construction documents, coordination and permitting with the Water Management District as well as the Division <br />of Historical Resources and CPH also provided CEI Services. <br /> <br />".'~'~~ . .,.~"~~~~~,,{!~' <br />'-~:"'-l( ':tl'''j,.'' <br />~ft.- \."" ...---.. <br />~ .:- ~ - -,_~_tf~ . ~ . <br />...~~ <br />.... ..~ I z: <br />:'~~I"li " ~ i.. <~~ <br /> <br />ll'.J:~ ,:<!'.;' .. <br />"ll~tl f< "'J -", [.,. <br />.... TA:~ ~~~," !:.t. <br />~; ~;11 ;J"~.. ~~ <br />~,-~. ...~"'!tit., ,~ <br />.A:..'~" ~ I if;, <br />';-:--' - '""'\ <br />_- II"" ';......~ __\- <br />-... ." - , <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br /> (1) FIRM NAME (2) FIRM LOCATION (City and Stale) (3) ROLE <br />a. CPH Engineers, Inc. Miami, FL Prime <br /> (1) FIRM NAME (2) FIRM LOCATION (City and Stale) (3) ROLE <br />b. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />C. <br /> (1) FIRM NAME (2) FIRM LOCATION (Cily and State) (3) ROLE <br />d. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />e. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and Stale) (3) ROLE <br />1. <br />