<br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
<br />QUALIFICATIONS FOR THIS CONTRACT
<br />(Present as many projects as requested by the agency, or 10 projects, If not specified.
<br />Comolete one Section F for each oroiect.)
<br />21. TITLE AND LOCATION (CityandSlale)
<br />Volusia County -Continuing Contract
<br />Vol usia County, FL
<br />
<br />20. EXAMPLE PROJECT KEY
<br />NUMBER
<br />
<br />4
<br />
<br />22. YEAR COMPLETED
<br />PROFESSIONAL SERVICES I CONSTRUCTION (if Applicable)
<br />Ongoing Ongoing
<br />
<br />23. PROJECT OWNER'S INFORMATION
<br />
<br />a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER
<br />Vol usia County Ms. Mary Anne Connors 386.736.5965
<br />
<br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
<br />CPH has been providing design and construction services to Vol usia County since 1974. Projects have included water, wastewater, stormwater,
<br />roadway, parks, and trails. The team has provided services that include engineering, landscape architecture, architecture, planning, surveying,
<br />environmental science, and construction administration. Some of the most recent projects for the County include:
<br />
<br />Southwest Wastewater Treatment Plant- CPH provided planning, design (including environmental, civil, structural, electrical, etc.), permitting
<br />(construction and operating), and services during construction for a .5 MGD wastewater treatment plant. The plant was designed for future expansion to
<br />2 MGD. Initial effluent disposal was accomplished through use of on-site percolation ponds. The plant was designed to meet Class I Reliability Criteria.
<br />The design includes: Headworks, Biological treatment system, Clarification, Chlorination, Sludge handling, Effluent pump station, Operations building,
<br />and Percolation ponds.
<br />
<br />Tenth Street - This task consisted of reconstructing 1.2 miles of an existing 2-lane rural road to a 4-lane divided urban road.
<br />The proposed cross-section included four 12-ft lanes with 4-ft bike lanes in both directions. CPH also assisted Vol usia County
<br />by preparing Right of Way Maps, and legal sketches and descriptions for the additional right of way and pond sites. The
<br />Maintenance of Traffic was also a critical element to maintain and ensure full access to two schools, by both vehicles and
<br />pedestrians, during construction.
<br />
<br />~
<br />
<br />Rhode Island Avenue- Task consisted of designing 1.4 miles of a new 2-lane divided rural road with a raised curb median, and re-design of an existing
<br />signalized intersection at US 17-92. The design included a 2-lane cross section that can be widened in the future to a 4-lane urban road with minimal
<br />construction. The stormwater management system was designed to collect and treat runoff from the current 2-lane rural road, but also has the capacity
<br />and the infrastructure in place to handle the future widening utilizing the same storm water pipe/treatment system.
<br />
<br />Spring Hill Park/Trail - Engineering and Landscape Architectural services for the expansion of Spring Hill Park. CPH provided
<br />preliminary engineering and site planning along with construction estimates. Assistance was provided to the client in public
<br />presentations and community meetings. The final product consisted of phased construction plans with final engineering, a
<br />basketball court, restroom facility, tot lot, and pavilion. The existing walking trail was expanded to encompass the additional
<br />park area. Park landscaping was improved to provide shade to trails and vegetation screening at parking areas.
<br />
<br />Lake Monroe Trail - CPH prepared the design for a 12' wide multi-purpose trail approximately 2.4 miles in length which winds
<br />through wetlands, wooded uplands and open pasture land. Designs of elevated wooden boardwalks were provided to reduce
<br />impact to existing wetlands. The Trail begins at Lake Monroe Park and terminates at Gemini Springs Park. The project included
<br />preparation of construction documents, coordination and permitting with the Water Management District as well as the Division
<br />of Historical Resources and CPH also provided CEI Services.
<br />
<br />".'~'~~ . .,.~"~~~~~,,{!~'
<br />'-~:"'-l( ':tl'''j,.''
<br />~ft.- \."" ...---..
<br />~ .:- ~ - -,_~_tf~ . ~ .
<br />...~~
<br />.... ..~ I z:
<br />:'~~I"li " ~ i.. <~~
<br />
<br />ll'.J:~ ,:<!'.;' ..
<br />"ll~tl f< "'J -", [.,.
<br />.... TA:~ ~~~," !:.t.
<br />~; ~;11 ;J"~.. ~~
<br />~,-~. ...~"'!tit., ,~
<br />.A:..'~" ~ I if;,
<br />';-:--' - '""'\
<br />_- II"" ';......~ __\-
<br />-... ." - ,
<br />
<br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
<br />
<br /> (1) FIRM NAME (2) FIRM LOCATION (City and Stale) (3) ROLE
<br />a. CPH Engineers, Inc. Miami, FL Prime
<br /> (1) FIRM NAME (2) FIRM LOCATION (City and Stale) (3) ROLE
<br />b.
<br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
<br />C.
<br /> (1) FIRM NAME (2) FIRM LOCATION (Cily and State) (3) ROLE
<br />d.
<br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
<br />e.
<br /> (1) FIRM NAME (2) FIRM LOCATION (City and Stale) (3) ROLE
<br />1.
<br />
|