Laserfiche WebLink
<br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, If not specified. <br />Complete one Section F for each proiect.J <br />21. TITLE AND LOCATION (City and State) <br />Sanford Continuing Contract <br />Sanford, Florida <br /> <br />20. EXAMPLE PROJECT KEY <br />NUMBER <br /> <br />5 <br /> <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES I CONSTRUCTION (if Applicable) <br />1998 1999 <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />407.330.5640 <br /> <br />a. PROJECT OWNER <br />City of Sanford <br /> <br />b. POINT OF CONTACT NAME <br />Mr. Paul Moore, P.E. - <br /> <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />CPH has been providing design and construction services to the City of Sanford since 1958. Projects have included water, wastewater, storm water, <br />roadway, parks, and trails. The team has provided services that include engineering, landscape architecture, architecture, planning, surveying, <br />environmental science, and construction administration. Some of the most recent projects for the City include: <br /> <br />1st Streetscape/Gateway Improvements - CPH is currently contracted with the City of Sanford to provide a streetscape <br />design package for a 6 block section of Historic First Street. The intent of this project is to closely match the streetscape of <br />improvements previously completed on First Street. Close coordination with City Staff involved in adjacent projects is of <br />utmost importance as we provide seamless transition from one phase to another. Plans and services include the <br />conceptual and final design of a Gateway feature introducing the historic district. CPH conducted design charettes to <br />ensure input and direction from City officials and other interested parties. CPH is currently providing final design services <br />for the final package that will include: Sidewalk and street curb layout, Planting and paver design, Parking layout, Irrigation <br />plans, Lighting and electrical plan, Site furniture selection and layout, Streetscape details, and Gateway entrance <br />architectural design details. <br /> <br />Sanford South Water Resource Center - This included the design and construction of the new Sanford South Water <br />Resource Center.The Sanford South uses energy efficient treatment processes and cutting-edge technologies to produce <br />a public access quality effluent. Reclaimed water is distributed throughout the City of Sanford service area consisting of <br />150 miles of distribution piping. Sanford South construction includes the following: Headworksstructure with odor control <br />system, Energy efficient oxidation ditch biological treatment systern, Office/laboratory building, Tertiavy filtration of the <br />secondary effluent, Sodium hypochlorite storage and handling facilities, Chlorine contact chamber, Effluent transfer pump <br />station, Solids handling facility and Class A sludge treatment system, Reclaimed water distribution pump station, City-wide <br />SCADA control systern, 3 MG reclairned water ground storage tank, 2 MG reject water ground storage tank, Internal <br />roadways, Fencing, Landscaping, Yard piping, and Storm water management system <br /> <br />St. Johns Parkway (Phases I, II & III) - CPH provided services for Phases I and II of the St. Johns Parkway project <br />consisting of widening existing Jewett Lane (renamed St. Johns Parkway) from the Smith Canal to approximately 400-feet <br />west of Meisch Road, resulting in 1,650 linear feet of new three-lane road. Major project components included: 28-foot <br />span (7-Ioot rise by 72-foot long) concrete arch culvert, Wingwalls at the Canal, Curb and Gutter, Sidewalk, Guardrail, <br />Aluminum Handrail, Storm Sewer, and Utilities construction of approximately 1,750 linear feet of new 12-inch water main <br />and 1,900 linear feet of new 8-inch reclaimed water rnain. Phase III of the St. Johns Parkway project additionally included <br />construction of approximately 2,800 linear feet of new four-lane divided roadway between Rinehart Road and Upsala Road. <br /> <br /> <br /> <br /> <br />City of Sanford - Bio-Solid Gasification System- CPH is working with Max West Environmental Systems Inc. to provide a Design, Build, Operate, <br />Finance project that will utilize the Cities current biosolids (sludge) to generate heat to operate their existing sludge driers. This unique system uses <br />Sanford's wastewater treatment plant's biosolids residuals to provide a green energy solution for the City. The Max West system will provide heat <br />through a gasification process that will eliminate the current use of natural gas to provide heat to the driers. <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />a. CPH Engineers, Inc. Miami, FL Prime <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />b. <br /> (1) FIRM NAME (2) FIRM LOCATION (Cily and State) (3) ROLE <br />c. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and Slate) (3) ROLE <br />d. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and Stale) (3) ROLE <br />e. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />f. <br />