Laserfiche WebLink
<br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, If not specified. <br />Complete one Section F for each proiect.) <br />21. TITLE AND LOCATION (CilyandSlale) <br />Orange County - Continuing Services Contract <br />Orange County, FL <br /> <br />20. EXAMPLE PROJECT KEY <br />NUMBER <br /> <br />6 <br /> <br />22. YEAR COMPLETED <br /> <br />PROFESSIONAL SERVICES I CONSTRUCTION (if Applicable) <br />Ongoing Ongoing <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br />a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER <br />Orange County Mr. Gary Morris, P.E. (407) 254-9711 <br /> <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope. size, and cost) <br /> <br />CPH has been providing design and construction services to Orange County since 1985. Projects have included water, wastewater, <br />stormwater, roadway, parks, and trails. The team has provided services that include engineering, landscape architecture, architecture, <br />planning, surveying, environmental science, and construction administration. Some of the most recent projects for the County include: <br /> <br />S.R. 50 Utility Relocation Project - This project provides improvements to over 13 miles of the water distribution system and <br />wastewater collection and transmission system within the S.R. 50 Corridor, one of the busiest roads in Central Florida - which is being <br />expanded from 4-lanes to 6-Janes. The utility improvements include building new facilities as well as the removal of facilities in conflict <br />with the FOOT roadway design. The utility improvements will be constructed as part of the construction of the FOOT S.R. 50 projects <br />under a Joint Agreement between Orange County and FOOT. The construction documents meet FOOT plan preparation standards, <br />FOOT roadway design schedule and are coordinated with the FOOT road design and other utilities. The project includes the <br />installation of approximately 5.5 miles of 8,12,16,20 and 24-inch diameter water main and 7.7 miles of 4,8,12,16,20 and 30-inch <br />diameter FM along S.R. 50 from west S.R. 436 to Old Cheney Road (the Project). Connection of existing services and lateral mains <br />will be required while maintaining service to customers. <br /> <br />S.R. 528 Utility Relocation Project - This project was initiated by Orange County Utilities (OCU) to relocate a 16" forcemain as a <br />result of the bridge widening of SR 528 from 1-4 to the Airport Toll Plaza. The widening of the SR 528 had the potential to impact lines <br />owned and maintained by Orange County in Multiple locations. The challenges of this project included replacing the 16" forcemain with <br />a new 30" forcemain within the John Young Parkway right-of-way under the existing SR 528 bridge, having minimal disruption to the <br />roadway and still maintain operation to the existing forcemain. The project included two 54" jack and bores of 280 feet and 60 ft each, <br />three 16" lines stops, two large thrust blocks, and 1,500 feet of 30" forcemain. The construction documents meet FOOT and Turnpike <br />plan preparation standards, FOOT roadway design schedule, and were coordinated with the FOOT road design and other utilities. <br /> <br />Lake Standish Heights Water System Improvements - The Project consisted of the design of approximately 3600 LF of 6" and 8" <br />water main, fittings, valves and appurtenances to replace an existing substandard water distribution system. CPH prepared a <br />Preliminary Design Memorandum that outlined the pipeline alignment, permitting requirements, presentation of known future plans of <br />other utilities and agencies for the project area and presented conclusions and recommendations for the execution of the project. CPH <br />also provided construction drawings and technical specifications for the project prepared the appropriate applications and obtained the <br />water permit from FOEP and a utility permit from FOOT. CPH also performed limited inspection services, shop drawing review, post <br />design services, attendance at progress meetings, as-built drawings, clearance letter, certification of completion of construction, <br />substantial completion and final inspections. <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br /> (1) FIRM NAME (2) FIRM LOCATION (CilyandState) (3) ROLE <br />a. CPH Engineers, Inc. Miami, FL Prime <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />b. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />c. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />d. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />e. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />f. <br />