Laserfiche WebLink
<br />12, NAME <br />Timothy K. Blankenship, P.E. <br /> <br /> <br />15, FIRM NAME AND LOCATION (Citv and State) <br />~,',' Coastal Systems International <br />....' Coral Gables, Florida <br /> <br />16, EDUCATION (DEGREE AND SPECIALlZA nON) <br />M.Sc./Coastal Engineering <br />B.S./Civil Engineering <br /> <br />17, CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Professional Engineer, Florida, Virginia <br /> <br />18, OTHER PROFESSIONAL QUALIFICATIONS (Publications. Oroanizations. Trainino. Awards. etc.) <br />Mr. Blankenship has over 15 years of experience in the civil and coastal engineering fields. His broad range of experience includes projects <br />involving waterfront facility assessment and rehabilitation design, bridge engineering projects involving structural assessment, structural <br />design and hydraulic analysis/design; land development projects including drainage design and environmental permitting, and construction <br />phase services for several civil projects. <br /> <br />PROFESSIONAL AFFILIATIONS <br />Florida Engineering Society, American Society of Civil Engineers (Past-President, Miami-Dade Branch), ASCE Ports and Harbors Committee - Engineer/Diver <br />Standard Task Committee <br />Marinas 2020 Committee <br /> <br />PUBLICATIONS <br />"Dune Management on an Urban Coast," T,K, Blankenship, C. Brush and J. Rubin Presented at 2005 FSBPA Conference <br /> <br />'"To Repair or Replace a Bulkhead: That is the Question," Marina Dockage, 2004 <br /> <br />"Artificial Reef Construction: An Engineered Approach," R, H. Sasso, T.K. Blankenship, S. Higgins, and K, Banks, Feb. 2004, National Conference in <br />Beach Preservation Technology <br />"Mooring Buoys for the Largest Cruise Ship in the World," J. Juhl, R.H, Sasso, T,K, Blankenship, and B. Johansen, Proceedings of Ports 2001 Conference <br /> <br />r ......._-......... ""'. "_-.,.r><~~-~ ~ ---. 'mltI:1 ~ 1II=l'/~~ ~. rUi :{;~i:i~ i-"i .-....,"'............-.,-..... ....,.., ] <br /> (1) TITLE AND LOCATION (Citv and State) 121 YEAR COMPLETED <br /> Bayfront Street Ends Improvements, Miami Beach, Florida PROFESSIONAL SERVICES I CONSTRUCTION (It applicable) <br /> 2009 2011 (Est.) <br />a. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE [g] Check if project performed with current firm <br /> Streetscape design for street ends at South Shore Drive, 10th Street and Lincoln Road to improve upland access to the <br /> waterfront. Paving, grading, drainage lighting and landscape/hardscape improvements. <br /> (1) TITLE AND LOCATION (Citv and State) 121 YEAR COMPLETED <br /> Beachwalk, Miami Beach, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> 2005 2005 <br />b. (3) BRIEF DESCRIPTION (Briel scope. size. cost. etc.) AND SPECIFIC ROLE [g] Check if project performed with current firm <br /> Civil/coastal engineering design and environmental permitting for the 4,000 foot on grade paver walkway that connects <br /> Lummus Park north to 21st Street in the South Beach district of Miami Beach, along with associated amenities and <br /> landscaping. <br /> (1) TITLE AND LOCATION (Citv and State) 12\ YEAR COMPLETED <br /> Capri South Beach, Miami Beach, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> 2008 2008 <br /> (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE [g] Check if project performed with current firm <br />C. Paving, grading and drainage design for 3 residential complexes with a total 72 units and an underground parking <br /> garage next to Biscayne Bay, covering two city blocks. Design included water main extensions for each street, fire, <br /> sanitary services, street ends and storm drainage system improvement for the neighborhood with associated pump <br /> stations. <br /> (1) TITLE AND LOCATION (Citv and State) 121 YEAR COMPLETED <br /> Indian Creek Greenway, Miami Beach, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> 2007 N/A <br />d. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE [g] Check if project performed with current firm <br /> Planning and environmental permitting for pedestrian waterfront recreational corridor extending from 23rd Street to 29th <br /> Street along the Indian Creek Waterway. Conducted hydrographic/marine surveys and shoreline stabilization studies. <br /> (1) TITLE AND LOCATION (Citvand State) 121 YEAR COMPLETED <br /> North Beach Recreational Corridor (NBRC), Miami Beach, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> 2009 2009 <br /> (3) BRIEF DESCRIPTION (Brief scooe, size, cost, etc,) AND SPECIFIC ROLE [g] Check if project performed with current firm <br /> Site/Civil engineering services include paving and grading for 6,700 LF of multi-purpose public access corridor to <br /> traverse along the western edge of the beach dunes between 64th Street and 79th Street. Design includes dune <br />e. enhancements, landscaping, electrical and water service for irrigation. <br />