Laserfiche WebLink
<br /> 11\ TITLE AND LOCATION fCitv and State) <br /> .Jose Marti Park, Miami Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> 2008 2008 <br />f. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.! AND SPECIFIC ROLE [RJ Check if proiect performed with current firm <br /> Site/civil engineering for 1-acre project site development with a community gymnasium. Paving, grading and stormwater <br /> management designs were completed and water/sewer services were provided to the site. Street improvements were <br /> designed for Southwest 5th Street. <br /> (1) TITLE AND LOCATION (City and State) 12' YEAR COMPLETED <br /> Little Haiti Cultural Center, Miami, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> 2008 2009 <br />g. (3) BRIEF DESCRIPTION fBrief scooe, size, cost. etc.! AND SPECIFIC ROLE [RJ Check if proiect performed with current firm <br /> Site/civil engineering for a 1.5 acre site development with a cultural center and theater. Paving, grading and stormwater <br /> management designs were completed and water/sewer services were provided to the site including a water main <br /> extension. Street imorovements were desianed alonq with three (3) oarkina lots totalina 180 soaces. <br /> (1) TITLE AND LOCATION fCitv and State) 10' Vt:AC ~~..n' rTrn <br /> South Pointe Park, Miami Beach, Florida PROFESSIONAL SERVICES rONSTRUCTION (If applicable) <br /> 2009 2009 <br />h. (3\ BRIEF DESCRIPTION fBrief scooe, size, cost. etc.! AND SPECIFIC ROLE [RJ Check if proiect performed with current firm <br /> Civil design and coastal/environmental permitting of a multi-purpose recreational park area for structural, hardscape, and <br /> landscape improvements in excess of 16 acres. Activities include the construction of a main park structure with <br /> offices/concessionlrestrooms, a storage facility for park vehicles, a raised serpentine walkway, and playground facilities. <br /> (1) TITLE AND LOCATION fCitv and State) 10' <br /> Museum Park, Miami, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Ongoing Ongoing <br /> (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc,) AND SPECIFIC ROLE [RJ Check if project performed with current firm <br />i. Design and permitting of mooring dolphin structures as part of 22-acre city park on Biscayne Bay. Sixteen pile-supported <br /> dolphin structures provide 750 feet of mooring space within the existing FEC slip to accommodate a variety of ships <br /> include tall ships up to 350 feet long. Structures are supported by 24-inch concrete piles with concrete caps providing <br /> 50-ton bollards along with fender systems. <br /> (1) TITLE AND LOCATION (Citv and State) 12' YEAR COMPLETED <br /> Hadley Park, Miami, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Ongoing N/A <br />j. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc,) AND SPECIFIC ROLE [RJ Check if project performed with current firm <br /> Civil engineering design including ground stabilization for fire truck access, stormwater drainage, water and sewer for a <br /> new park pavilion/amenity building within the City of Miami's Hadley Park. <br /> (1) TITLE AND LOCATION (City and State) 12\ YEAR COMPLETED <br /> 10.h Street Auditorium, Miami Beach, Florida PROFESSIONAL SERVICES TCONSTRUCTION (If applicable) <br /> 2009 2009 <br />k. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.! AND SPECIFIC ROLE [RJ Check if project performed with current firm <br />Civil design and environmental permitting for the City of Miami Beach's 10th Street Auditorium and Beach Patrol <br /> Headquarters. The design included restoration of the two buildings to include new water and sewer service, as well as <br /> connections to the adjacent public restrooms. <br /> 11\ TITLE AND LOCATION (City and State) 12' YEAR COMPLETED <br /> The Clevelander Hotel, Miami Beach, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> 2006 2009 <br />I. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.! AND SPECIFIC ROLE [RJ Check if proiect performed with current firm <br /> Civil engineering design and environmental permitting for the renovations including a new drainage system, water and <br /> sewer services, and site grading to accommodate the existing adjacent public sidewalks. <br /> (1) TITLE AND LOCATION (City and State) 12\ YEAR COMPLETED <br /> Sunny Isles Shoreline Stabilization, Sunny Isles Beach, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> 2008 N/A <br /> (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc,) AND SPECIFIC ROLE [RJ Check if project performed with current firm <br />m. Coastal Systems conducted an assessment of local sediment transport characteristics and the potential for shoreline <br /> stabilization within the City of Sunny Isles Beach. An evaluation of nearshore coastal processes and sediment transport <br /> characteristics in the Project vicinity was completed. Based on the assessment, a long-term beach management plan <br /> was prepared for long-term beach planning. <br /> (1) TITLE AND LOCATION (Citv and State) 12\ YEAR COMPLETED <br /> Miami-Dade Truck Haul, Miami-Dade County, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> 2008 Ongoing <br />n. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.! AND SPECIFIC ROLE [RJ Check if project performed with current firm <br /> Design of truck haul nourishment for erosional hot spot at 27th, 44th and 55th streets in Miami Beach with a total of <br /> 110,000 cy of sand. <br /> <br />STANDARD FORM 330 (6/2004) PAGE 2 <br />