<br />
<br />e
<br />
<br />12, NAME
<br />Craig McGillawee
<br />
<br />13, ROLE IN THIS CONTRACT
<br />Waterfront Project Engineer
<br />
<br />14, YEARS EXPERIENCE
<br />a, TOTAL b, WITH CURRENT FIRM
<br />3 2
<br />
<br />15, FIRM NAME AND LOCATION (City and State)
<br />~,"',.' Coastal Systems International
<br />'. .~.- Coral Gables, Florida
<br />,VITIM.
<br />
<br />16, EDUCATION (DEGREE AND SPECIALIZATION)
<br />B.S./Civil Engineering, Minor in Structural Engineering
<br />
<br />17, CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />
<br />18, OTHER PROFESSIONAL QUALIFICATIONS (Publications. Oraanizations. Trainina. Awards. etc.!
<br />Mr. McGillawee has a diverse range of experience in many facets of engineering design and construction management. Mr. McGillawee is
<br />responsible for engineering design, project management and construction administration on a variety of projects that include marinas,
<br />shoreline stabilization and marine and civil structures. He has designed numerous waterfront structures that include bulkheads, piers,
<br />mooring/berthing structures, wave attenuators and 5yncrolift hoist systems. Mr. McGillawee completes most of his design and construction
<br />work using a variety of structural and civil software that includes 5T AAD. Pro. and AutoCAD. He is trained and experienced in the use of
<br />Primavera Expedition software for construction document management, including: construction plans, shop drawings, site visits, RFl's, and
<br />other related documents.
<br />
<br />[ ~ :t'/~~~. ifir:reJlI :(eji-'i 1
<br /> (1) TITLE AND LOCATION (City and State) 12\ YEAR COMPLETED
<br /> Dinner Key Marina, Miami, Florida PROFESSIONAL SERVICES I CONSTRUCTION (/I applicable)
<br /> 2009 2009
<br />a. (3) BRIEF DESCRIPTION (Briel scope. size. cost. etc.! AND SPECIFIC ROLE [8] Check if project performed with current firm
<br /> Design and environmental permitting of deck replacement, access gate improvements, and maintenance dredging for
<br /> 582-slip marina.
<br /> (1) TITLE AND LOCATION (City and State) 12\ YEAR COMPLETED
<br /> Miamarina - Pier 5 Replacement at Bayside, Miami, Florida PROFESSIONAL SERVICES T CONSTRUCTION (II applicable)
<br />b. 2009 2009
<br /> (3) BRIEF DESCRIPTION (Briel scope. size. cost. etc,) AND SPECIFIC ROLE [8] Check if proiect performed with current firm
<br /> Assessment, environmental permitting and design of replacement docks for nineteen slips at Pier 5.
<br /> (1) TITLE AND LOCATION (City and State) 12\ YEAR COMPLETED
<br /> Biscayne Bay Yacht Club, Miami, Florida PROFESSIONAL SERVICES I CONSTRUCTION (II applicable)
<br /> 2007 2007
<br />c.
<br /> (3) BRIEF DESCRIPTION (Briel scope. size. cost. etc.! AND SPECIFIC ROLE [8] Check if project performed with current firm
<br /> Design of 82-slip marina in Coconut Grove consisting of concrete fixed docks. Design of marina utilities.
<br /> (1) TITLE AND LOCATION (City and State) 12\ YEAR COMPLETED
<br /> Bluepoints Marina at Port Canaveral, Brevard County, Florida PROFESSIONAL SERVICES I CONSTRUCTION (II applicable)
<br /> 2009 2009
<br />d. (3) BRIEF DESCRIPTION (Briel scope, size. cost. etc.! AND SPECIFIC ROLE [8] Check if project performed with current firm
<br /> Marina design and environmental permitting for a 10-acre dry storage marina facility, including 940 dry slips, 1 0 wet
<br /> slips, and 33 launching/holding slips. Hydrographic and marine resource surveys conducted.
<br /> (1) TITLE AND LOCATION (Citv and State) 12\ YEAR COMPLETED
<br /> Munyon Island Small Boat Docking Facility, Palm Beach County, PROFESSIONAL SERVICES I CONSTRUCTION (II applicable)
<br />e. Florida 2004 2010 (Est.)
<br /> 13\ BRIEF DESCRIPTION IBriel scooe, size, cost. etc,) AND SPECIFIC ROLE [8] Check if oroiect oerformed with current firm
<br /> Design of floating dock 30-slip marina for day dockage within pile crib breakwater.
<br /> 11 \ TITLE AND LOCATION ICity and State) I <'T~C\
<br /> Rybovich Spencer Boatyard, West Palm Beach, Florida PROFESSIONAL SERVICES I CONSTRUCTION (II applicable)
<br /> 2008 2008
<br />f. (3) BRIEF DESCRIPTION (Briel scope. size. cost. etc,) AND SPECIFIC ROLE [8] Check if project performed with current firm
<br /> Design of dredging and bulkhead for 150-slip marina redevelopment to accommodate vessels up to 250 feet long.
<br /> Design of 100,000 cubic yards of dredging and 3,000 feet of bulkhead along with travel lift piers to accommodate 660-ton
<br /> lift. Coastal engineering analysis for floating structure design.
<br /> (1) TITLE AND LOCATION (City and State) 12\ YEAR COMPLETED
<br /> Fort Myers Boat Club, Fort Myers, Florida PROFESSIONAL SERVICES I CONSTRUCTION (II applicable)
<br /> 2008 2011 (Est.)
<br /> 13\ BRIEF DESCRIPTION IBriel scooe, size, cost. etc,) AND SPECIFIC ROLE [8] Check if proiect performed with current firm
<br /> Redevelopment of existing 26-acre marina site for 340 dry slips and 95 wet slips designed for 200 feet of steel and vinyl
<br />g. sheet pile bulkhead along with forklift launching platforms and 75-ton travel lift piers. Designed mangrove planters and
<br />provided marine environmental compliance monitoring.
<br />
|