Laserfiche WebLink
<br /> <br />e <br /> <br />12, NAME <br />Craig McGillawee <br /> <br />13, ROLE IN THIS CONTRACT <br />Waterfront Project Engineer <br /> <br />14, YEARS EXPERIENCE <br />a, TOTAL b, WITH CURRENT FIRM <br />3 2 <br /> <br />15, FIRM NAME AND LOCATION (City and State) <br />~,"',.' Coastal Systems International <br />'. .~.- Coral Gables, Florida <br />,VITIM. <br /> <br />16, EDUCATION (DEGREE AND SPECIALIZATION) <br />B.S./Civil Engineering, Minor in Structural Engineering <br /> <br />17, CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br /> <br />18, OTHER PROFESSIONAL QUALIFICATIONS (Publications. Oraanizations. Trainina. Awards. etc.! <br />Mr. McGillawee has a diverse range of experience in many facets of engineering design and construction management. Mr. McGillawee is <br />responsible for engineering design, project management and construction administration on a variety of projects that include marinas, <br />shoreline stabilization and marine and civil structures. He has designed numerous waterfront structures that include bulkheads, piers, <br />mooring/berthing structures, wave attenuators and 5yncrolift hoist systems. Mr. McGillawee completes most of his design and construction <br />work using a variety of structural and civil software that includes 5T AAD. Pro. and AutoCAD. He is trained and experienced in the use of <br />Primavera Expedition software for construction document management, including: construction plans, shop drawings, site visits, RFl's, and <br />other related documents. <br /> <br />[ ~ :t'/~~~. ifir:reJlI :(eji-'i 1 <br /> (1) TITLE AND LOCATION (City and State) 12\ YEAR COMPLETED <br /> Dinner Key Marina, Miami, Florida PROFESSIONAL SERVICES I CONSTRUCTION (/I applicable) <br /> 2009 2009 <br />a. (3) BRIEF DESCRIPTION (Briel scope. size. cost. etc.! AND SPECIFIC ROLE [8] Check if project performed with current firm <br /> Design and environmental permitting of deck replacement, access gate improvements, and maintenance dredging for <br /> 582-slip marina. <br /> (1) TITLE AND LOCATION (City and State) 12\ YEAR COMPLETED <br /> Miamarina - Pier 5 Replacement at Bayside, Miami, Florida PROFESSIONAL SERVICES T CONSTRUCTION (II applicable) <br />b. 2009 2009 <br /> (3) BRIEF DESCRIPTION (Briel scope. size. cost. etc,) AND SPECIFIC ROLE [8] Check if proiect performed with current firm <br /> Assessment, environmental permitting and design of replacement docks for nineteen slips at Pier 5. <br /> (1) TITLE AND LOCATION (City and State) 12\ YEAR COMPLETED <br /> Biscayne Bay Yacht Club, Miami, Florida PROFESSIONAL SERVICES I CONSTRUCTION (II applicable) <br /> 2007 2007 <br />c. <br /> (3) BRIEF DESCRIPTION (Briel scope. size. cost. etc.! AND SPECIFIC ROLE [8] Check if project performed with current firm <br /> Design of 82-slip marina in Coconut Grove consisting of concrete fixed docks. Design of marina utilities. <br /> (1) TITLE AND LOCATION (City and State) 12\ YEAR COMPLETED <br /> Bluepoints Marina at Port Canaveral, Brevard County, Florida PROFESSIONAL SERVICES I CONSTRUCTION (II applicable) <br /> 2009 2009 <br />d. (3) BRIEF DESCRIPTION (Briel scope, size. cost. etc.! AND SPECIFIC ROLE [8] Check if project performed with current firm <br /> Marina design and environmental permitting for a 10-acre dry storage marina facility, including 940 dry slips, 1 0 wet <br /> slips, and 33 launching/holding slips. Hydrographic and marine resource surveys conducted. <br /> (1) TITLE AND LOCATION (Citv and State) 12\ YEAR COMPLETED <br /> Munyon Island Small Boat Docking Facility, Palm Beach County, PROFESSIONAL SERVICES I CONSTRUCTION (II applicable) <br />e. Florida 2004 2010 (Est.) <br /> 13\ BRIEF DESCRIPTION IBriel scooe, size, cost. etc,) AND SPECIFIC ROLE [8] Check if oroiect oerformed with current firm <br /> Design of floating dock 30-slip marina for day dockage within pile crib breakwater. <br /> 11 \ TITLE AND LOCATION ICity and State) I <'T~C\ <br /> Rybovich Spencer Boatyard, West Palm Beach, Florida PROFESSIONAL SERVICES I CONSTRUCTION (II applicable) <br /> 2008 2008 <br />f. (3) BRIEF DESCRIPTION (Briel scope. size. cost. etc,) AND SPECIFIC ROLE [8] Check if project performed with current firm <br /> Design of dredging and bulkhead for 150-slip marina redevelopment to accommodate vessels up to 250 feet long. <br /> Design of 100,000 cubic yards of dredging and 3,000 feet of bulkhead along with travel lift piers to accommodate 660-ton <br /> lift. Coastal engineering analysis for floating structure design. <br /> (1) TITLE AND LOCATION (City and State) 12\ YEAR COMPLETED <br /> Fort Myers Boat Club, Fort Myers, Florida PROFESSIONAL SERVICES I CONSTRUCTION (II applicable) <br /> 2008 2011 (Est.) <br /> 13\ BRIEF DESCRIPTION IBriel scooe, size, cost. etc,) AND SPECIFIC ROLE [8] Check if proiect performed with current firm <br /> Redevelopment of existing 26-acre marina site for 340 dry slips and 95 wet slips designed for 200 feet of steel and vinyl <br />g. sheet pile bulkhead along with forklift launching platforms and 75-ton travel lift piers. Designed mangrove planters and <br />provided marine environmental compliance monitoring. <br />