My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Coastal Systems International, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-01) Prof. Engineering Svcs.
>
Responses
>
Coastal Systems International, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2010 9:16:42 AM
Creation date
11/17/2010 9:16:26 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Engineering Svcs.
Bid No. (xx-xx-xx)
10-04-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> (1) TITLE AND LOCATION ICitv and State) I?\ V~A" fY)MPI ~T~n <br /> Pier 66, Fort Lauderdale, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Ongoing Ongoing <br />h. /3\ BRIEF DESCRIPTION IBriel scooe, size, cost. etc,) AND SPECIFIC ROLE [ID Check if proiect pertormed with current firm <br /> Design and environmental permitting for 100-slip marina redevelopment. Design of fixed and floating docks to <br /> accommodate a diverse slip mix from 60 to 250 feet vessels. Designed marina utilities (shore power, sewage pump-out, <br /> fire protection, communications) and upland water service upgrade. <br /> /1\ TITLE AND LOCATION ICitvand State) f?\ V~A" ~^..n' rT~~ <br /> Island Gardens Mega Yacht Harbour, Miami, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Ongoing N/A <br />i. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE [ID Check if project pertormed with current firm <br /> Marina design and environmental permitting for 40 slip megayacht harbor on Watson Island as part of $600M site <br /> redevelopment. Hydrographic and marine resource surveys conducted and underwater bulkhead assessments provided. <br /> (1) TITLE AND LOCATION (Citv and State) 12\ YEAR COMPLETED <br /> Hidden Harbor, Pompano Beach, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> 2009 2009 <br />j. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE [ID Check if project pertormed with current firm <br /> Planning and design of 384-slip dry stack marina. Design of steel sheet piling bulkhead and associated land reclamation <br /> area. Design of the concrete marine forklift launching platform supported on augercast piling and layout of floating <br /> staqinq docks. <br /> (1) TITLE AND LOCATION (City and State) 12\ YEAR COMPLETED <br /> Dinner Key Managed Mooring Field, Miami, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> 2009 2009 <br />k. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc,) AND SPECIFIC ROLE [ID Check if project pertormed with current firm <br /> Design and environmental permitting of 225-slip managed mooring field. Conducted hydrographic surveys, jet probes, <br /> and marine resource surveys. Prepared construction plans and specifications, and provided construction administration <br /> services including underwater inspection. <br /> (1) TITLE AND LOCATION (Citv and State) 12\ YEAR r.nMPLETED <br /> Jensen Beach Managed Mooring Field, Martin County, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Ongoing Ongoing <br />I. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE [ID Check if project pertormed with current firm <br /> Design and environmental permitting of 70-slip managed mooring field. Prepared feasibility study to evaluate waterfront <br /> opportunities for wet slips and managed mooring field configurations. Conducted hydrographic and marine resource <br /> surveys, and funding grant administration. <br /> (1) TITLE AND LOCATION (Citv and State) 12\ YEAR COMPLETED <br /> Ambergris Cay, Turks and Caicos PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Ongoing Ongoing <br />m. /3\ BRIEF DESCRIPTION IBrief scooe, size, cost. etc,) AND SPECIFIC ROLE [ID Check if proiect pertormed with current firm <br /> Prepared Environmental Impact Assessment (EIA) for development of private island. Pertormed hydrographic and GPS <br /> control surveys. Engineering design of coastal works including entrance channel, dredging, 150-slip marina, and RO/RO <br /> platform for shipments to remote island. <br /> (1) TITLE AND LOCATION (Citv and Stale) <br /> 360 Condominiums Development, North Bay Village, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> 2004 2007 <br />n. (3) BRIEF DESCRIPTION (Brief scope. size. coSI. etc,) AND SPECIFIC ROLE IKI Check if project performed with current firm <br /> Civil engineering, bulkhead, and 27-slip marina design, including coordination and support of utility design, marine <br /> resource assessment, environmental permitting for new docking facility. Designed and developed 100% construction <br /> documents for docking facility. <br /> (1) TITLE AND LOCATION (Citv and State) 12\ YEAR COMPLETED <br /> Biscayne Bay Yacht Club, Miami, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> 2007 2007 <br />o. <br /> (3) BRIEF DESCRIPTION (Brief scope, size. cost. etc.) AND SPECIFIC ROLE [8] Check if project performed with current firm <br /> Design of 82-slip marina in Coconut Grove consisting of concrete fixed docks. Design of marina utilities. <br /> <br />STANDARD FORM 330 (6/2004) PAGE 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.