<br />
<br />.
<br />
<br />
<br />12, NAME
<br />Aaron Boehning
<br />
<br />13, ROLE IN THIS CONTRACT
<br />Project Surveyor
<br />
<br />a, TOTAL
<br />8
<br />
<br />15, FIRM NAME AND LOCATION (Citvand State)
<br />k~,':.. Coastal Systems International
<br />I . ,~,: Coral Gables, Florida
<br />
<br />16, EDUCATION (DEGREE AND SPECtALlZA T/ON)
<br />Civil Engineering Technology Degree
<br />Construction Managernent Technology Degree
<br />
<br />17, CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />Coast Guard Captain
<br />
<br />18, OTHER PROFESSIONAL QUALIFICATIONS (Publications. Oraanizations. Trainina. Awards. etc,)
<br />Mr. Boehning has extensive experience collecting field data in the coastal/marine environment. He has planned and conducted beach profile
<br />surveys throughout the State of Florida for a variety of purposes including contract payment, monitoring, and post-hurricane assessments.
<br />These surveys have also required topographic and geodetic control surveys for the land-based work.
<br />
<br />CERTIFICATIONS
<br />Haz Mat Certification and Nuclear Gauge Safety Training
<br />
<br />r ~ ~'I"~.I'(;I:[.J111 :(etIi-"1 ,
<br /> (1) TITLE AND LOCATION (Citv and State) /2\ YEAR COMPLETED
<br /> Rickenbacker Causeway Recreation Area, Miami - Dade County, PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> Florida Ongoing 2010 (Est.)
<br /> (3) BRIEF DESCRIPTION (Brief SCODe, size. cost. etc,) AND SPECIFIC ROLE 1RI Check if project performed with current firm
<br />a. Design of shoreline stabilization and associated public recreation area improvements along 2.5-miles of shoreline of the
<br /> Rickenbacker Causeway across Biscayne Bay. Marine resource and hydrographic surveys cornpleted, and coastal
<br /> engineering analysis conducted to assess design wave conditions, sedirnent transport and optimum shoreline
<br /> stabilization methods. Design elements included landscaping, invasive species removal with native species restoration,
<br /> parking improvements, stormwater management and vendor kiosks for waterfront activities.
<br /> (1) TITLE AND LOCATION (Citvand State) 12\ YEAR COMPLETED
<br /> Village of Key Biscayne Beach Nourishment, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> Ongoing 2002
<br />b. (3) BRIEF DESCRIPTION (Brief SCODe. size. cost. etc,) AND SPECIFIC ROLE 1RI Check if proiect performed with currenl firm
<br /> Coastal engineering and environmental permitting for 120,000 cubic yard beach fill project. Marine resource and
<br /> hydrographic surveys conducted, along with sand source search, jet probes, vibracores and marine archeological
<br /> surveys.
<br /> (1) TITLE AND LOCATION (Citv and State) 12\ YEAR COMPLETED
<br /> Hillsboro Inlet Channel Improvements, Broward County, Florida PROFESSIONAL SERVICES -r CONSTRUCTION (If applicable)
<br /> Ongoing 2002
<br />c. (3) BRIEF DESCRIPTION (Brief SCODe. size. cost. etc,) AND SPECIFIC ROLE 1RI Check if project performed with current firm
<br /> Coastal engineering and environmental permitting for 165,000 cubic yard inlet-dredging project to improve coastal
<br /> sediment sand bypassing and navigation. Hydrographic and marine resource surveys conducted.
<br /> (1) TITLE AND LOCATION (Citv and State) 12\ YEAR COMPLETED
<br /> Hillsboro/Deerfield Beach Restoration, Broward County, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> Ongoing 2010 (Est.)
<br />d. (3) BRIEF DESCRIPTION IBrief SCODe, size, cost. etc,) AND SPECIFIC ROLE [8] Check if proiect performed with current firm
<br /> Coastal engineering and environmental permitting for 550,000 cubic yard beach fill project. Performed all beach profiles,
<br /> hydrographic surveys, aerial photography, magnetometer surveys and monitoring.
<br /> (1) TITLE AND LOCATION ICitvand State I 10\ v<::", rm'D' <::T<::n
<br /> Cap Cana Marine Works, Punta Cana, Dominican Republic PROFESSIONAL sERVICEsl CONSTRUCTION (If applicable)
<br /> 2006 2008
<br />e. (3) BRIEF DESCRIPTION (Brief SCODe. size. cost. etc,) AND SPECIFIC ROLE 1RI Check if project performed with current firm
<br /> Coastal engineering design for the dredging of 1.25-mile canal to create basin for 1,000+ slip marina. Design of shoreline
<br /> stabilization, beaches, entrance channel jetties, numerical modeling of coastal processes and hydrographic surveying.
<br /> (1) TITLE AND LOCATION (Citv and State) 12\ YEAR COMPLETED
<br /> Dinner Key Marina, Coconut Grove, Florida PROFESSIONAL SERVICES I CONSTRUCTION (ff applicable)
<br /> Ongoing 2009
<br />f. (3) BRIEF DESCRIPTION (Brief SCODe. size. cost. etc,) AND SPECIFIC ROLE 1RI Check if project performed with current firm
<br /> Design and environmental permitting of deck replacement, access gate improvements and maintenance dredging for
<br /> 582-slip marina.
<br /> (1) TITLE AND LOCATION (Citv and State) 12\ YEAR cnMPLETED
<br /> Fort Zachary Taylor State Park, Key West, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> 2007 2007
<br />g. (3) BRIEF DESCRIPTION (Brief SCODe. size. cost. etc,) AND SPECIFIC ROLE 1RI Check if project performed with current firm
<br />Coastal engineering design and environmental permitting for breakwaters, jetties and beach fill project for shoreline
<br /> protection at park.
<br />
|