Laserfiche WebLink
<br /> <br />. <br /> <br /> <br />12, NAME <br />Aaron Boehning <br /> <br />13, ROLE IN THIS CONTRACT <br />Project Surveyor <br /> <br />a, TOTAL <br />8 <br /> <br />15, FIRM NAME AND LOCATION (Citvand State) <br />k~,':.. Coastal Systems International <br />I . ,~,: Coral Gables, Florida <br /> <br />16, EDUCATION (DEGREE AND SPECtALlZA T/ON) <br />Civil Engineering Technology Degree <br />Construction Managernent Technology Degree <br /> <br />17, CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Coast Guard Captain <br /> <br />18, OTHER PROFESSIONAL QUALIFICATIONS (Publications. Oraanizations. Trainina. Awards. etc,) <br />Mr. Boehning has extensive experience collecting field data in the coastal/marine environment. He has planned and conducted beach profile <br />surveys throughout the State of Florida for a variety of purposes including contract payment, monitoring, and post-hurricane assessments. <br />These surveys have also required topographic and geodetic control surveys for the land-based work. <br /> <br />CERTIFICATIONS <br />Haz Mat Certification and Nuclear Gauge Safety Training <br /> <br />r ~ ~'I"~.I'(;I:[.J111 :(etIi-"1 , <br /> (1) TITLE AND LOCATION (Citv and State) /2\ YEAR COMPLETED <br /> Rickenbacker Causeway Recreation Area, Miami - Dade County, PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Florida Ongoing 2010 (Est.) <br /> (3) BRIEF DESCRIPTION (Brief SCODe, size. cost. etc,) AND SPECIFIC ROLE 1RI Check if project performed with current firm <br />a. Design of shoreline stabilization and associated public recreation area improvements along 2.5-miles of shoreline of the <br /> Rickenbacker Causeway across Biscayne Bay. Marine resource and hydrographic surveys cornpleted, and coastal <br /> engineering analysis conducted to assess design wave conditions, sedirnent transport and optimum shoreline <br /> stabilization methods. Design elements included landscaping, invasive species removal with native species restoration, <br /> parking improvements, stormwater management and vendor kiosks for waterfront activities. <br /> (1) TITLE AND LOCATION (Citvand State) 12\ YEAR COMPLETED <br /> Village of Key Biscayne Beach Nourishment, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Ongoing 2002 <br />b. (3) BRIEF DESCRIPTION (Brief SCODe. size. cost. etc,) AND SPECIFIC ROLE 1RI Check if proiect performed with currenl firm <br /> Coastal engineering and environmental permitting for 120,000 cubic yard beach fill project. Marine resource and <br /> hydrographic surveys conducted, along with sand source search, jet probes, vibracores and marine archeological <br /> surveys. <br /> (1) TITLE AND LOCATION (Citv and State) 12\ YEAR COMPLETED <br /> Hillsboro Inlet Channel Improvements, Broward County, Florida PROFESSIONAL SERVICES -r CONSTRUCTION (If applicable) <br /> Ongoing 2002 <br />c. (3) BRIEF DESCRIPTION (Brief SCODe. size. cost. etc,) AND SPECIFIC ROLE 1RI Check if project performed with current firm <br /> Coastal engineering and environmental permitting for 165,000 cubic yard inlet-dredging project to improve coastal <br /> sediment sand bypassing and navigation. Hydrographic and marine resource surveys conducted. <br /> (1) TITLE AND LOCATION (Citv and State) 12\ YEAR COMPLETED <br /> Hillsboro/Deerfield Beach Restoration, Broward County, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Ongoing 2010 (Est.) <br />d. (3) BRIEF DESCRIPTION IBrief SCODe, size, cost. etc,) AND SPECIFIC ROLE [8] Check if proiect performed with current firm <br /> Coastal engineering and environmental permitting for 550,000 cubic yard beach fill project. Performed all beach profiles, <br /> hydrographic surveys, aerial photography, magnetometer surveys and monitoring. <br /> (1) TITLE AND LOCATION ICitvand State I 10\ v<::", rm'D' <::T<::n <br /> Cap Cana Marine Works, Punta Cana, Dominican Republic PROFESSIONAL sERVICEsl CONSTRUCTION (If applicable) <br /> 2006 2008 <br />e. (3) BRIEF DESCRIPTION (Brief SCODe. size. cost. etc,) AND SPECIFIC ROLE 1RI Check if project performed with current firm <br /> Coastal engineering design for the dredging of 1.25-mile canal to create basin for 1,000+ slip marina. Design of shoreline <br /> stabilization, beaches, entrance channel jetties, numerical modeling of coastal processes and hydrographic surveying. <br /> (1) TITLE AND LOCATION (Citv and State) 12\ YEAR COMPLETED <br /> Dinner Key Marina, Coconut Grove, Florida PROFESSIONAL SERVICES I CONSTRUCTION (ff applicable) <br /> Ongoing 2009 <br />f. (3) BRIEF DESCRIPTION (Brief SCODe. size. cost. etc,) AND SPECIFIC ROLE 1RI Check if project performed with current firm <br /> Design and environmental permitting of deck replacement, access gate improvements and maintenance dredging for <br /> 582-slip marina. <br /> (1) TITLE AND LOCATION (Citv and State) 12\ YEAR cnMPLETED <br /> Fort Zachary Taylor State Park, Key West, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> 2007 2007 <br />g. (3) BRIEF DESCRIPTION (Brief SCODe. size. cost. etc,) AND SPECIFIC ROLE 1RI Check if project performed with current firm <br />Coastal engineering design and environmental permitting for breakwaters, jetties and beach fill project for shoreline <br /> protection at park. <br />