Laserfiche WebLink
<br /> (1) TITLE AND LOCATION (Citv and State) 12\ YEAR COMPLETED <br /> Cap Juluca Beach Restoration, Anguilla, B.W.I. PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> 2008 2009 <br />h. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE [RI Check if project performed with current firm <br />Assessment of 2,000 feet in Maunday's Bay of beach after Hurricane Ike in 2008, and design of emergency beach <br /> restoration project with approximately 20,000 cubic yards of sand. Provided contract payment hydrographic surveys and <br /> construction management. <br /> (1) TITLE AND LOCATION (City and State) 12\ YEAR COMPLETED <br /> Dinner Key Managed Mooring Field, Miami, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> 2009 2009 <br />i. (3) BRIEF DESCRIPTION IBrief scooe, size, cost. etc.} AND SPECIFIC ROLE [RI Check if proiect performed with current firm <br /> Design and environmental permitting of 225-slip managed mooring field. Conducted hydrographic surveys, jet probes, <br /> and marine resource surveys. Prepared construction plans and specifications and provided construction administration <br /> services including underwater inspection. <br /> (1) TITLE AND LOCATION (Citv and State) 19\ <br /> Ambergris Cay, Turks and Caicos PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Ongoing Ongoing <br />j. (3) BRIEF DESCRIPTION (Brief SCODe, size, cost. etc,) AND SPECIFIC ROLE [RI Check if proiect performed with current firm <br />Prepared Environmental Impact Assessment (EIA) for development of private island. Performed hydrographic and GPS <br /> control surveys. Engineering design of coastal works including entrance channel, dredging, 150-slip marina and RO/RO <br /> platform for shipments to remote island. <br /> (11 TITLE AND LOCATION (Citv and State) 19\ v~^" ~mm' ~T~n <br /> Rybovich Spencer Boatyard, West Palm Beach, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> 2008 2008 <br />k. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc,) AND SPECIFIC ROLE [RI Check if project performed with current firm <br /> Design of dredging and bulkhead for 150-slip marina redevelopment to accommodate vessels up to 250 feet long. <br /> Design of 100,000 cubic yards of dredging and 3,000 feet of bulkhead along with travel lift piers to accommodate 660-ton <br /> lift. Coastal engineering analysis for floating structure design. <br /> (1) TITLE AND LOCATION (City and State) 12\ YEAR COMPLETED <br /> Jensen Beach Managed Mooring Field, Martin County, Florida PROFESSIONAL SERVICES I CONSTRUCTION (/f applicable) <br /> Ongoing Ongoing <br />m. (3) BRIEF DESCRIPTION (Brief SCODe. size. CDSt. etc.) AND SPECIFIC ROLE [RI Check if proiect performed with current firm <br /> Design and environmental permitting of 70-slip managed mooring field. Prepared feasibility study to evaluate waterfront <br /> opportunities for wet slips and managed mooring field configurations. Conducted hydrographic and marine resource <br /> surveys and funding grant administration. <br /> (1) TITLE AND LOCATION (City and State) 12\ YEAR COMPLETED <br /> Sunny Isles Shoreline Stabilization, Sunny Isles Beach, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If app/icable) <br /> 2008 N/A <br /> (3) BRIEF DESCRIPTION (Brief SCDDe. size. CDSt. etc.) AND SPECIFIC ROLE [RI Check if project performed with current firm <br />n. Coastal Systems conducted an assessment of local sediment transport characteristics and the potential for shoreline <br /> stabilization within the City of Sunny Isles Beach. An evaluation of nearshore coastal processes and sediment transport <br /> characteristics in the Project vicinity was completed. Based on the assessment, a long-term beach management plan <br /> was prepared for long-term beach planning. <br /> <br />STANDARD FORM 330 (6/2004) PAGE 2 <br />