Laserfiche WebLink
<br /> <br />SRS Experience <br /> <br /> <br />, <br /> <br /> <br />- --:.f- <br />C:-.'t. <br />/,p ~- <br />../!.#1ii.~, <br />~~....~~ <br /> <br />~:i~:~t~;~~~f::~~' <br /> <br />EXPERIENCE WITH (FOOT) LAP/ARRA PROJECTS <br /> <br />SRS Engineering is a FDOT pre-qualified firm to perform <br />engineering services, We are very familiar with FDOT LAP <br />(ARRA) requirements, SRS has recently completed the design <br />of W. 53rd Street Roadway Improvement Project for the City of <br />Hialeah in accordance with the ARRNLAP guidelines, In addition, SRS is currently providing CEI services for <br />several new LAP/ARRA pro~ects for the City of Hialeah and Coral Gables, These projects include the 1-75 <br />Ramp/NW 138th Street, W, 41 Avenue, and Ponce de Leon Boulevard. <br /> <br />DESIGN EXPERIENCE WITH MARINE STRUCTURES AND BRIDGES <br /> <br />SRS has recently completed work on two bridge projects, Black Creek Bridge and the Access Road and Bike <br />Path Bridge for Chapman Field Park. The Chapman Field Park Bridge consisted of a 21-ft wide bridge over a <br />water crossing for canoes. <br /> <br />In addition, our senior project manager and structural engineer have extensive experience in design of port and <br />marine structures including docks, fender systems, harbor crane supports, wharf extensions, mega cruise ship <br />terminals, Among the projects they worked on include the following: <br /> <br />Berth 24 Extension, Port Everglades, Florida - Design and construction document preparation of 500 feet <br />length of HZ combined wall system to extend the effective length of an existing pier in order to accommodate a <br />new cruise ship. The project included the addition of four 150 ton bollards and fender systems. <br /> <br />Berth 28 and 29, Port Everglades, Florida - Structural analysis for HMK-260E mobile container crane <br />operation, Structural analysis to determine the feasibility of operating mobile harbor cranes HMK-260E at Berths <br />28 and 29, <br /> <br />Disney Cruise Line Resort Island, Bahamas - Part of the team responsible for the structural calculations, <br />construction document preparation and shop drawing review for this project which included a marginal wharf, the <br />creation of an artificial berth island, a protective breakwater, a steel bridge and several fixed timber docks and <br />platforms for recreational activities, <br /> <br />Onyx Seawall Replacement, Miami, Florida - Replacement of more than 200 feet of existing seawall with a <br />new sheetpiling wall for a new high rise building. Responsibilities included design, and construction document <br />preparation, <br /> <br />Cypress Club, Ft Meyers, Florida - Private marina for two high rise residential buildings, with 520 feet of <br />sheetpiling seawall and walkways, including breakwaters and piers to accommodate 70 boats from 30 to 56 feet <br />length. Responsibilities included structural calculation, design, construction document preparation and dredging <br />evaluation. <br /> <br /> <br />Miami Circle Seawall Replacement, Miami, Florida <br />Replacement of more than 540 feet of a partially collapsed seawall <br />with a new sheetpiling wall at Archeological Tequesta Circle in <br />Miami River, Responsibilities included design and construction <br />document preparation. <br /> <br />NW 138th Street Roadway Improvement, Hialeah, Florida - <br />Design of over 700 linear feet of concrete pile and panel canal wall. <br /> <br />