Laserfiche WebLink
<br /> <br />SRS Experience <br /> <br /> <br /> <br />DESIGN EXPERIENCE WITH ROADWAY AND DRAINAGE <br />PROJECTS <br /> <br />SRS has extensive experience in the design and construction <br />management of roadway projects, SRS has designed roadways of several municipalities, Miami-Dade County <br />and many private land development projects, Our most recent relevant project experience encompass several <br />roadway and drainage improvement projects for the City of Hialeah totaling over 26-miles of roadways including <br />E, 9th Avenue, S.E. 7th Avenue, W. 23rd Street and W, 36th Avenue (NW 97th Avenue). Other roadway <br />projects include the design of the Miller Drive (SW 56th Street) widening, the extension of SW 120th Street, the <br />widening of NW 138th Street and adjacent canal, and the entrance to Florida Memorial University. <br /> <br />NW 138th Street, in particular, is currently under construction with a construction cost of over $12,450,000. This <br />roadway project consisted a of 6-lane divided roadway including continuous drainage system and street lighting <br />(1.4 Miles); signalized intersections at NW 97th Avenue, NW 102nd Avenue, and NW 107th Avenue with double <br />left turns and deceleration lanes; new 50' wide drainage canal including culverts and a canal wall along the north <br />side of NW 138th Street between NW 97th Avenue and 1-75. This project also required an extensive permitting <br />including City permits with Hialeah, Hialeah Gardens, Miami-Dade County, DERM, FDOT, SFWMD, COE, and <br />DEP. An Environmental Resources Permit (ERP) was required, cut and fill calculations, and wetland mitigation, <br /> <br /> <br />;:~c:;;t~~f ' <br />~W_J <br /> <br />..... ~ ~#J ... <br />(i, .~ .~, l ,'~j;4.. II <br />,~,-". .~ f'4 -' -~ -. c:.'-..-;II! <br />~ "\oOif.- <br />Ii <br /> <br />1.1(~.-~ <br />~oop <br />~ .~ <br />~ti.::'~-::' <br />,~ <br /> <br />--~ <br />; ..-'!J": <br />~~~~ <br /> <br />(~ i~' ....~ <br />bi".~<~""'''!'''':''''''''i'' <br />1"'\. ,~"",~';':=';';'~". .' <br /> <br />to our municipal roadway design experience, SRS has planned and designed over 550-acres land developments <br />projects within Miami-Dade County which included the design of all roadways and storm water management <br />systems. <br /> <br />Furthermore, an example our ability of manage large and complex project, SRS was the program manager <br />(Master Consultant) for the DERM FEMA/DORM Program, The FEMA/DORM project is a jointly funded effort <br />supported by the Federal Government, State of Florida, and Miami-Dade County intended to mitigate problems <br />that arose as a result of Hurricane Irene (October 1999) and the "No Name Storm" (October 2000), As a Master <br />Consultant we were responsible for the coordination of twelve (12) engineering design consultants and seven (7) <br />land surveying firms involved in the design of approximately four hundred ninety (490) mitigation projects. These <br />projects range from drainage improvements to total roadway <br />reconstruction, canal dredging, culvert cleaning, and canal bank <br />restoration. Additionally, we oversaw the construction efforts of <br />five (5) contractors performing work with an estimated <br />construction value of $35,000,000,00, Finally we were <br />responsible for all document control related to these projects, <br />approval of payment for design, survey, geotechnical reports, and <br />construction in accordance with FEMA required guidelines. <br /> <br /> <br />