Laserfiche WebLink
<br />12, NAME <br /> <br />Francisco Garcia, P.E. <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each kev person.) <br />13, ROLE IN THIS CONTRACT <br />Mechanical & Plumbing Design a TOTAL <br />Engineer 7 <br /> <br />14, YEARS EXPERIENCE <br />I b, WITH CURRENT FIRM <br />< I Year <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br /> <br />Venco Engineering Company / Fort Lauderdale, FL. 33309 <br /> <br />16, EDUCATION (DEGREE AND SPECIALlZA nON) <br />HIGHER POLYTECHNIC INSTITUTE" Jose A. Echeverria" - <br />Havana, Cuba <br />B.S. in Mechanical Engineering, 1982 <br />(from a regionally accredited institution in the Unites States) <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />State of Florida - Professional Engineer No. 64657 <br /> <br />18, OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations, Training, Awards. etc) <br />F.B.C. Workshop - Miami, FL. - 2007 / Florida Building Code (Mechanical) Workshop. <br />F.B.C. Workshop - Miami, FL. - 2007 / Florida Building Code (Plumbing) Workshop. <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Kandahar (Kspan Buildings): MRAP Support Facility, MRAP Fielding Facility, PROFESSIONAL SERVICES I CONSTRUCTION (II applicable) <br /> RCP Maintenance Facility, Striker FRA Facility On-going <br /> (3) BRIEF DESCRIPTION (Briel scope, size, cOSI, elc) AND SPECIFIC ROLE LxJ Check if project performed with current firm <br />a. <br /> Mechanical and Electrical design for four different I-story buildings (kspan type) of 11,840 S.F. each (open bay). Mechanical design <br /> includes HV AC and exhaust fan equipment selection, supply and return duct design (extemal ducts as per client's request), energy <br /> calculations and details. Electrical design includes Power and Lighting layout, fixtures selection, load calculations and panel schedule. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> EUPOL - Kabul: Sports Building PROFESSIONAL SERVICES I CONSTRUCTION (II applicable) <br /> Kabul, Afghanistan 2009 <br /> (3) BRIEF DESCRIPTION (Briel scope, size. cost, etc) AND SPECIFIC ROLE LxJ Check if project performed 'Nith current firm <br />b. <br /> Mechanical, Electrical and Plumbing design for a new 2-story sports building of 4, 740 S.F. The building is made up of2 multi-use <br /> courts, weight lifting room, exercise room, lobby area and restrooms. Mechanical design includes HV AC and exhaust fan equipment <br /> selection, energy calculations and details. Electrical design includes Power and Lighting layout, fixtures selection, load calculations and <br /> panel schedule. Plumbing design includes water (cold and hot) and sewer piping layout, fixtures selection and details. <br /> (1 )TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Eupol - National Load Control Center PROFESSIONAL SERVICES I CONSTRUCTION (II applicable) <br /> Kabul, Afghanistan 2009 <br /> (3) BRIEF DESCRIPTION (Briel scope, size. cost, etc) AND SPECIFIC ROLE lKJ Check if project performed with current firm <br />c. <br /> Electrical design for a I-story building (with a sub floor) of 8,565 S.F. The building is made up of 4 office areas, 2 vestibule rooms, <br /> prayer room, storage room, open room, laboratory room, break room, development room, power supply room, battery room, cable <br /> room, mechanical/electrical room, computers/communication room, operators' room, corridor and restrooms. Electrical design includes <br /> Lighting layout. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Community Blood Centers of South Florida. (South Dade Facility PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Expansion) 2009 <br /> (3) BRIEF DESCRIPTION (Briel scope, size, cost, etc) AND SPECIFIC ROLE U Check if project performed v./ith current firm <br />d. <br /> Mechanical and Plumbing design for an expansion of an existing I-story building in use as a Blood Center. Preparation of MEP plans <br /> to be submitted along with architectural plans. Responsible for HV AC duct design, equipment selection, Mechanical details, <br /> schedules and general notes, energy calculations, Plumbing details, schedules and general notes, water and sewer piping design, and <br /> Computer Aided Design (CADD) drawings. (Size) 10,000 SF, t design <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Islands at Doral PROFESSIONAL SERVICES I CONSTRUCTION (II applicable) <br /> Miami, Florida. USA 2009 <br /> (3) BRIEF DESCRIPTION (Brie/scope, size, cosl, elc) AND SPECIFIC ROLE U Check it project performed with current firm <br />e. <br /> Mechanical and Plumbing design for a 2-story condominium building. Responsible for HV AC duct design, equipment <br /> selection, Mechanical details, schedules and general notes, energy calculations, Plumbing details, schedules and general notes, water <br /> and sewer piping design, and Computer Aided Design (CADD) drawings. <br /> (Size) 4,000 SF. <br /> <br />STANDARD FORM 330 (612004) PAGE 2 <br /> <br />Venco-Imtiaz Construction Company #2 <br />