Laserfiche WebLink
<br />12, NAME <br /> <br />Vicente Franco, P.E. <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />Com fete one Section E for each ke erson. <br />13, ROLE IN THIS CONTRACT <br />Senior Structural Design Engineer a TOTAL <br /> <br />16 <br /> <br />14 YEARS EXPERIENCE <br />b, WITH CURRENT FIRM <br />< I Year <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br /> <br />Venco Engineering Company / Fort Lauderdale, FL. 33309 <br /> <br />16, EDUCATION (DEGREE AND SPECIALllA nON) <br />UNIVERSIDAD NACIONAL - Medellin, Colombia <br />8.S, in Civil Engineering, 1991 <br />UNIVERSIDAD DE LOS ANDES - Bogota, Colombia <br />Master's Degree-Major: Structures, 1999. <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />State of Florida - Professional Engineer No. 62531 <br />Special Inspector No. 7026252 <br /> <br />16, OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations. Training, Awards, etc) <br />FLORIDA INTERNATIONAL UNIVERSITY - Miami, FL. / Concrete, Steel, Timber, and Post-Tensioning concrete Design. <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> MRAP Support Facility, MRAP Fielding Facility, RCP Maintenance Facility, PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Striker FRA Facility 2009 <br /> (3) BRIEF DESCRIPTION (Brief scope, size. cost, etc) AND SPECIFIC ROLE lxJ Check if project performed 'Nith current firm <br />a. <br /> Structural design of four different I-story buildings (K-Span type) of 11,840 S.F. each (open bay). Structural design includes: <br /> Foundations design, UBM 240 steel panel, concrete slabs on grade, wind load analysis, structural details, schedules and general notes. <br /> Preparation of computer generated structural plans to be incorporated into the client's project documents. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Eupol - National Load Control Center PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Kabul, Afghanistan 2009 <br /> (3) BRIEF DESCRIPTION (Briefscope, Size, cost, etc) AND SPECIFIC ROLE LxJ Check if project performed 'Nith current firm <br />b. <br /> Structural design for a I-story building (with a sub floor) of 8,565 S.F. The building is made up of 4 office areas, 2 vestibule rooms, <br /> prayer room, storage room, open room, laboratory room, break room, development room, power supply room, battery room, cable <br /> room, mechanical/electrical room, computers/communication room, operators' room, corridor and restrooms. Preparation of computer <br /> generated structural plans to be incorporated into the client's project documents. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Eupol - Kabul: Sports Building PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Kabul, Afghanistan 2009 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc) AND SPECIFIC ROLE lxJ Check if project performed IMth current firm <br />c. <br /> Structural design for a new 2-story sport building of 4,740 SF. The building is made up of 2 multi-use courts, weight lifting room, <br /> exercise room, lobby area and restrooms. Structural design includes: Foundations design, roof trusses, concrete slabs on grade, second <br /> floor concrete slab, columns, beams, masonry, wind load analysis, structural details, schedules and general notes. Preparation of <br /> computer generated structural plans to be incorporated into the client's project documents. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> OFF Brickell PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Miami, Florida. USA. 2008 <br /> (3) BRIEF DESCRIPTION (Briefscope. Size, cost. etc) AND SPECIFIC ROLE U Check if project performed \Yith current firm <br />d. <br /> Responsible for the Project management and design of (1) 10-story hotel, (I) 10-story office building, and (I) 7-story <br /> parking garage building. Design included foundations, columns, shear walls, beams and post-tensioning concrete slabs. <br /> Perform structural design and wind load analysis for the entire complex. Participated in the coordination of all other <br /> specialty trades. <br /> (1) TITLE AND LOCATION (eityand State) (2) YEAR COMPLETED <br /> 24 Sidonia PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Coral Gables, Florida. USA. 2007 <br /> (3) BRIEF DESCRIPTION (Briefscope. size, cost, etc) AND SPECIFIC ROLE U Check if project performed lMth current firm <br />e. <br /> Project management and design of (I) 5-story building. Design included foundations, columns, shear walls, beams and <br /> post-tensioning concrete slabs. Performed structural design and wind load analysis for the building. Participated in the <br /> coordination meetings with other trades. Developed and coordinated threshold inspections and quality control at job <br /> site at different stages of the construction process. Review and coordinate field changes. <br /> <br />STANDARD FORM 330 (6/2004) PAGE 2 <br /> <br />Venco-Imtiaz Construction Company #2 <br />