My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
VENCO Engineering Co.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-01) Prof. Engineering Svcs.
>
Responses
>
VENCO Engineering Co.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2010 4:33:50 PM
Creation date
11/17/2010 4:33:35 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Engineering Svcs.
Bid No. (xx-xx-xx)
10-04-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />E, RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />Com lete one Section E for each ke erson, <br />12, NAME 13, ROLE IN THIS CONTRACT <br />Agustin Perez-Maldonado, P.E. Civil Engineer a, TOTAL <br /> <br />14 <br /> <br />14, YEARS EXPERIENCE <br />b, WITH CURRENT FIRM <br /> <br />< I Year <br /> <br />15, FIRM NAME AND LOCATION (CIty and State) <br /> <br />Venco Engineering Company / Fort Lauderdale, FL. 33309 <br /> <br />16, EDUCATION (DEGREE AND SPECIALllA nON) <br />University of Florida - B.S. in Civil Engineering, 2000 <br />University of Florida - ME in Engineering Management <br />Architectural Studies, 2004. <br /> <br />17, CURRENT PROFESSIONAl REGISTRATION (STATE AND DISCIPLINE) <br />State of Florida - Professional Engineer No. 63845 <br />Certification - PSMJ Project Management Bootcamp, Advanced <br />Traffic Control <br /> <br />18, OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, AwafCls. etc) <br /> <br /> (1) TITLE AND LOCATION (Cily and State) (2) YEAR COMPLETED <br /> Gainesville Regional Utilities PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Gainesville, Florida 2008 <br /> (3) BRIEF DESCRIPTION (Briel scope, size, cost. etc) AND SPECIFIC ROLE o Check it project performed with current firm <br />a. Project Engineer <br /> Assisted with the Storm Water Management System Design. The requirements for this project were based on the standards for the <br /> City of Gainesville and the Saint John River Water Management District. Tasks included preparing the drainage calculations, <br /> reviewing existing permits, drainage basins and pond design. <br /> (1) TITLE AND LOCATION (Cilyand State) (2) YEAR COMPLETED <br /> Kissimmee Fire Station PROFESSIONAL SERVICES I CONSTRUCTION (II applicable) <br /> Kissimmee, Florida 2008 <br /> (3) BRIEF DESCRIPTION (Briel scope, size, cost. etc.) AND SPECIFIC ROLE U Check ,t project performed with current firm <br />b. <br /> Assisted with the Storm Water Management System Design. The requirements for this project were based on the standards for the <br /> Florida Department of Transportation and the Saint John River Water Management District. Tasks included analyzing the flood <br /> plain for the existing and proposed conditions. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> First Baptist Church of Central Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Orange County, Florida 2007 <br /> (3) BRIEF DESCRIPTION (BrIel scope, size. cost, etc.) AND SPECIFIC ROLE U Check it project performed with current firm <br />c. <br /> Project Engineer- Land Development <br /> Assisted with the drainage design on a commercial site with 48 acres. The requirements for this project are based on the standards <br /> for Orange County and Saint Johns River Management District. Tasks include preparing the drainage calc notebook, reviewing <br /> existing permits, review of existing drainage basins, water mains analysis and design.. <br /> (1) TITLE AND LOCATION (Cily and State) (2) YEAR COMPLETED <br /> Sunshine Rent A Car PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Orange County, Florida 2007 <br /> (3) BRIEF DESCRIPTION (Briel scope, size, cost. etc.) AND SPECIFIC ROLE U Check if project performed with current firm <br />d. <br /> Project Manager & Engineer of Record. - Drainage <br /> The requirements of this project are based on the Orange County & Florida Department of Environmental Protection. Tasks include <br /> waste water lift station design and a four inch force main to be connected to the O.c. Utilities. The design includes a sand trap <br /> structure with approximately 200 I.f. of gravity system to collect the discharge from a proposed car wash area and existing buildings. <br /> (1) TITLE AND LOCATION (Cily and State) (2) YEAR COMPLETED <br /> Patrick Air Force Base PROFESSIONAL SERVICES I CONSTRUCTION (II applicable) <br /> Brevard County Florida 2005 <br /> (3) BRIEF DESCRIPTION (Briel scope, size, cost, etc.) AND SPECIFIC ROLE UCheck if project performed with current firm <br />e. <br /> Project Engineer - Land Development, Water & Waste Water <br /> Responsible for the design and plans production. Senior Engineer responsible for the storm water management system, drainage <br /> system, sanitary gravity system, water main with fire hydrants, sanitary lift station evaluation and paving with grading design. <br /> <br />19, RELEVANT PROJECTS <br /> <br />STANDARD FORM 330 (612004) PAGE 2 <br /> <br />Venco-Imtiaz Construction Company #2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.