My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Civil Works, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-01) Prof. Engineering Svcs.
>
Responses
>
Civil Works, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2010 9:09:42 AM
Creation date
11/17/2010 4:56:46 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Engineering Svcs.
Bid No. (xx-xx-xx)
10-04-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Sunny Isles Beach <br /> <br />Page 7 <br /> <br />Narrative I Approach to a Project. <br />cWI will perform in depth office and field reviews at the inception of each project to become <br />familiar with the project's idiosyncracies and identifY substandard features that may need to be included <br />in the project scope. Once the scope has been approved by the City's Project Manger, a Kick-off meeting <br />will be held to ensure that all team members understand the project's scope, objectives, budget constraints, <br />schedule, project issues, and each individual's responsibilities. <br />This Professional Services Contract may include a variety of projects, each of which will have a <br />unique scope. CWI will evaluate each project request individually and will assign the project team <br />members based on their experience and expertise relative to the project's scope and requirements. This will <br />ensure that the team will have the expertise and man-power needed for each project. <br />CWl's Approach to Technical Issues: CWI is keenly aware of the necessity for maintaining the <br />production budget and schedule. Utility Coordination with FP&L, BellSouth and others can be very <br />challenging at times, therefore, our approach is to obtain the required utility information very early in the <br />process. If needed, we use SUE ("Soft-dig") to locate utilities identified to be in conflict with the design <br />and for all structural foundations. All project designs will meet the applicable City, County and State <br />standards and criteria. Special attention will be given to roadside safety and ADA compliance. QAlQC <br />reviews will be performed on all contract documents before submittal to the City. <br />CWI has provided safety improvements for many roadways. Each location has particular <br />conditions requiring individual design attention to meet current safety standards. Our staff is trained in <br />Traffic Control Design and will provide careful planning and coordination to provide safety for the public. <br />CWl's Approach to Managerial Issues: CWI has provided effective project management for <br />numerous projects with varied Stakeholders on many projects. CWI recently coordinated the FDOT, NE <br />2 Avenue project at the Performing Arts Center (PAC) as part of the 1-395 improvements in the City of <br />Miami. We handled the managerial challenges with special meetings, e-mails, site visits and personal <br />attention to the different designers and agencies in order to produce a complete and rewarding project. <br />To meet the project goals, CWI uses a Team Approach with a single-point of contact. We believe <br />in early coordination of resources and scheduled team meetings to review the project schedule and <br />workload. These team meeting include both CWl's staff and our proven Sub-consultants. Our team will <br />function as an extension of the City's office to provide solutions for tasks assigned. <br />Civil Works' Design Philosophy includes the efficient design of projects for the safety and <br />betterment of the public. Our design philosophy includes the careful analysis of the project's objectives <br />to provide an aesthetically pleasing, functional and cost effective design. CWI also employs the "KISS <br />principle" ("Keep It Short & Simple"). When dealing with an engineering problem, there is always a <br />tendency to complicate the solution far more than the problem requires. This "KISS" concept strives to <br />eliminate unnecessary complications. <br />The steps for a Typical Project under this contract might include: <br />Issuance of the LOA and Kick Off Meeting. The CWI Project Manager, Linda Bell, P .E., will <br />assign the staff; establish the schedule; and implement the QA/QC plan. <br />Document Acquisition and Review: CWI will collect and review all available documents. <br />Field Inspection of Existing Conditions: cWI will visit the project, visually review the existing <br />conditions and photograph the items or issues of concern. <br />Pre-design Permitting Requirements: Civil Works will coordinate our plans with the City and <br />the permitting agencies. This avoids surprises at the end of the of the project. <br />Plans Preparation: The Final Plans Package will be in conformance with the latest Standards. <br />These projects will be prepared in AutoCAD or Microstation. All contract documents will be checked prior <br />to each phase submittal as part of CWl's Quality Assurance/Quality Control program. <br />Permitting and Construction Administration will be provided as needed. <br />Sunny-Appro-Narr.wpd <br /> <br />Civil Works, Inc. 7855 NW 12 Street, Suite 218 Doral, FL 33126 Ph: 305-448-5955 Fax: 305-591-4074 <br />
The URL can be used to link to this page
Your browser does not support the video tag.