Laserfiche WebLink
<br />C W I A WBBDSE fi~ <br /> <br />LINDA M. BELL, P.E. <br /> <br /> <br />YEARS OF EXPERIENCE: <br />27 years <br /> <br />PROFESSIONAL <br />AFFILIA TIONS: <br /> <br />Florida Engineering Society - <br />1997 Outstanding Service <br />to the Engineering Profession, <br />Miami Chapter <br />1998 Fellow of the <br />Florida Engineering Society <br />1997 Engineer of the Year <br />American Society of Civil Engineers <br />American Public Works Association <br /> <br />REGISTRATION: <br />Florida P.E. No. 38542 (1987) <br />Advanced Work Zone Traffic Control <br />Certified <br /> <br />EDUCATION: <br />B.S. Civil Engineering <br />University of Miami (1981) <br />A.A., Architecture <br />Miami Dade College (1974) <br /> <br /> <br />Grand A venue <br />S treetscape <br /> <br />Page 8 <br />Civil Works, Inc. <br />Miami - Ft. Lauderdale - Orlando <br />305-448-5955 954-344-6568 407-339-0040 <br />www.civilworks.comcwi@civilworks.com <br /> <br />GENERAL CIVIL DESIGN <br /> <br />EXPERIENCE: <br />Ms. Linda Bell has many years of civil engineering experience in the <br />planning, design and construction of engineering projects. Ms Bell is <br />President and majority owner of Civil Works, Inc. Her responsibilities as <br />Project Manager includes management of projects; supervision of <br />engineering staff; coordination with subconsultants and clients; planning, <br />design, bidding services and overseeing construction inspection and <br />administration services. Some of Ms. Bell's design experience includes the <br />following projects: <br /> <br />SR AlA / Harding Avenue from Bal Harbor Shop Entrance to 94 <br />Street, FDOT District VI- Project Manager for this undivided 3-lane <br />section with sidewalks and parallel parking along both side ofthe project. <br />Elements of work included roadways, structures, minor bridge design, <br />intersections, interchanges, geotechnical activities, surveys, drainage, <br />signing and pavement markings, signalization, lighting, utility relocations, <br />landscaping, right-of-way maps and legal descriptions, traffic control plans, <br />cost estimates, environmental permit sketches, environmental mitigation <br />plans, quantity computation booklets, and all necessary incidental items for <br />a complete project design. Client: FOOT, District VI, Ana Arvelo, P.E., <br />305-470-5210. Completed 2010. <br />Village of Palmetto Bay- Project Manager responsible for a Road <br />Resurfacing Work Program and Sidewalk Inventory Study. A field <br />inventory of the pavement condition was conducted and an analysis matrix <br />for pavement overlay was provided. The roads were prioritized for asphalt <br />overlay including a 7-year work program. For efficiency, the sidewalk <br />inventory was conducted simultaneous to the pavement inventory. The <br />sidewalk locations and the identification of any "gaps" were catalogued. <br />Both the pavement and sidewalk inventory were inserted into a G IS Village <br />plan identifying the pavement and sidewalk prioritization in various colors. <br />Client: Village of Palmetto Bay, Corrice Patterson, Palmetto Bay, FL, 305- <br />259-1236. Completed 2006. <br />Village of Palmetto Bay- This project included improvements for <br />three drainage areas including the residential streets of SW 77th A venue, <br />SW 75th Avenue and SW 86th Avenue. CWI researched the existing <br />drainage catch basins and site conditions within the specified areas. A <br />drainage system was designed, and drainage calculations were prepared in <br />accordance with Village of Palmetto Bay and Miami-Dade County <br />standards. Drainage permits were obtained from DERM for this project. <br />An existing South Florida Water Management District Canal outfall was <br />used as an emergency overflow in one basin. Client: Village of Palmetto <br />Bay, Ron Williams, Palmetto Bay, FL, 305-259-1236. Completed 2006. <br />Grand Avenue Streetscape - CWI provided the Master Planning and <br />Highway Design for the reconstruction of approx. 3,200 LF of roadway <br />from a 5-lane undivided to a 2-lane divided roadway with parallel parking, <br />traffic calming, drainage, signalization, decorative street lighting, wider <br />brick sidewalks, landscaping, and sidewalk furniture. <br />Client: MDPW, Lana Morrey, III NW I Street. 305-375-2863. Completed <br />2005. <br />SR 826 (Sunny Isles Boulevard) from SR 5 (US I) to NE 35th <br />Avenue (Oleta River State Park) - This 3R project included signal <br />modifications, a Bike Lane Addition, ADA ramps and Signing and <br />Marking. Client: FOOT, Jose Barrera, P.E. 1000 NW 111 St, Miami, FL, <br />South Florida Water Management District - General Engineering <br />Consultant - This 4-year General Consultant Contract included <br />engineering services for projects in II counties, general civil, <br />environmental, canal bank stabilization, Master Planning, structural and <br />various other services. <br /> <br />7855 NW 12 Street, Suite 218, Doral, FL 33126 <br /> <br />LBGENCIV-I PG JO.wpd <br />