Laserfiche WebLink
<br />~ CITY OF SUNNY ISLES BEACH g~;co <br /> <br />Request for Qualifications No. 10-04-01 · Professional Engineering Services <br /> <br />· eonstruction Management <br />· Construction Inspection <br />· Hurricane Recovery and debris monitoring services <br />· General Design Work (Civil) <br />· Preparation of complete Construction Contract Plans and Special Provisions for the assigned Project <br />· Post Design Services (Shop Drawing Review and Responses to Request for Information) <br />· Bid Administration (Selection and Letting) <br />In addition to these initial services identified, our firm can provide the following services which we feel are beneficial <br />and unique to the City: <br />· Grant Development and Administration <br />· Transit Studies <br />· Intergovernmental Coordination (FOOT, MDC, etc.) <br />· In-House Staff Support <br />· eoncurrency Review <br />The City is unique, as it consists of ten small islands that are divided by canals or highways which all eventually lead <br />to Collins Avenue in one form or another. Therefore, from a transportation perspective if traveling by car, bus, bike <br />or walking there is likely some interaction with a state road facility. As mentioned earlier our firm is capable of <br />providing all of the services mentioned above, but the greatest strength of our firm is our ability to handle projects <br />that are on or interact with facilities such as Collins Avenue. We understand the issues the City faces on Collins <br />Avenue with major resorts and high rise residentials on the east side of the highway and major commercial areas <br />along the west. Mobility, Aesthetic and Safety are of primary concern along this highway and a primary area were <br />we can assist the City in developing a coordinated plan with FOOT for this corridor. We mention this as one of the <br />primary areas we have identified were we can be of tremendous value to the City. <br /> <br />Plannina and Preliminarv Enaineerina <br /> <br />Our staff of engineers has the depth of resources to handle any assignment the City requires. Bee specializes in <br />providing engineering analysis, preliminary plans and traffic engineering services to handle all engineering <br />components of a project or support on specific components on other studies. If its traffic engineering we have the <br />tools available, from a simple Highway Capacity Software analysis to a more complex CORSIM model. Our <br />engineering effort always includes an extensive analysis of all possible options with the capabilities of providing 30% <br />plans, engineering reports and preliminary structural, utility and drainage design. <br /> <br />Final Desian <br /> <br />In the development of final design plans for a roadway, a minor improvement or a site, our responsibility will be to <br />analyze and evaluate design criteria, geometrics, drainage, maintenance of traffic, constructability, biddability, <br />sequence of construction, aesthetics, utilities, environmental impacts, traffic analysis, signalization, and signage. <br />Our plans will be prepared utilizing the latest version of AutoCAD. We will propose several phase reviews to the City <br />during the course of plans development in order to give the City and our Team reassurance that we are meeting the <br />intent of the design. There are many components that are included in a set of final design plans, but we feel that <br />some of the most important issues that can affect cost and the public are described in further detail below. <br /> <br />Utilitv Coordination <br /> <br />Early coordination with the utilities and accurate information regarding their facilities can help eliminate conflicts <br />during construction. Information requested from the utilities will include: 1) location of their existing/proposed <br />facilities, 2) depth and cover of buried facilities, 3) whether or not buried facilities are encased, 4) is the utility <br />located in an easement, and 5) whether or not the utility will seek to be reimbursed for relocation. A utility pre- <br />design meeting will be held and conflicts between the proposed improvements and the utilities will be coordinated <br />and resolved. Final relocation schedules will be submitted to the utilities at the final plans development. Final <br />certification will include submitting utility clearance letters with the final package. <br /> <br />2lPage <br />