Laserfiche WebLink
<br />.Ltt-s CITY OF SUNNY ISLES BEACH W1..", <br /> <br />Construction Contract <br /> <br />A project's close-out phase is often overlooked in the execution of the project. Project teams usually move on to the <br />next engagement, and the City is left with completing the final deliverables and financial obligations. In some cases, <br />the project close-out can have serious financial considerations related to issues of contract and schedule closeout. <br />When a project is approximately 90% complete, BCC's Engineers will contact the Contractor as well as the City's <br />Maintenance Staff to schedule a Preliminary Field Inspection. Although this inspection may not be a requirement of <br />the contract documents it is suggested in the spirit of cooperation with the contractor to insure a timelier and <br />problem free final inspection. The purpose of the inspection will be to review the project and determine if the <br />project is sufficiently complete to warrant a final inspection. Bee will schedule a Final Inspection within 7 days of the <br />Contractor notifying the City that the project is presumptively complete. During this inspection a punch list will be <br />prepared for any work found unsatisfactory in whole or in part. A copy of the punch list will be provided to the <br />Contractor with the indication that the work so noted must be completed before the job will be accepted. The <br />eontractor will also be notified that the punch list should not be construed as a "final list". <br />Once all punch list items are completed, a Final Inspection will be scheduled. Contract closeout will also include <br />reconciliation of any outstanding unpaid estimates, review of the required contract documents, and submittal of the <br />appropriate records including "As-Built" Plans to the City for records retention. <br /> <br />Project Team and Staff <br /> <br />Throughout the years Bee has forged an outstanding reputation for providing quality services that meet client needs <br />and exceed expectations. Our firm has the ability and the technical resources to provide the majority of the services <br />requested in the City's RFQ. The firm principals and staff have the depth of knowledge and experience the City is <br />looking for in its consultant. Bce has a total of 69 employees that are trained to provide sound engineering solutions <br />in a professional and cost-effective manner. <br /> <br />Proiect Staffina <br /> <br />General Engineering Services Agreements require a Project Manager (PM) with proven design experience that will <br />manage each individual assignment, deliver them on schedule, and is familiar with local Standards, Specifications <br />and Procedures. BCe's Project Manager will be Mr. Shahin Hekmat, PE, his experience, as well as the experience of <br />the key members of our Team, similar projects and client reference information is documented in the attached <br />Standard Forms 330. <br />In assembling the staff, we not only looked at the special technical capabilities of each individual, but also their <br />current and projected workload and availability. The staff being proposed to the City will be committed to for the <br />duration of the contract. Bee Team member's current workload ensures that we can easily provide the staff-hours <br />required to service this contract. <br /> <br />Praiect Manaqer <br /> <br />Shahin Hekmat, PE will be the overall project manager and the point of contact with the City of Sunny Isles Beach. <br />Mr. Hekmat had been involved in many projects with the City in the past and was part of the team that prepared the <br />City's Capital Improvement Plan (CIP) and the associated budget in 2007. He is a seasoned Senior Civil Engineer with <br />expertise in storm water management, drainage and roadway design, land development projects; including design <br />of water distribution systems, sanitary sewer collection and disposal systems, paving, grading, drainage and flood <br />routing analysis, permitting, construction oversight, and project close-out. <br />Mr. Hekmat's career has been focused on the design of public infrastructure projects for municipalities, counties and <br />state agencies, in South Florida. He has a reputation for getting things done professionally and efficiently. He Served <br />as City Engineer for City of Weston; Consulting Engineer for the Cities of Sunny Isles Beach and North Lauderdale; <br />and District Consultant for South Broward Drainage District, Indian Trace Development District, Bonaventure <br />Development District and North Lauderdale Water Control District. This combination of energy and experience is <br />what Mr. Hekmat will bring to each and every assignment the City of Sunny Isles Beach tasks us with under this <br />contract with the help of our Team as identified in the Organizational Chart. <br /> <br />5lpage <br />