My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BCC Engineering
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-01) Prof. Engineering Svcs.
>
Responses
>
BCC Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2010 9:19:36 AM
Creation date
11/18/2010 9:19:18 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Engineering Svcs.
Bid No. (xx-xx-xx)
10-04-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Lrr CITY OF SUNNY ISLES BEACH ;~,,,g <br /> <br />Request for Qualifications No. 10-04-01 · Professional Engineering Services <br /> <br />Experience with Reaulatorv Aaencies <br /> <br />Most public sector projects require coordination across several jurisdictions. Our Team anticipates that assignments <br />from this contract will require coordination and/or permitting through the following agencies: <br />. Miami-Dade Department of Environmental Resources Management, DERM - Regulation of surface waters, <br />wetland impacts, discharges to DERM canals, contamination Issues, etc. <br />. South Florida Water Management District, SFWMD - Regulation of surface waters, wetland impacts, <br />discharges to SFWMD canals, dewatering during construction, etc. <br />. United States Army eorps of Engineers, USAeOE - Regulation of wetland impacts, dredging activities, filling <br />of surface waters, etc. <br />· Florida Fish and Wildlife, Fwe - Fish and wildlife resources management. <br />. US eoast Guard, UseG - Regulation of projects affecting navigable waterways as well as coastal <br />construction. <br />. Florida Department of Environmental Protection, FDEP - Control of pollutant discharges into water bodies, <br />particularly stormwater pollution prevention during construction activities, regulation of stormwater <br />injection wells, etc. <br />. The Florida Department of Transportation, FOOT - Regulation of all work that intercepts or impacts a state <br />road, i.e. US-1. <br />. eity of North Miami Beach and Miami-Dade Water and Sewer Department (WASD) - Regulation of <br />modifications or installation of water main, sewer collection system, lift station and force main. <br />Our Team is well versed in the permitting process associated with all these agencies. We have permitted projects <br />through them, or have done work under contract directly with these agencies. One of the most critical aspects of <br />any project is to establish permitting jurisdiction as early as possible and hold pre-application meetings with those <br />agencies. Because all projects have their intricacies, these meetings are critical in order to determine what the <br />agency permitting requirements and applicable criteria will be for that specific project; this assures that the project <br />is on the right path and eliminates costly delays associated with rejected applications. <br /> <br />Manaaina the Permittina Process <br /> <br />Many of the assignments in this contract will require several permits in accordance with the requirements of the <br />agencies with jurisdiction in the area where improvements are being performed. Members of Bee's staff have <br />demonstrated during the last five years, our capability of obtaining permits for this type of project, one example is a <br />recently completed project. This project was the Miscellaneous Sanitary Sewer Improvements for MD Parks and <br />Recreation Department: coordination and approval included MDWASD, MD Public Works, DERM, FOEP, FPL, NUl City <br />Gas and Miami-Dade County Building & Zoning. <br /> <br />Manaaina Contractors Submittals and RFl's <br /> <br />Construction administration procedures are office administration activities related to the project construction. A <br />representative of Bee will be available for all construction related matters, and this person will have the authority to <br />make decisions on behalf of the design team. The following is a list of the administrative procedures performed, <br />followed by a short description of the task. <br />. Pre-eonstruction Conferences, when an initial Notice to Proceed is issued. This allows the contractor a set <br />period of time, usually 30 days, to finalize the construction schedule and obtain all permits. A final Notice to <br />Proceed is issued once the permits and schedule are ready and approved by the agencies. <br />· Weekly Meetings are set up to review the status of construction progress, submit shop drawings, clarify <br />documents and discuss construction issues. <br />· The following support documents are sent to the City's Project Manager who may consult with Bee before <br />responding to the request. All transactions are logged. Documents processed will include: RFI's, Change <br />Orders, Request for Proposal's and Field Orders. <br /> <br />41page <br />
The URL can be used to link to this page
Your browser does not support the video tag.