|
<br />e
<br />
<br />-'
<br /><(
<br />'f)
<br />a
<br />0.
<br />a
<br />a::
<br />0.
<br />'f)
<br />I
<br />>-
<br />u.
<br />a
<br />w
<br />'"
<br /><(
<br />0.
<br />"j
<br />>-
<br />>=
<br />W
<br />I
<br />>-
<br />Z
<br />a
<br />z
<br />a
<br />>=
<br />u
<br />ii'
<br />>-
<br />'f)
<br />w
<br />a::
<br />w
<br />I
<br />f-
<br />a
<br />>-
<br />
<br />ei
<br />
<br />'f)
<br />~
<br />>-
<br />w
<br />W
<br />I
<br />'f)
<br />'f)
<br />I
<br />>-
<br />z
<br />a
<br />o
<br />w
<br />z
<br /><i'
<br />>-
<br />z
<br />a
<br />u
<br /><(
<br />f-
<br /><(
<br />o
<br />u.
<br />a
<br />w
<br />a::
<br />:::>
<br />'f)
<br />'3
<br />u
<br />'f)
<br />o
<br />a::
<br />a
<br />w
<br />'f)
<br />:::>
<br />
<br />e
<br />
<br />SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
<br />
<br />Mr. Michopoulos has been assigned as a Lead Electrical
<br />Engineer in the chillcd water plant upgradc for the U.S.
<br />Department of State at the Consulate Office Building in
<br />Brazil. He performcd a sitc sllLTey and prepared
<br />specifications and dra\vings to support thc upgrade.
<br />
<br />t-.lr. t-.lichopoulos co-de\"eloped infrastructure cluality
<br />review criteria and rcview plans for use to assess AC,
<br />DC, standby power, and security systcms reliability for a
<br />major telecommunications company. He has performed
<br />re\"iews of critical ccntral office network buildings and
<br />has identified areas requiring impro\"ement to enhance
<br />reliability. Also, has performed reliability assessments of
<br />major data processing centcrs.
<br />
<br />As Assistant Project t-.lanager, responsible for
<br />coordinating preparation of design documents
<br />(drawings, specifications, reports, ctc) for the Aberdecn
<br />Chemical :\gent Disposal Facility.
<br />
<br />He was also assigncd as Lcad Sccurity Engincer on a
<br />security survey \'alidation and upgrade for :\nchoragc
<br />t-.lunicipal Light and Power.
<br />
<br />He has preparcd descriptions of task and electrical scopc
<br />estimates for a \"aricty of industrial, commercial, pulp
<br />and papcr, and utility projects.
<br />
<br />t-.lr. t-.lichopoulos \vas \vith Chas. T. t-.lain, lne. from
<br />1974 until 1981. He was assigned as a lcad electrical
<br />engineer ill\"oked in all phascs of cngineering through
<br />construction of industrial, pulp and papcr, and
<br />commercial projects including system studies and dcsign,
<br />equipment specification and procurement, capital cost
<br />estimation, and manpowcr projection and selcction.
<br />
<br />Relevant Experience
<br />1981 - Present, Shaw Environmental &
<br />Infrastructure, Inc.
<br />/\s Deputy Project t-.lanager on a major transit project
<br />that will provide underground and surface trackless
<br />trolley service from downtown Boston to the South
<br />Boston Piers area, he directed construction phasc
<br />services for the systemwide elements (signals,
<br />communications, traction power, catenary, tunnel
<br />lighting, and emergency tunnel ventilation.
<br />
<br />Tren Urbano, Section 1, Interface Design
<br />Coordinator, Public Transit System OAN 1998 to
<br />
<br />I SHAW ENVIRONMENTAL, INC.
<br />
<br />06C122006T
<br />
<br />OCTOBER 2004). As Design lntcrface Coordinator,
<br />rcsponsible for coordinating all design acti\"ity between
<br />the Alignment Section 1 contractor and the Systems
<br />contractor of the Trcn Urbano Public Transit S\'stem in
<br />San .J uan, Puerto Rico.
<br />
<br />Tren Urbano, Section 4, 5, 6, Corrosion Control,
<br />Public Transit System (MAY 1998 to OCTOBER
<br />2004). ,\s Support Engineer, responsible for corrosion
<br />control dcsign support acti\"ity for the Alignment
<br />Sections 4,5,6 contractor of the Tren Urbano Public
<br />Transit System in San Juan, Pucrto Rico.
<br />
<br />Tren Urbano, Alignment Section 1, Design, Public
<br />Transit System (Nov 1996 to OCTOBER 2004). As
<br />Lcad Electrical Engincer, responsiblc for elcctrical
<br />design drawings, calculations, and specifications for
<br />Alignment Scction I of thc Trcn Urbano Public Transit
<br />Sys tem in San.J uan, Puerto Rico.
<br />
<br />U.S. Army Program Manager for Chemical
<br />Demilitarization (Apr 1996 to May 1998). As
<br />Assistant Project Manager, rcsponsible for coordinating
<br />preparation of design documents (drawings,
<br />spccifications, reports, ete.) for the Aberdeen Chemical
<br />,\gcnt Disposal Facilit:y.
<br />
<br />Security Study (Nov 1996 to Jan 1997). 1\S Project
<br />t-.lanager, responsiblc for SutTey, intetTie\v, report and
<br />sccurity protcction recommendation guidelincs of the
<br />Nctwork Operation Center for a Fortune SO
<br />Telecommunications Company.
<br />
<br />Data Center Reliability Study (Feb 1995 to June
<br />1995). l\S Senior Consultant, responsible for sllLTey and
<br />infrastructure reliability study for t\vo AT&T Data
<br />Centers.
<br />
<br />Security Planning (Feb 1994 to June 1995). As
<br />Project t-.lanager, developed a national program of
<br />facility security guidelines for a Fortune SO
<br />Telecommunications Company.
<br />
<br />Infrastructure Quality Review Ouly 1992 to Jan
<br />1994). :\s Security Specialist, responsible for facility
<br />security revicws and recommendations for a Fortunc SO
<br />Telecommunications Company.
<br />
<br />Security Access Control System Oan 1989 to Dee
<br />1992), Logan International Airport. As Project
<br />
<br />JOHN MICHOPOULOS 0
<br />
|