<br />.
<br />
<br />-'
<br /><(
<br />(/)
<br />o
<br />a.
<br />o
<br />'"
<br />a.
<br />(/)
<br />I
<br />>-
<br />u.
<br />o
<br />w
<br />'"
<br /><(
<br />a.
<br />~
<br />>-
<br />;::
<br />W
<br />I
<br />>-
<br />Z
<br />o
<br />Z
<br />o
<br />;::
<br />'-'
<br />ii'
<br />>-
<br />(/)
<br />W
<br />'"
<br />W
<br />I
<br />>-
<br />o
<br />>-
<br />.~
<br />(/)
<br />~
<br />>-
<br />W
<br />W
<br />I
<br />(/)
<br />(/)
<br />I
<br />>-
<br />z
<br />o
<br />o
<br />w
<br />Z
<br />:;;:
<br />>-
<br />z
<br />o
<br />'-'
<br /><(
<br />>-
<br /><(
<br />o
<br />u.
<br />o
<br />w
<br />'"
<br />=>
<br />(/)
<br />g
<br />'-'
<br />(/)
<br />is
<br />'"
<br />o
<br />w
<br />(/)
<br />=>
<br />
<br />.
<br />
<br />SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
<br />
<br />i\lanager/Engineer, responsible for slllTey, report, and
<br />recommendations to Massport for the design,
<br />implementation, and procurement specifications for a
<br />fedcrally mandated security access control systcm.
<br />
<br />Personal Rapid Transit System (Mar 1991 to Oct
<br />1991), Regional Transit Authority. As Lead Security
<br />Engineer, responsible for the security element of the
<br />System Design and Safety, Security, and Failure
<br />i\lanagement Report for the development of a Personal
<br />Rapid Transit System in conjunction with Taxi 2000
<br />Corp. for the Regional Transit ,\uthority in Chicago.
<br />
<br />Value Engineering Study (May 1992), Deer Island
<br />Facility Information System (FIS). As a Value
<br />Engineering Team i\Iember, responsible to perform a
<br />Valuc Engineering study and preparc a report of the
<br />Facility Information Systcm for the i\Iass \'(!atcr
<br />Resources Authority's Deer Island Trcatment Plant.
<br />
<br />Security Access Control System Oune 1990 to June
<br />1991), Robert Mueller Municipal Airport. As Project
<br />Engineer, responsible for survey, report and
<br />recommendations to the City of ,\ustin for the design,
<br />implemcntation, and procurcment specifications for a
<br />CCTV and access control s\'stem.
<br />
<br />Security Survey/Report (Aug 1988 to Dee 1988),
<br />Anchorage Municipal Light & Power. As Lcad
<br />Security Engineer, responsiblc for report of cxisting
<br />conditions and recommcndations for security
<br />imprm'ements at three facilities.
<br />
<br />Security Upgrade (Aug 1987 to July 1988), Los
<br />Angeles Department of Water & Power. As Lead
<br />Electrical/Security Engineer, rcsponsiblc for sitc SlllTCY,
<br />report recommendation for equipmcnt specification and
<br />security system design for high voltage receiving Station
<br />B in South Los Angeles.
<br />
<br />Chilled Water Plant Upgrade Oan 1988),
<br />Department of State, U.S. Consulate. ,\s Lead
<br />Electrical Engineer, responsible for
<br />specifications/ application of electrical equipment in
<br />support of a chillcd watcr plant upgrade for a U.S.
<br />Consulate in Brazil.
<br />
<br />Security Upgrade (May 1988 to July 1988), United
<br />States Information Agency. As Lead
<br />
<br />SHAW ENVIRONMENTAL. INC.
<br />
<br />06C122006T
<br />
<br />Electrical/Security Engineer, responsible for plans of
<br />security eCluipment for a USIS facility in Korea.
<br />
<br />Security Upgrade (Apr 1986 to Jan 1987),
<br />Department of State, U.S. Embassy. "\s Lead
<br />Electrical/Security Engineer, responsible for
<br />spccification/ application of security equipment
<br />(microwave, CCTV, passive infrared, ultrasonic motion
<br />detection, ete.) for four U.S. embassies abroad.
<br />
<br />Security System (Sept 1986 to Aug 1987), American
<br />Brands, Inc. As Support Engineer, responsible for
<br />technical support to the project (feeder sizing, U.L.
<br />listing requiremcnt study) for security equipment on a
<br />corporate headquarters in Old Greenwich, Connecticut.
<br />,\lso responsible for tracking all time charges and
<br />de\'eloping all scope changes through completion of the
<br />project.
<br />
<br />Fossil Plant Life Extension Study (Apr 1986 to Aug
<br />1986) Consolidated Edison Company of New York,
<br />Inc. As Support Engineer, responsible for the re\.ie\v
<br />and preparation of electrical eCluipment inspection
<br />packages for the purpose of plant operating life
<br />extensIon.
<br />
<br />Malakoff Electric Generating Station - Units 1 and 2
<br />(Feb 1982 to Apr 1986), Houston Lighting & Power
<br />Company. As Work Package Engineer, responsible for
<br />the preparation of essential sen'ice-emergency diesel
<br />systcm description and spccification of unit substations,
<br />emcrgency diesel generator, cable trays, dry typc
<br />transformers, panelboards, unintermptible power supply
<br />(UPS), communication systcm, and interface with the
<br />furnish and crcct precipitator, flue gas desulfurization
<br />(FC D) scrubbcr, FG D wastc, lignite and limestonc
<br />handling, bottom ash and fly ash contractors for thc
<br />l'.vo-unit, 690 M\,(! lignite-fired plant in Henderson
<br />County, Texas.
<br />
<br />Sludge Dewatering Project (Nov 1984 to Jan 1985),
<br />Statler Tissue. As Lead Electrical Engineer,
<br />responsible for specification of cable, motor insert for
<br />dri\'cn equipment, lighting panels and transformers and
<br />general contractor installation specification for addition
<br />of a sludge press for a tissue plant in Augusta, Mainc.