|
<br />.
<br />
<br />-'
<br /><{
<br />If)
<br />o
<br />"'-
<br />o
<br />0:
<br />"'-
<br />If)
<br />I
<br />f-
<br />"'-
<br />o
<br />UJ
<br />Cl
<br /><{
<br />"'-
<br />~
<br />f-
<br />>=
<br />UJ
<br />I
<br />f-
<br />Z
<br />o
<br />Z
<br />o
<br />>=
<br />u
<br />a::
<br />f-
<br />If)
<br />UJ
<br />""
<br />UJ
<br />I
<br />f-
<br />o
<br />f-
<br />
<br />.i
<br />If)
<br />'!l
<br />f-
<br />UJ
<br />UJ
<br />I
<br />If)
<br />If)
<br />I
<br />f-
<br />Z
<br />o
<br />o
<br />UJ
<br />z
<br />4'
<br />f-
<br />Z
<br />o
<br />u
<br /><{
<br />f-
<br /><{
<br />o
<br />"'-
<br />o
<br />UJ
<br />""
<br />::::>
<br />If)
<br />g
<br />u
<br />If)
<br />Ci
<br />""
<br />o
<br />UJ
<br />If)
<br />::::>
<br />
<br />.
<br />
<br />SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
<br />
<br />Hydraulic & hydrological reports ha\'e been accepted by
<br />Georgia DOT for construction permit.
<br />
<br />Lead Hydraulic Engineer, Air Force Bases (AFB)
<br />Housing Privatization Projects, US Army, N.E.,
<br />Hanscom AFB, MA, 09/2003 - 04/2006. The
<br />projects, included de\'elopment and renO\'ation of
<br />existing numbers of AFB housing pri\'atization and its
<br />
<br />. .
<br />maintenance serVIces.
<br />
<br />Directed the preliminary stormwater collection and
<br />drainage system to support the development of AFB
<br />I-lousing Pri\'atization projects for Hanscom, t\11\.
<br />
<br />Accomplishments:
<br />Stomwater discharge permit is obtained and project is
<br />under construction.
<br />
<br />Lead Hydraulic Engineer, Wilson Hill Wildlife
<br />Management Area Improvements (WHWMA),
<br />10951, New York Power Authority (NYPA), St.
<br />Lawrence-FDR Power Project, Massena, N.Y.,
<br />08/2004 - 12/2004. The project, located at the south
<br />shore of St. La\vTence Ri\'er near Massena, N.Y.,
<br />included the de\'c1opment of the design criteria and
<br />engineering planning for the construction of pool water
<br />le\'el control structures, dike rehabilitation, New Road
<br />Dike construction, and siphon outlet for \'\'ilson Hill
<br />Wildlife t\lanagement Area, NYPA
<br />
<br />Directed the design de\'Clopment of the construction of
<br />pool water level control structures, dike rip rap
<br />protection, siphon outlet for lowering pool water level,
<br />and dike seepage for \'\'ilson Hill \\!ildlife t\Ianagemcnt.
<br />
<br />Lead Hydraulic Engineer, Steward Avenue Para-
<br />Transit facility Modifications, Long Island Bus,
<br />Nassau County, NY, 03/2004 - 11/2004. The project
<br />improved and modified the existing Steward Avenue
<br />Para-Transit stormwater drainage system and facilities
<br />for use of Long Island Bus terminal.
<br />
<br />De\'eloped a drywell drainage system for the site and
<br />submitted for drainage recluirement approval from
<br />Nassau County Department of Public Works (DP\'\0.
<br />The storm drainage system was approved by DPW on
<br />October 4, 2004.
<br />
<br />Accomplishments:
<br />
<br />SHAW ENVIRONMENTAL, INC.
<br />
<br />06C122006T
<br />
<br />The design of stormwater drainage system and analysis
<br />arc completed.
<br />
<br />Lead Hydraulic Engineer, MOX Fuel Fabrication
<br />Facility (MFFF), US Department of Energy,
<br />Chicago Operation Service, Savannah River Site,
<br />SC, 09/2004 - 09/2004. The project developed the
<br />Mixed Oxide (MOX) Fuel Fabrication Facility (~IFFF)
<br />to produce completed MOX fuel assemblies for use in
<br />domestic, commercial nuclear power reactors.
<br />
<br />Reviewed stormwater drainage system computed using
<br />I-Iydratlow by Intelisoh-e for MOX Fuel Fabrication
<br />Facility Site in South Carolina.
<br />
<br />Lead Hydraulic Engineer, IROQUOIS Gas
<br />Transmission System, IROQUOIS, Bronx, NY,
<br />08/2002 - 07/2004. The project designed and
<br />constructed the compression station for gas transmission
<br />system in Bronx, New York.
<br />
<br />Pro\'ided storm runoff analyses of a subsurface drainage
<br />perforated piping system, for Hunts Point Compression
<br />Station, Bronx, New-York permit application.
<br />Percolation rates and groundwater ele\'ations on site
<br />were e\'aluated. Storage \'olume within dry soils was
<br />considered to retain the excessi\'e peak tlood resulted
<br />from a server storm.
<br />
<br />Lead Hydraulic Engineer, Formerly Used Sites
<br />Remedial Action Program (FUSRAP), Maywood
<br />Superfund Site, US Army Corps of Engineers,
<br />Maywood, NJ, 12/2000 - OS/2004. The project,
<br />located in Maywood, Nj, designed and constructed
<br />necessary for the mediation of low le\'el radioacti\'e soil
<br />at site.
<br />
<br />Directed hydrological and hydraulic studies for existing
<br />site and excavation. Determined peak pumping rate
<br />required for dewatering seepage and surface water within
<br />an exca\'ation of each cluster. Designed a bypass
<br />drainage system during construction.
<br />
<br />Lead Hydraulic Engineer, State Route 96 Widening,
<br />Georgia Department of Transportation, Georgia,
<br />Taylor County, GA, 02/1999 - 04/2004. The project
<br />designed the widening of approximately 8.5 miles of
<br />State Route (SR) 96 in Taylor County, Georgia to meet a
<br />projected traffic volume of 4425 vehicle per day.
<br />
<br />JONG-CHIANG SHIAU
<br />
<br />3
<br />
|