Laserfiche WebLink
<br />e <br /> <br />-' <br /><( <br /><f) <br />o <br />"- <br />o <br />Q: <br />"- <br /><f) <br />I <br />I- <br />U. <br />o <br />w <br />(!) <br /><( <br />"- <br />":J <br />I- <br />>= <br />W <br />I <br />I- <br />Z <br />o <br />Z <br />o <br />>= <br />CJ <br />'" <br />I- <br /><f) <br />W <br />Q: <br />W <br />I <br />I- <br />o <br />I- <br /> <br />ei <br /><f) <br />~ <br />I- <br />W <br />W <br />I <br /><f) <br /><f) <br />I <br />I- <br />Z <br />o <br />o <br />w <br />z <br />4' <br />I- <br />Z <br />o <br />CJ <br /><( <br />I- <br /><( <br />o <br />u. <br />o <br />W <br />Q: <br />::> <br /><f) <br />g <br />CJ <br /><f) <br />o <br />Q: <br />o <br />W <br /><f) <br />::> <br /> <br />e <br /> <br />SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES <br /> <br />hydrocarbons, chlorinated solvents, mctals, dioxins, and <br />furans. In addition, Mr. Cunningham rcviewed all <br />submittals, prepared work scopes and cost estimates, <br />and interfaced \vith the client and regulatory agencics. <br /> <br />Program Manager/Project Manager, DERM-04 <br />Contract, FL. SetTed as local contact responsible for <br />program and contract management. \\Tork types <br />involved construction and remediation projects <br />including landfill capping, construction of a compressed <br />natural gas facility, construction of a utility corridor and <br />soil excantion project at the Miami International <br />i\irport, and removal of an underground storage tank <br />and installation of an aboveground fuel system at the <br />South Dade County Landfill. <br /> <br />Program Manager/Project Manager, U.S. Postal <br />Service, Florida Statewide AE Contract. Responsible <br />for program and contract managemcnt of this <br />cm'ironmental set'\.ices contract. This work included <br />multiple sites and tasks throughout Florida. Typical <br />work scopes included: Phase [ and [[ environmcntal <br />property transfer audits for proposed postal facility <br />locations, lead and asbcstos sut'\.cys, wetland SU1TCYS and <br />mitigation, and cncrgy rcduction Sllt'\'CyS. [n addition, <br />0.[r. Cunningham rc\.iewed all submittals, preparcd work <br />scopes and cost estimates, and interfaced with the client <br />and regulatory agencies. <br /> <br />Project Manager/Hydrogeologist, Chemical <br />Spraying Site, Palm Beach County, FL. c..[anaged <br />and prm'ided on-site coordination for a rapid response <br />soil and groundwater investigation il1\'olving dioxins, <br />furans, metals, and hydrocarbons. \Vork included <br />multiple well and boring installations and soil and <br />groundwater sampling activities conductcd in Lcvel 13 <br />and C personal protective equipment. Follow-up work <br />im'olved preparation of an asscssment rcport for usc by <br />the regulatory agency for consent order negotiations. <br /> <br />Project Manager/Hydrogeologist, Convenience <br />Store Chain, FL and GA. Responsiblc for ovcrall <br />contract, project, and program management for over 200 <br />facilities in Florida and Georgia. \'Cork types im'olvcd: <br />UST contamination assessments, rcmcdial action plans, <br />cmergency response to spills, remediation system <br />installation, system operation and maintenance, <br />monitoring only plans, aquifer testing and intcrpretation, <br />NPDES permitting, bioassay testing, discharge <br />monitoring and reporting, correcti\'e action plans, <br />compliance audits, toxicity reduction e\'aluations, and <br />Phase I and II audits. [n addition, 0.[r. Cunningham <br />rc\.ie\vcd all submittals, prepared work scopcs and cost <br />estimates, and interfaced with the client and regulatory <br />agencies. <br /> <br />SHAW ENVIRONMENTAL. INC. <br /> <br />2 <br /> <br />KENNETH A. CUNNINGHAM, P.G. <br /> <br />06C 122006T <br />