|
<br />e
<br />
<br />-'
<br /><(
<br /><fJ
<br />o
<br />"'-
<br />o
<br />'"
<br />"'-
<br />en
<br />I
<br />>-
<br />"'-
<br />o
<br />w
<br />"
<br /><(
<br />"'-
<br />w
<br />-'
<br />>-
<br />>=
<br />w
<br />:r:
<br />>-
<br />z
<br />o
<br />z
<br />o
<br />>=
<br />u
<br />0:
<br />>-
<br /><fJ
<br />W
<br />'"
<br />W
<br />:r:
<br />>-
<br />o
<br />>-
<br />ei
<br />en
<br />~
<br />>-
<br />w
<br />w
<br />:r:
<br />en
<br />en
<br />I
<br />>-
<br />z
<br />o
<br />o
<br />w
<br />Z
<br /><(
<br />>-
<br />z
<br />o
<br />u
<br /><(
<br />>-
<br /><(
<br />o
<br />"'-
<br />o
<br />w
<br />'"
<br />::>
<br />en
<br />o
<br />-'
<br />U
<br />en
<br />o
<br />'"
<br />o
<br />w
<br />en
<br />::>
<br />
<br />e
<br />
<br />SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
<br />
<br />power distribution centers including 13.8kV, ..J-.16kV and
<br />..J-80V sw'itchgear, underground ductbanks, etc. He also
<br />provided electrical support for the design of a lift
<br />station, a 7,OOOft long limestone and gypsum material
<br />handling (conveyor) system, a waste \vater treatment
<br />facility, and other auxiliary systems. Developed project
<br />schedules and cost estimate. Prepared system design
<br />criteria and specifications.
<br />
<br />The following is a summary of key projects:
<br />Project Manager, South Boston Piers Transitway
<br />Project, MBTA, Boston, MA, 02/2000 - 06/2006.
<br />Design and Construction of a [\[aintenance Facility for
<br />electrical/ diesel and compressed natural gas fueled ..J-O ft
<br />and 60 ft busses
<br />
<br />Accomplishments:
<br />Designed, supported construction and start-up of the
<br />electrical power, lighting, fire detection and gas detection
<br />systems, including prm'isions for [-lazardous Class I,
<br />Di\'ision 2 locations.
<br />
<br />Project Manager, New Haven Diesel Shop
<br />Reconstruction, Connecticut Department of
<br />Transportation, Boston, MA, 09/1998 - 12/2000.
<br />[\[odify existing maintenance facility for trains.
<br />
<br />,-\ccomplishments:
<br />Designed modifications to the diesel shop, the train
<br />washer system, the normal and emergency electrical
<br />distribution systems, and the gas detection and
<br />monitoring system in Class 1, Division 2 areas.
<br />
<br />Project Manager, Maritimes and Northeast Meter
<br />Stations, M&N Gas Company, Maine & MA,
<br />09/1999 - 03/2000. Design and construction support
<br />for twelve gas metering stations in [\[aine and
<br />t\lassachusetts.
<br />
<br />Accomplishments:
<br />Designed and supported construction of the gas
<br />metering stations, including the electrical, controls and
<br />instrumentation systems and the electrical selTice to
<br />each station.
<br />
<br />Project Manager, Clayton Gas Compression Station,
<br />North Carolina Natural Gas Company, Boston, MA,
<br />01/1999 - 03/2000. Design and Construction of a
<br />
<br />. .
<br />compression gas station.
<br />
<br />SHAW ENVIRONMENTAL, INC.
<br />
<br />06C122006T
<br />
<br />Accomplishments:
<br />Established the Class 1, Division I and Division 2
<br />Hazardous Classifications for plant areas, and designed
<br />the entire electrical distribution system for two 1800 hp
<br />compressor stations, including the sen'ice entrance,
<br />grounding, interior and exterior lighting, and cathodic
<br />and lightning protection systems. Prepared the
<br />procurement specifications for UPS, emergency
<br />generator, motor control center, and pO\ver distribution
<br />switchboards. Performed bid evaluations and prepared
<br />the electrical and instrumentation installation
<br />specification. PrO\'ided support for construction and
<br />
<br />. . . .
<br />station commlsston111g.
<br />
<br />Project Manager, Nantucket Compost Facility,
<br />Waste Options Nantucket, LLC, Boston, MA,
<br />07/1998 - 12/1999. Design/build first of a king
<br />compost facility.
<br />
<br />;\ccomplishments:
<br />Directed the engineering, design, construction
<br />management, testing and start-up of the electrical and
<br />process control work, inclucling the design of the
<br />electrical distribution throughout the plant.
<br />
<br />Project Manager, Seabrook Station, Northeast
<br />Utilities, Seabrook, NH, 04/1997 - 07/1997. Design
<br />and construction of modifications to nuclear plant.
<br />
<br />Accomplishments:
<br />Directed the electrical and control system design for the
<br />Control Building Air Handling System. Prepared
<br />schematic diagrams, sized feeder cables, and circuit
<br />breakers, re\'ised ,'endor drawings and calculations to
<br />reflect the installation of new chillers and auxiliary
<br />systems.
<br />
<br />Project Manager, Delaware City Compression
<br />Station, Eastern Shore Natural Gas Company,
<br />Delaware City, DE, 01/1996 - 03/1997. Design and
<br />construction of a natural gas compression station.
<br />
<br />Accomplishments:
<br />Designed the entire electrical distribution system for the
<br />station. Preparcd the procurement specifications for
<br />UPS, standby generator, power distribution
<br />switchboards, powcr panels, motor controllers, and
<br />electrical installation. Performcd bid evaluations, and
<br />
<br />NESS 1M S. ESKINAZI
<br />
<br />2
<br />
|