Laserfiche WebLink
<br />e <br /> <br />-' <br /><( <br /><fJ <br />o <br />"'- <br />o <br />'" <br />"'- <br />en <br />I <br />>- <br />"'- <br />o <br />w <br />" <br /><( <br />"'- <br />w <br />-' <br />>- <br />>= <br />w <br />:r: <br />>- <br />z <br />o <br />z <br />o <br />>= <br />u <br />0: <br />>- <br /><fJ <br />W <br />'" <br />W <br />:r: <br />>- <br />o <br />>- <br />ei <br />en <br />~ <br />>- <br />w <br />w <br />:r: <br />en <br />en <br />I <br />>- <br />z <br />o <br />o <br />w <br />Z <br /><( <br />>- <br />z <br />o <br />u <br /><( <br />>- <br /><( <br />o <br />"'- <br />o <br />w <br />'" <br />::> <br />en <br />o <br />-' <br />U <br />en <br />o <br />'" <br />o <br />w <br />en <br />::> <br /> <br />e <br /> <br />SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES <br /> <br />power distribution centers including 13.8kV, ..J-.16kV and <br />..J-80V sw'itchgear, underground ductbanks, etc. He also <br />provided electrical support for the design of a lift <br />station, a 7,OOOft long limestone and gypsum material <br />handling (conveyor) system, a waste \vater treatment <br />facility, and other auxiliary systems. Developed project <br />schedules and cost estimate. Prepared system design <br />criteria and specifications. <br /> <br />The following is a summary of key projects: <br />Project Manager, South Boston Piers Transitway <br />Project, MBTA, Boston, MA, 02/2000 - 06/2006. <br />Design and Construction of a [\[aintenance Facility for <br />electrical/ diesel and compressed natural gas fueled ..J-O ft <br />and 60 ft busses <br /> <br />Accomplishments: <br />Designed, supported construction and start-up of the <br />electrical power, lighting, fire detection and gas detection <br />systems, including prm'isions for [-lazardous Class I, <br />Di\'ision 2 locations. <br /> <br />Project Manager, New Haven Diesel Shop <br />Reconstruction, Connecticut Department of <br />Transportation, Boston, MA, 09/1998 - 12/2000. <br />[\[odify existing maintenance facility for trains. <br /> <br />,-\ccomplishments: <br />Designed modifications to the diesel shop, the train <br />washer system, the normal and emergency electrical <br />distribution systems, and the gas detection and <br />monitoring system in Class 1, Division 2 areas. <br /> <br />Project Manager, Maritimes and Northeast Meter <br />Stations, M&N Gas Company, Maine & MA, <br />09/1999 - 03/2000. Design and construction support <br />for twelve gas metering stations in [\[aine and <br />t\lassachusetts. <br /> <br />Accomplishments: <br />Designed and supported construction of the gas <br />metering stations, including the electrical, controls and <br />instrumentation systems and the electrical selTice to <br />each station. <br /> <br />Project Manager, Clayton Gas Compression Station, <br />North Carolina Natural Gas Company, Boston, MA, <br />01/1999 - 03/2000. Design and Construction of a <br /> <br />. . <br />compression gas station. <br /> <br />SHAW ENVIRONMENTAL, INC. <br /> <br />06C122006T <br /> <br />Accomplishments: <br />Established the Class 1, Division I and Division 2 <br />Hazardous Classifications for plant areas, and designed <br />the entire electrical distribution system for two 1800 hp <br />compressor stations, including the sen'ice entrance, <br />grounding, interior and exterior lighting, and cathodic <br />and lightning protection systems. Prepared the <br />procurement specifications for UPS, emergency <br />generator, motor control center, and pO\ver distribution <br />switchboards. Performed bid evaluations and prepared <br />the electrical and instrumentation installation <br />specification. PrO\'ided support for construction and <br /> <br />. . . . <br />station commlsston111g. <br /> <br />Project Manager, Nantucket Compost Facility, <br />Waste Options Nantucket, LLC, Boston, MA, <br />07/1998 - 12/1999. Design/build first of a king <br />compost facility. <br /> <br />;\ccomplishments: <br />Directed the engineering, design, construction <br />management, testing and start-up of the electrical and <br />process control work, inclucling the design of the <br />electrical distribution throughout the plant. <br /> <br />Project Manager, Seabrook Station, Northeast <br />Utilities, Seabrook, NH, 04/1997 - 07/1997. Design <br />and construction of modifications to nuclear plant. <br /> <br />Accomplishments: <br />Directed the electrical and control system design for the <br />Control Building Air Handling System. Prepared <br />schematic diagrams, sized feeder cables, and circuit <br />breakers, re\'ised ,'endor drawings and calculations to <br />reflect the installation of new chillers and auxiliary <br />systems. <br /> <br />Project Manager, Delaware City Compression <br />Station, Eastern Shore Natural Gas Company, <br />Delaware City, DE, 01/1996 - 03/1997. Design and <br />construction of a natural gas compression station. <br /> <br />Accomplishments: <br />Designed the entire electrical distribution system for the <br />station. Preparcd the procurement specifications for <br />UPS, standby generator, power distribution <br />switchboards, powcr panels, motor controllers, and <br />electrical installation. Performcd bid evaluations, and <br /> <br />NESS 1M S. ESKINAZI <br /> <br />2 <br />