<br />.
<br />
<br />-'
<br />0{
<br />VJ
<br />a
<br />a.
<br />a
<br />'"
<br />a.
<br />VJ
<br />I
<br />>-
<br />u.
<br />a
<br />UJ
<br />co
<br />0{
<br />a.
<br />~
<br />>-
<br />>=
<br />UJ
<br />I
<br />>-
<br />Z
<br />a
<br />z
<br />a
<br />>=
<br />u
<br />ii:
<br />>-
<br />VJ
<br />UJ
<br />'"
<br />UJ
<br />I
<br />>-
<br />a
<br />>-
<br />
<br />.~
<br />VJ
<br />!!l
<br />>-
<br />UJ
<br />UJ
<br />I
<br />rJ)
<br />VJ
<br />I
<br />>-
<br />z
<br />a
<br />o
<br />UJ
<br />z
<br />;;:
<br />>-
<br />z
<br />a
<br />u
<br />0{
<br />>-
<br />0{
<br />o
<br />u.
<br />a
<br />UJ
<br />'"
<br />:::l
<br />VJ
<br />a
<br />-'
<br />u
<br />VJ
<br />o
<br />'"
<br />a
<br />UJ
<br />VJ
<br />:::l
<br />
<br />.
<br />
<br />SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
<br />
<br />prm'idecl support for construction and station
<br />commlsslon1l1g.
<br />
<br />Project Manager, Maine Yankee Atomic Power
<br />Station, Maine Yankee Atomic Power Company,
<br />Barth, ME, 02/1996 - 01/1997. Design and
<br />construction of modifications to nuclear plant.
<br />
<br />Accomplishments:
<br />
<br />Directed the onrall electrical and control design of
<br />modifications to the Atmospheric Steam Dump and the
<br />High Energy Line Break Systems.
<br />
<br />Project Manager, Millstone Nuclear Plant Units #2
<br />& 3, Northeast Utilities, CT, 09/1995 - 01/1996.
<br />Perform and update calculations for major electrical
<br />eqU1pment.
<br />
<br />Accomplishments:
<br />Re\.iewed calculations for sizing im'erters and \.ital bus
<br />feeder cables for Unit 3. He also performed a dynamic
<br />analysis of the ..J- k\' and 6 k\' safcty relatcd motors
<br />under accident conditions, for Unit 2, using the E'L\P
<br />computer program.
<br />
<br />Project Manager, Hawks Nest-Glen Ferris Hydro
<br />Plants, Union Carbide, Glen Ferris, WV, 03/1975 -
<br />11/1975. Feasibility study for expanding existing hydro
<br />plants.
<br />
<br />i\ccomplishments:
<br />Pcrformed a study to detcrmine the feasibility of
<br />expanding the hydroelectric gcncrating capacity of the
<br />existing Hawks Nest and Glen Ferris plants up to 40
<br />1\[\'\'. Prepared alternate schemes for 25 Hz and 60 Hz
<br />generation and order-of-magnitude construction cost
<br />cstimates for the most promising arrangements,
<br />including transmission and switching facilities.
<br />
<br />Senior Electrica[ Engineer, Reliability Improvement
<br />Program, Fortune 500 Telecommunications
<br />Company, Boston, MA, 09/1995 - 12/1995.
<br />E\'aluation of the elcctrical distribution system at scveral
<br />sites of a Telecommunication Company
<br />
<br />Accomplishments:
<br />Performed short circuit calculations, evaluated the
<br />design adequacy of the electrical distribution system at
<br />
<br />SHAW ENVIRONMENTAL, INC.
<br />
<br />06C 122006T
<br />
<br />several sites, and made recommendations for
<br />Improvements.
<br />
<br />Project Manager, Comanche Peak Stearn Electric
<br />Station, Unit 1, Texas Utilities, Dallas, TX, 06/1986
<br />- 12/1988. Reviewed major electrical calculations.
<br />
<br />Accomplishments:
<br />Reviewed major electrical calculations and system design
<br />for the sequential loading of the emergency diesel
<br />generators, DC batteries and battery chargers, short
<br />circuit, and \'oltage profile calculations. Validated the
<br />entire plant lighting system, including IOCFR50
<br />.Appendix "R" recluirements.
<br />
<br />12/1988 - 09/1995, Lead Electrical
<br />Engineer, NStar (previously Boston
<br />Edison Company), Project Engineering
<br />Department, Boston, MA
<br />As Lcad Elcctrical Enginecr 1\[r. Eskinazi dirccted and
<br />supen'ised the Electrical Group \vhich was accountable
<br />for the engineering, procuremcnt, and installation of thc
<br />electrical work in support of the l\fystic and Ne\v Boston
<br />fossil stations, and the l\fedway combustion turbine
<br />stations. Thc \vork includcd implementing state-of-thc-
<br />art technologies for data acquisition, communication,
<br />protective relaying, large adjustable speed dri\'es (ASD),
<br />UPS, 13.8 k\',..J- k\', and ..J-80 V s\vitchgear, motors, and
<br />powcr distribution systems. Pcrformed load flow,
<br />voltage profile, and short circuit calculations, using thc
<br />DAPPER and i\-Fault programs.
<br />
<br />Electrical Engineering, Pilgrim Nuclear Station,
<br />Pilgrim Nuclear Station, Plymouth, MA, 12/1988 -
<br />12/1991. Provided electrical support to the operation of
<br />the Pilgrim Nuclcar Station.
<br />
<br />Accomplishments:
<br />
<br />1\fanaged several modifications at the Pilgrim Nuclear
<br />Station which brought the unit in sen'ice after the NRC
<br />shutdown. Designed a radio transfer scheme to test the
<br />diesel generator and other modifications in compliance
<br />with Station Blackout Rulc IOCFR50.G3.