Laserfiche WebLink
<br />. <br /> <br />-' <br /><( <br />Ul <br />o <br />0. <br />o <br />"" <br />0. <br />Ul <br />I <br />>- <br />u.. <br />o <br />w <br />'" <br /><( <br />0. <br />~ <br />>- <br />;:: <br />w <br />I <br />>- <br />Z <br />o <br />Z <br />o <br />;:: <br />u <br />02 <br />>- <br />Ul <br />W <br />"" <br />W <br />I <br />>- <br />o <br /> <br />.~ <br /> <br />::J <br />Ul <br />!Q <br />>- <br />w <br />W <br />I <br />Ul <br />Ul <br />I <br />>- <br />z <br />o <br />o <br />w <br />z <br />;:;: <br />>- <br />z <br />o <br />u <br /><( <br />>- <br /><( <br />o <br />u.. <br />o <br />w <br />"" <br />::J <br />Ul <br />g <br />U <br />Ul <br />is <br />"" <br />o <br />w <br />Ul <br />::J <br /> <br />. <br /> <br />SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES <br /> <br />01/2000 - 01/2003, Project Manager, Gale <br />Associates, Civil, Weymouth, MA <br />As Project I\Ianager, I\[r. Fairbanks was responsiblc for <br />the engineering, procurement selTiccs, and construction <br />phase ser\.ices for various public and private projects <br />consisting of athletic complexes, parks, parking lots, <br />roadway projects, and airport facility projects. <br /> <br />The following is a summary of key projects: <br />Project Manager, Framingham State College <br />Parking Expansion Project, Framingham State <br />College, Framingham, MA, 08/2002 - 01/2003. The <br />project consisted of a new sidchill parking lot. Mr. <br />Fairbanks' responsibilities included schcmatic design <br />studies of structure vs. at-gradc lot, cost cstimating, <br />design of retaining walls abm"c and below the lot, steam <br />linc relocation, drainage dcsign and tic-in to Mass <br />Highway Route 9 drainage system. <br /> <br />Project Manager, Pottle Street Athletic Field <br />Complex, Town of Kingston, MA, Kingston, MA, <br />03/2002 - 01/2003. The project consisted of the <br />engineering, procurement, and construction phase <br />sCLyices for the site de\"elopment of thc ncw II-field <br />complex including 23 acrcs of grading, drainagc, <br />wetlands replication, fencing, irrigation, parking lots and <br />roachvays, and planning board and conservation <br />commission interface. l\dditional scope included <br />redesign of the entrance road and support of land <br />takings by the Town. <br /> <br />Project Manager, Facility Assessment Project, <br />Rhode Is[and Airport Corporation, RI, 04/2001- <br />09/2001. The project consisted of the assessment of 20 <br />existing buildings at six RIAC airports. Report includcd <br />cost estimates and recommendations regarding <br />rehabilitation and asset prioritization. Mr. Fairbanks <br />performed all inspections and compiled thc report. <br /> <br />Project Manager, Newport State Airport Snow <br />Removal Equipment Garage, Rhode Island Airport <br />Corporation (RIAC), Newport, RI, 06/2000 - <br />OS/2001. The project consisted of the engineering, <br />procurement, and construction phase services for a new <br />snow removal cquipment building. I\lr. Fairbanks' <br />responsibilities consisted of the engineering of the new <br />3000 square foot building, its foundations, and site <br /> <br />SHAW ENVIRONMENTAL, INC. <br /> <br />06C122006T <br /> <br />improvements and the procurement process finishing <br />with services during construction. <br /> <br />Project Manager, Town of Carver Purchase Street <br />Athletic Fields, Town of Carver, Carver, MA, <br />01/2000 - 11/2000. The project consisted of thc <br />engineering, permitting, procurement, and construction <br />phase services for a ne\v athletic field complex. I\[r. <br />Fairbanks engineered the permitting, field layout, <br />irrigation system, and parking lot. He also prepared the <br />procurement package for the \vork and prm"ided <br />construction phase ser\"ices. <br /> <br />02/1978 - 12/1999, Senior Civil/Structural <br />Engineer, Stone & Webster, <br />Civil/Structural Division, Boston, MA <br />Responsibilities consisted of all aspects of design and <br />engineering including bid document preparation, <br />proposal preparation, technical studies, permitting, client <br />interface, presentations, and technical writing. <br /> <br />Thc follO\ving is a summary of key projccts: <br />Senior Civil/Structural Engineer, Mass Highway <br />Department Concrete Bridge Inspection, Mass <br />Highway Department, Boston, MA, 10/1999- <br />12/1999. I\lass Highway required that all concrete arch <br />bridgcs be inspected in I\Iassachusetts as a precaution <br />after a structural problem develop cd on a similar <br />structure. I\[r. Fairbanks performed inspections of <br />numerous bridges on land and from the water surface <br />bencath as wcll as the superstructure abm"e and <br />compiled inspection results into the report submitted. <br /> <br />Senior Civil/Structural Engineer, MBT A <br />Transitway, Massachusetts Bay Transportation <br />Authority (MBT A), Boston, MA, 09/1998 - 05/1999. <br />The project consisted of thc cnginecring, procurement, <br />and construction phase services for the construction of <br />the Silver Line, an underground bus transitway. Mr. <br />Fairbanks provided general support in the procurement <br />and construction phase services portion of the project. <br /> <br />Senior Civil/Structural Engineer, Private Fuel <br />Storage Transportation Study, Private Fuel Storage, <br />LLC, Tooele, UT, 06/1998 - 09/1998. The project <br />consistcd of a fcasibility analysis of constructing a 26 <br />mile rail line to a remote location for storage of nuclear <br />waste. Mr. Fairbanks' responsibilities included estimates, <br /> <br />ANDREW K. FAIRBANKS 2 <br />