|
<br />e
<br />
<br />u.
<br />o
<br />w
<br />"
<br /><(
<br />a.
<br />':i
<br />>-
<br />;::
<br />W
<br />I
<br />>-
<br />Z
<br />o
<br />Z
<br />o
<br />;::
<br />u
<br />ii'
<br />>-
<br />VJ
<br />W
<br />'"
<br />W
<br />I
<br />>-
<br />o
<br />>-
<br />ei
<br />VJ
<br />~
<br />>-
<br />W
<br />W
<br />I
<br />VJ
<br />VJ
<br />I
<br />>-
<br />z
<br />o
<br />o
<br />w
<br />z
<br />;;'
<br />>-
<br />z
<br />o
<br />u
<br /><(
<br />>-
<br /><(
<br />o
<br />u.
<br />o
<br />w
<br />'"
<br />:::>
<br />VJ
<br />o
<br />..J
<br />U
<br />VJ
<br />o
<br />'"
<br />o
<br />w
<br />VJ
<br />:::>
<br />
<br />e
<br />
<br />SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
<br />
<br />John W Finik, P.E.
<br />
<br />Education
<br />B.S., Ci\'il Engineering, Columbia Uni,"ersity, 1980
<br />1L\., Mathematics, Bowdoin College, 1978
<br />
<br />Registrations
<br />Professional Engineer: Structural, NH
<br />
<br />Background Summary
<br />
<br />i\Ir. Finik is a Project i\Ianager and Professional
<br />Engineer with more than 26 years of engineering, design,
<br />and consulting and project management experience with
<br />increasing responsibility gained from a broad range of
<br />assignments. He has both performed and directly
<br />supelTised engineering, design and construction phase
<br />tasks for a variety of utility, municipal, infrastructure and
<br />transportation projects. These tasks have included
<br />management consulting, operations and maintenance
<br />(O&[-..Q consulting, inspection/ e,"aluation of existing
<br />facilities, preparation of needs analyses/ feasibility
<br />studies, site selection studies and conceptual layouts; the
<br />preparation of specifications, contract and bid
<br />documents, design calculations, and engineering and
<br />construction cost estimates; and the preparation of both
<br />manually drafted and C\DD-generated construction
<br />drawings. He is also experienced in construction phase
<br />engineering, including the preparation of design changes
<br />and the evaluation of contractor change recluests and
<br />claims, with emphasis on configuration management and
<br />claims avoidance. i\S a Project [-..Ianager in the
<br />Transportation Department, he is responsible for the
<br />day-to-day administration of a ,'arious multidiscipline
<br />engineering consulting selTices contracts. His
<br />responsibilities include identifying and cultin ting
<br />potential new ,vork; developing proposals and
<br />presentations; providing technical and administrative
<br />direction; coordinating engineering, scope development,
<br />schedules, and budget control; cJuality reviews of
<br />engineering products; and managing subconsultant
<br />services, all under various contract terms including Cost
<br />Plus/NTE, Lump Sum and Indefinite Quantity (Task
<br />Order) bases.
<br />
<br />Among i\Ir. Finik's specialties are the execution of
<br />General Engineering Consulting (Indefinite
<br />
<br />I SHAW ENVIRONMENTAL. INC.
<br />06C122006T
<br />
<br />Ouantit:v/Task Order/On-Call SelTices) contracts, and
<br />'- ~
<br />the management of facility design projects. [n both
<br />cases, his breadth of experience in all project phases,
<br />familiarity \vith technical, commercial and construction
<br />processes, and his ability to cJuickly mobilize the
<br />necessary project resources and to effecti,"ely manage
<br />multidiscipline, multi-firm teams has allowed Shaw to be
<br />responsive to client needs while completing and
<br />deliYering quality products on schedule and within
<br />budget.
<br />
<br />His facilities experience has been gained in the
<br />transportation, utility, institutional and commercial
<br />sectors, and ranges from light construction (office
<br />buildings, parking garages, hospitals, warehouses and
<br />outdoor commuter stations) to hea,"y construction,
<br />including ,vater intake structures, hydro powerhouses,
<br />higl1\vay and rail tunnel systems, and industrial-gradc
<br />maintcnance facilities.
<br />
<br />[-,,11'. Finik's power industry experience includes nuclear,
<br />fossil (coal and gas), and h~'droclectric pO\ver projects,
<br />where his rcsponsibilities hm"e included power plant
<br />design (new concrete and steel structures, modifications
<br />to existing structures, and seismic design/ qualification of
<br />structures and electrical raccwa," s\'stcms) and
<br />undcrground transmission projects. His infras tructurc
<br />engineering experience has been gained from projects
<br />related to highway, transit and raihvay engineering,
<br />maintenance and warehousing facilities, and
<br />transportation agency operations. He has becn
<br />responsiblc for a wide variety of tasks for a number of
<br />maintenance facility projects for commuter rail and light
<br />rail \'Chicles, buses, and higll\vay departmcnt \"ehicles.
<br />
<br />Relevant Experience
<br />Project Manager I, Shaw Environmental &
<br />Infrastructure, Inc.
<br />Responsible for the day-to-day administration of a
<br />various multidiscipline engineering consulting selTices
<br />contracts. Responsibilities include identifying and
<br />cultivating potential new work; developing proposals and
<br />presentations; prO\"icling technical and administrative
<br />direction; coordinating engineering, scope development,
<br />schedules, and budget control; quality reviews of
<br />engineering products; and managing subconsultant
<br />services, all under various contract terms.
<br />
<br />JOHN W FINIK Q
<br />
|