Laserfiche WebLink
<br />e <br /> <br />...i <br />.. <br />en <br />a <br />"- <br />a <br />'" <br />"- <br />en <br />I <br />f- <br />u.. <br />a <br />w <br />'" <br />.. <br />"- <br />~ <br />f- <br />;:: <br />W <br />I <br />f- <br />Z <br />a <br />z <br />a <br />;:: <br />u <br />ii' <br />f- <br />en <br />w <br />'" <br />W <br />I <br />f- <br />a <br />f- <br /> <br />ei <br />en <br />~ <br />f- <br />W <br />W <br />I <br />en <br />en <br />I <br />f- <br />Z <br />a <br />o <br />w <br />z <br />;;: <br />f- <br />Z <br />a <br />u <br />.. <br />f- <br />.. <br />o <br />u.. <br />a <br />w <br />'" <br />::::> <br />en <br />g <br />u <br />en <br />is <br />'" <br />a <br />w <br />en <br />::::> <br /> <br />e <br /> <br />SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES <br /> <br />The following is a summary of key projects: <br />Project Manager - General Engineering Consulting <br />Services, Massachusetts Turnpike Authority, <br />Weston, MA, 8/2005 - Present. Served as Project <br />t-.Ianager for Shaw's role on a team providing consulting <br />selTices to the i\uthority. Shaw"s rcsponsibility for areas <br />of expertise included geotechnical and foundations <br />engineering; blasting and tunneling; vehicle and <br />equipment maintenance facilities; mechanical, electrical <br />and fire protection; materials engineering, and <br />eIwironmental monitoring. Assisted with conducting <br />thc Triennial Inspcction (condition assessmcnt) of the <br />\'\"cstcrn Turnpikc. <br /> <br />Lead Civil/Structural/Architectural Engineer- <br />White Phosphorous Modernization Project, United <br />States Army, Pine Bluff Arsenal, AK, 10/2006- <br />Present. SeITed as Lead Civil/Structural/ i\rchitectural <br />Engincer for this facility modernization projcct. which <br />includes installation of ncw yard structurcs, foundations <br />and proccss equipment, installation of ncw proccss <br />equipment and systems in and associated structural <br />modifications to thc existing building. <br /> <br />Project Manager & Technical Consultant, South <br />Boston Piers Transitway Project, Massachusetts <br />Bay Transportation Authority (MBTA), Boston, <br />MA, 11/1998 - Present. SelTed as Project t-.[anager and <br />later as t-.Ianagement & Technical Consultant on a <br />project to prm"idc underground and surfacc tracklcss <br />trolle," sen"ice from downtown Boston to thc South <br />Boston Piers area. Duties include dirccting the multiplc <br />teams designing systemwide elements and the vehicle <br />maintenance facility for this projcct, while coordinating <br />this work with ongoing design and construction (by <br />others) of transil\vay tunnels and stations and adjacent <br />roadways. <br /> <br />. The systemwide work includes design and <br />construction phase services for: <br /> <br />. Emergency tunnel ventilation; <br /> <br />. Signals, communications, tunnel lighting, and <br />emergency fan controls; <br />. Traction powcr and ovcrhcad catcnary for thc <br />vehicles; <br />. A 1.25-mile underground 13.8 kV power line serving <br />the project from an cxisting MBTA switching station. <br /> <br />I SHAW ENVIRONMENTAL, INC. <br /> <br />o;;C122006T <br /> <br />. Dutics include coordinating multiple disciplincs and <br />subconsultants to cxecute a comprehensi'T projcct <br />scopc for the maintenance facility on an accelerated <br />"fast track" schcdule, including: <br />. Gcotechnical and environmental site im'cstigations, <br />including borings <br />. Site topographic sUlTey for design and to support <br />propcrty acqUIsItiOn; <br />. Needs definition and facility programming; <br />. Conceptual and schcmatic design; <br />. Sitc environmental remediation plans; <br />. Preliminary and Final Design (Industrial, <br />Ci,'il/ Utilities, Gcotcchnical, Em'ironmcntal, <br />Architectural, l'vIechanical, Elcctrical, Structural and <br />Landscape Architecturc); and <br />. Construction Phase Engineer Support Sel'\.ices <br /> <br />Project Engineer/Lead Civil Engineer, 345KV <br />Transmission Reliability Project, NST AR Electric <br />& Gas Co, Boston, MA, 07/2004 - 10/2005. SCl'\"cd <br />as Project Enginccr and Lead Civil Engineer for thc final <br />coordination and prcparation of bid documcnts for a <br />project consisting of the installation of thrce new 3-+5 kV <br />underground transmission lines employing pipc-typc <br />cablc undcr approximately 16 milcs of roadways through <br />suburban and dcnsely populated urban arcas in thc <br />metro Boston arca. The projcct included construction <br />of a ncw switchyard at thc point of origin and the <br />expansion of l\vo othcr substations at the termination <br />points. i\ third substation had a heat cxchanger installed <br />as part of the projcct scope. <br /> <br />Deputy Project Manager, Anderson Regional <br />Transportation Center, Massachusetts Port <br />Authority, Woburn, MA, 08/1997 - 06/1998. Served <br />as Dcputy Project l'vIanager, leading a seven-firm team in <br />the planning and design of a new intermodal <br />transportation center at the Indus triplex site in \Voburn, <br />1\L-\. The facility combines t-.Iassport Logan Express, <br />l\IBT A commuter rail, and park-and-ride facilities for <br />t-.Iassport, rvlBT f\ and l\lassHighway on a single site. <br />The site included a multilevel parking structure. <br />Constmction of a new multifunction station building, <br />commuter rail platforms, reconfiguration of the existing <br />track and signal system and of the access and site <br />roadway systcms, establishment of safe and cOlwenicnt <br />pedestrian travel patterns and effective parking revenuc <br />collection and control are among the key elements of the <br /> <br />JOHN W FINIK D <br />