Laserfiche WebLink
<br />e <br /> <br />ei <br /> <br />V) <br />!!2 <br />t- <br />UJ <br />UJ <br />I <br />V) <br />V) <br />I <br />t- <br />Z <br />o <br />o <br />UJ <br />z <br />4' <br />t- <br />Z <br />o <br />u <br /><< <br />t- <br /><< <br />o <br />"- <br />o <br />UJ <br />0:: <br />::J <br />V) <br />g <br />u <br />V) <br />o <br />0:: <br />o <br />UJ <br />V) <br />::J <br /> <br />. <br /> <br />SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES <br /> <br />CERCLA-compliant Five- Year Re\'iew at the site for <br />USEPA and Operation and Maintcnance of the sitc <br />under l\lassachusetts Department of Environmental <br />Protection. <br /> <br />...i <br /><< <br />V) <br />o <br />a. <br />o <br />0:: <br />a. <br />V) <br />I <br />t- <br />"- <br />o <br />UJ <br />'" <br /><< <br />a. <br />UJ <br />-' <br />t- <br />t= <br />UJ <br />I <br />t- <br />Z <br />o <br />z <br />o <br />t= <br />u <br />ii' <br />t- <br />V) <br />UJ <br />0:: <br />UJ <br />I <br />t- <br />o <br />t- <br /> <br />l\ls London also has extensivc experience in <br />em'ironmental compliance during construction and <br />construction management. On the Boston Harbor <br />Project, she directed Ci\I staff performing environmcntal <br />compliance inspections and permit monitoring, which <br />included NPDES rcporting, and noise, and traffic <br />monitoring to maintain compliancc with mitigation <br />agreements and pcrmit conditions. She was also <br />rcsponsible for verifying that construction contractors <br />were in compliance with contract requirements <br />pertaining to issues such as hazardous waste <br />management, noise, erosion and sedimentation control, <br />etc. Similarly, Ms. London managed the Environmental <br />Compliance Program for a water supply project <br />cncompassing 18 milcs of decp rock tunnel, ..J- major <br />shaft locations, se\'cral drop shaft locations and 2 <br />co\'ered storage locations. Shc is currently managing the <br />cnvironmental compliance program for the North <br />Dorchester Bay CSO Projcct for thc l\lassachusetts <br />\,\'atcr Resourccs :\uthority. <br /> <br />Relevant Experience <br />01/1981 - Present, Lead Environmental <br />Scientist, Shaw Environmental & <br />Infrastructure, Inc. <br />Environmental Compliance Manager, North <br />Dorchester Bay CSO Tunnel, Massachusetts Water <br />Resources Authority, Dorchester, MA, 12/2005 - <br />Present. :\s Environmental Compliance Manager, <br />responsible for ensurc contractor compliance with all <br />cnvironmental permit conditions, regulations and <br />commitments for this SlOO million constmction project <br />which includes an 8,500-linear foot (If) long, 20-foot <br />diameter, precast lined soft-ground tunnel mincd with an <br />earth pressure balance machine (EPBl\f) undcr Boston <br />city streets. Work also includes the constmction of <br />seven cut and cover di\'ersion stmctures, a 100 million <br />gallons per day (mgd) pump station, an odor control <br />facility and the installation of approximately 5,625 If of <br />IO-inch diameter ductile iron cement mortar lined <br />(DICL) force main to be constmcted in tight urban <br />street and utility settings. Reviewed at 90%, 100% and <br /> <br />SHAW ENVIRONMENTAL, INC. <br /> <br />06Ct22006T <br /> <br />Bid Construction Specifications and prm'ided comments <br />to thc design engineer. Revicwcd and commented on <br />contractor submittals for materials handling, erosion and <br />sedimcntation control, noise, hazardous materials, storm <br />water, etc. Also responsiblc for managing thc <br />cnvironmental inspection staff and resoking all <br />em'ironmental non compliance issues. <br /> <br />Project Manager, Nyanza Chemical Waste Dump <br />Superfund Site, 111351, Massachusetts Department <br />of Environmental Protection, Ashland, MA, 10/2004 <br />- Present. Coordinates quarterly inspection / <br />maintenancc and semi-annual grounchvatcr monitoring <br />activities at the Nyanza Chemical Waste Dump <br />Superfund Site to ensure that the Remedy at the site is <br />functioning as recluired. Each inspection includes <br />conducting routine maintenancc and recommendations <br />for repairs. :\n Inspection Report is prcpared and <br />submitted to MADEP for approval. Grouncl\\;ater <br />Sampling is conductcd on 16 \vclls and the terminal <br />manhole. Surfacc water sampling, scdimcnt sampling <br />and soil sampling arc also conducted periodically. <br />Samples are validatcd and a sampling report is prcparcd <br />for l\L\DEP review following each e\'ctlt. :\Iso managcs <br />long-tcrm wctland monitoring at the sitc to \'crify thc <br />functionality and cstablishmcnt of wetland arcas. <br /> <br />DRC Manager, Hurricane Rita Disaster Relief <br />Contract, FEMA, Liberty TX, 10/2005 - 10/2005. <br />l\Ianaged operations and logistics of thc Disaster <br />Rcgistration Center in Liberty Texas follmving Hurricanc <br />Rita. In coordination with FEMA, setup and managed a <br />mobile center which included Small Busincss <br />Administration, crisis counseling, and State of Texas <br />Emergency Rcsponse Team. Assistcd victims with <br />application processing, status follow up, ami other <br />disaster relief serviccs. Supervised and managed <br />temporary labor force; mobile living units for staff and <br />all equipment (computer banks, satellite phonc system, <br />trailer units, etc) and logistics for and demobilization of <br />the mobile unit. Interfaced effectively with Federal, state <br />and county emergcncy management personnel in the <br />daily operations of the unit. Provided reporting to Shaw <br />Houston Office f\lanagement Information Center and <br />FEMA documenting daily site activities, statistics, safety <br />issues and unit needs. <br /> <br />EILEEN M. LONDON <br /> <br />2 <br />