Laserfiche WebLink
<br />e <br /> <br />~ <br /><( <br />(/) <br />a <br />Cl. <br />a <br />0:: <br />Cl. <br />(/) <br />I <br />f- <br />u. <br />a <br />w <br />'" <br /><( <br />Cl. <br />':J <br />f- <br />;:: <br />W <br />I <br />f- <br />Z <br />a <br />z <br />a <br />;:: <br />u <br />ii' <br />f- <br />(/) <br />W <br />0:: <br />W <br />I <br />f- <br />a <br />f- <br /> <br />ei <br />(/) <br />!!2 <br />f- <br />W <br />W <br />I <br />(/) <br />(/) <br />I <br />f- <br />Z <br />a <br />D <br />w <br />Z <br />:,' <br />f- <br />Z <br />a <br />u <br /><( <br />f- <br /><( <br />D <br />u. <br />a <br />w <br />0:: <br />:J <br />(/) <br />g <br />u <br />(/) <br />o <br />0:: <br />a <br />w <br />(/) <br />:J <br /> <br />e <br /> <br />SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES <br /> <br />Project Manager, Norwood PCBs Superfund Site <br />Five-Year Review, General Services Contract, <br />103091, U.S. Environmental Protection Agency, <br />Norwood, MA, 04/2004 - 01/2005. Pro\'ided client <br />technical support in conducting a CERCLA compliant <br />Five- Year Review for the site applying strict adherence <br />to OSWER Directive 9355.7-03B-P. Provided an <br />objective review of remedies at the sites and determined <br />the protectiveness of those remedies. The fi\'e-year <br />review comprises se\'eral tasks, which conclude \vith a <br />presentation of findings in a formal report. These tasks <br />include a document re\'iew, site inspection, interyiews, <br />re\'iew of ,\RARs, and preparation of a report. The <br />report discusses site history and background, remedial <br />actions at the site, progress at the site, the Five-year <br />re\'iew process, technical asscssment, issues found, <br />rccommendations, and concludes \vith a statement <br />determining whether the remedy is protectiye of human <br />health and the environment. <br /> <br />Lead Environmental Manager, Environmental <br />Licensing Services Regional 345kv System <br />Reliability, 100765, NSTAR Electric and Gas <br />Corporation, Boston, MA, 01/2003 - 08/2004. <br />Responsible for assisting and alkising clicnt in thc <br />selcction and licensing of a 345k\" clcctricallinc routc <br />and an alternati\'e routc for this fast track, fixed price <br />project. Prepared elwironmental comparison and <br />impact sections for the filing to the Energy Facilities <br />Siting Board and managed the deyelopment and <br />execution of the abutter list and public notice. Currently <br />managing and preparing portions of the Enyironmental <br />Impact Report. Also prepared the Elwironmental <br />i\Ianagement and Construction Plan that addressed the <br />many complicated aspects of construction in densely <br />de\'eloped urban areas including contaminated soils, <br />traffic, waste management, dewatering, noise, etc. <br />,-\dditionallicensing of the route included US ACOE, <br />\'('etlands NOrs, Chapter 91, and coastal zone <br />management. Also assisted in the preparation of <br />Construction Contract documents. <br /> <br />Environmental Compliance Manager, MetroWest <br />Water Supply Tunnel Project, Massachusetts Water <br />Resources Authority, Framingham, Massachusetts, <br />11/1998 - 12/2003. i\Ianaged the Environmental <br />Compliance Program for this major cost reimbursable <br />enginecring and remediation project that encompassed <br />18 miles of deep rock tunnel, 4 major shaft locations, <br />several drop shaft locations and 2 coyered storage <br />locations. Directed compliance monitoring and <br />inspection of all contracted work including noise <br />monitoring, NPDES sampling and permit condition <br />yerification; coordinated corrective action where <br />relluired; and provided monthly reports to document <br />compliance with permit and contract requirements. <br /> <br />Regulatory Compliance Manager and Mitigation <br />Compliance Supervisor, Boston Harbor Project -- <br />Construction Management, Massachusetts Water <br />Resources Authority, Deer Island, MA 08/1990 - <br />07/2002. Oirectcd comprehensi\'c cngincering and <br />rcmcdiation serviccs on this $3.6B cost rcimbursable <br />contract to provide a ncw 1.3 EGO, secondary <br />wastcwatcr trcatment facility to i\letropolitan Boston. <br />Oirccted thc Ct\I staff and 85 general construction <br />contracts; and coordinatcd all project design acti\'itics, in <br />arcas related to em'ironmcntal compliancc and <br />implementation of regulatory agency requirements and <br />public outreach and also in areas of permitting, <br />hazardous matcrials management, regulatory analysis, <br />impact mitigation and sitc compliance monitoring, <br />inspection and reporting. Supen'ised appro\'al and <br />renewal of nearly 400 regulatory agency permits aClluired <br />to support thc court-ordered construction schedule. <br />Permit management utilized an integrated construction <br />scheduling and permit database software system. <br />l\Iaintained close coordination amongst project dcsign <br />firms, regulatory agencies and the owner. Managed <br />impact assessments and directed project consultants <br />performing environmental impact studies. To expedite <br />remediation of state-listed hazardous materials disposal <br />sites at seyeral project locations, she managcd a remedial <br />design consultant and coordinated all contractor <br />remedial actiyities and compliance inspections. I\lso <br />directcd rcgulatory rcyicw of all plans and specifications <br />at each stage of design, and was responsible for effecting <br />changes where ncedcd to conform the documents to <br /> <br />SHAW ENVIRONMENTAL. INC. <br /> <br />3 <br /> <br />EILEEN M. LONDON <br /> <br />06C122006T <br />