Laserfiche WebLink
<br />e <br /> <br />-' <br />.. <br />(/) <br />o <br />a. <br />o <br />a: <br />a. <br />(/) <br />I <br />>- <br />u. <br />o <br />UJ <br />'-" <br />.. <br />a. <br />~ <br />>- <br />f= <br />UJ <br />I <br />>- <br />Z <br />o <br />Z <br />o <br />f= <br />() <br />~ <br />(/) <br />UJ <br />a: <br />UJ <br />I <br />>- <br />o <br />>- <br /> <br />ei <br />(/) <br />!!! <br />>- <br />UJ <br />UJ <br />I <br />(/) <br />(/) <br />I <br />>- <br />z <br />o <br />o <br />UJ <br />z <br />;;: <br />>- <br />z <br />o <br />() <br />.. <br />>- <br />.. <br />o <br />u. <br />o <br />UJ <br />a: <br />::J <br />(/) <br />'3 <br />() <br />(/) <br />o <br />a: <br />o <br />UJ <br />(/) <br />::J <br /> <br />e <br /> <br />SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES <br /> <br />tcchnical consultant and prm'iding support for busincss <br />dc\'elopmcnt. <br /> <br />Thc following is a summary of kcy projects: <br />Project Manager and Lead Structural Engineer, <br />Repair of Parking Garage, New York Power <br />Authority, White Plains, NY, OS/2004 - Present. <br />Rcsponsibilities includc the visual inspcction, tcsting, <br />assessment, monitoring, preparation of Contract <br />Documents, and the construction managemcnt for thc <br />rcpair of a six lc\'el, prccast concretc, parking garagc. <br /> <br />Consultant, Mixed Oxide Fuel Fabrication Facility, <br />U.S. Department of Energy, Savannah River Site in <br />Aiken, GA, 11/2003 - Present. Responsiblc for <br />pcrforming technical rc\.ic\vs of the structural dcsign and <br />prm'iding recommcndations for mccting projcct <br />objectivcs and rcgulatory rccluircments. ,\lso <br />rcsponsiblc for thc prcparation of an cmbcdmcnt dcsign <br />critcria and cmbcdmcnt spccification. <br /> <br />Consultant, Building 31, U.S. Army Corp of <br />Engineers, Linde Site in Tonawanda, NY, 06/2004 - <br />08/2004. Responsible for prm'iding conccptual designs <br />and comparati\'c cost cstimatcs for thc tcmporary <br />support of thc building foundation of a two story <br />masonry and stcel framc building during exca\'ation to <br />mitigatc radiological contaminatcd soil. <br /> <br />Consultant and Responsible Structural Engineer, <br />Demolition of Building 14, , U.S. Army Corp of <br />Engineers, Linde Site in Tonawanda, NY, 03/2003- <br />08/2004. Responsiblc for enluating an existing 172 <br />foot by 182 foot, S..J- foot high, radio logically <br />contaminated building; preparing a dcmolition plan for <br />the surgical demolition of the building; and providing <br />structural oversight during thc demolition. <br /> <br />Consultant, NETL Report Identifying <br />Vulnerabilities and Technology Solutions, U.S. <br />Department of Energy, Pittsburg, Pennsylvania, <br />06/2004 - 06/2004. Prm'idcd cxpertisc on vulnerabilil\' <br />charactcristics of bridgcs and tunnels, mitigation <br />approachcs, and current needs of first respondcrs. <br /> <br />Consultant, Utility Tunnel Review, U.S. Army Corp <br />of Engineers, Linde Site in Tonawanda, NY, <br />09/2003 - 06/2004. Responsible for reviewing the <br />dcsign of a new precast concrcte utility tunnel, resolving <br /> <br />SHAW ENVIRONMENTAL, INC. <br /> <br />06C 112006 T <br /> <br />quality issues during fabrication of the prccast tunnel, <br />evaluating cracks and dctcrioration in thc cxisting utility <br />tunnels, and c\'aluating the effect of new hea\'y <br />cquipmcnt loads on thc cxisting tunnels. <br /> <br />Lead Civil/Structural Engineer, Eastchester <br />Extension Project, Iroquois Gas Transmission, NY, <br />OS/2002 - 06/2003. Responsiblc for dirccting and <br />supcrvising the civil, geotcchnical, and structural <br />enginecring for construction phasc serviccs for l\vo ncw <br />comprcssor stations and the modification of thrcc <br />eXlst1l1g comprcssor stations. <br /> <br />Lead Civil/Structural Engineer, Bronx Metering & <br />Regulating Station, Iroquois Gas Transmission <br />System, New York City, OS/2002 - 06/2003. <br />Responsiblc for dirccting and supelyising the ci,'il, <br />geotcchnical, and structural cnginccring for construction <br />phasc selyiccs for a ncw mctcring and rcgulating station <br />to scrvc Ncw York Cil\'. <br /> <br />Project Engineer and Lead Structural Engineer, <br />South Boston Piers Transitway (The Silver Line), <br />602053, Massachusetts Bay Transportation <br />Authority, Boston, MA, 09/1995 - 04/2002. <br />Responsiblc for managing and dirccting Sha\v's acti,'ities <br />and subconsultant activities in pcrforming cnginccring <br />and dcsign for a ncw bus maintcnance facility. The <br />facility includcs a Fueling Building, a Buswash and <br />Dcgrcasc Building, i\laintcnancc Building, <br />Transportation Building, Parking Garagc, surfacc and <br />cmbcdded vchiclc lifts, a dynomometer, cranes, parts <br />handling cquipment, and dicsel and CNG fucling <br />facilitics. Thc facility is dcsigned to maintain and fuel <br />both 60 foot articulated duel modc (elcctric and dicsel) <br />and CNG buscs. <br /> <br />Project Engineer and Lead Structural Engineer, <br />Tren Urbano (Transitway in Sanjuan, Puerto Rico), <br />ICA-Miramar Metro San Juan/Tren Urbano <br />Authority, Bayamon, Puerto Rico, 09/1996 - <br />12/2003. Responsible for managing and dirccting Stonc <br />& Wcbster's acti\'itics for providing principal dcsign and <br />quality assurance sClyices for thc first alignment scction <br />of the S1-billion Trcn Urbano transit project. Stonc & <br />\Vebstcr was the principal consultant to lC,\ !\liramar <br />!\Ietro San Juan, the joint vcnturc of lCA Construction <br />Corporation of Mcxico and !\Iiramar Construction <br /> <br />TIMOTHY J. LYNCH, P.E. <br /> <br />2 <br />