|
<br />e
<br />
<br />-'
<br />..
<br />(/)
<br />o
<br />a.
<br />o
<br />a:
<br />a.
<br />(/)
<br />I
<br />>-
<br />u.
<br />o
<br />UJ
<br />'-"
<br />..
<br />a.
<br />~
<br />>-
<br />f=
<br />UJ
<br />I
<br />>-
<br />Z
<br />o
<br />Z
<br />o
<br />f=
<br />()
<br />~
<br />(/)
<br />UJ
<br />a:
<br />UJ
<br />I
<br />>-
<br />o
<br />>-
<br />
<br />ei
<br />(/)
<br />!!!
<br />>-
<br />UJ
<br />UJ
<br />I
<br />(/)
<br />(/)
<br />I
<br />>-
<br />z
<br />o
<br />o
<br />UJ
<br />z
<br />;;:
<br />>-
<br />z
<br />o
<br />()
<br />..
<br />>-
<br />..
<br />o
<br />u.
<br />o
<br />UJ
<br />a:
<br />::J
<br />(/)
<br />'3
<br />()
<br />(/)
<br />o
<br />a:
<br />o
<br />UJ
<br />(/)
<br />::J
<br />
<br />e
<br />
<br />SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
<br />
<br />tcchnical consultant and prm'iding support for busincss
<br />dc\'elopmcnt.
<br />
<br />Thc following is a summary of kcy projects:
<br />Project Manager and Lead Structural Engineer,
<br />Repair of Parking Garage, New York Power
<br />Authority, White Plains, NY, OS/2004 - Present.
<br />Rcsponsibilities includc the visual inspcction, tcsting,
<br />assessment, monitoring, preparation of Contract
<br />Documents, and the construction managemcnt for thc
<br />rcpair of a six lc\'el, prccast concretc, parking garagc.
<br />
<br />Consultant, Mixed Oxide Fuel Fabrication Facility,
<br />U.S. Department of Energy, Savannah River Site in
<br />Aiken, GA, 11/2003 - Present. Responsiblc for
<br />pcrforming technical rc\.ic\vs of the structural dcsign and
<br />prm'iding recommcndations for mccting projcct
<br />objectivcs and rcgulatory rccluircments. ,\lso
<br />rcsponsiblc for thc prcparation of an cmbcdmcnt dcsign
<br />critcria and cmbcdmcnt spccification.
<br />
<br />Consultant, Building 31, U.S. Army Corp of
<br />Engineers, Linde Site in Tonawanda, NY, 06/2004 -
<br />08/2004. Responsible for prm'iding conccptual designs
<br />and comparati\'c cost cstimatcs for thc tcmporary
<br />support of thc building foundation of a two story
<br />masonry and stcel framc building during exca\'ation to
<br />mitigatc radiological contaminatcd soil.
<br />
<br />Consultant and Responsible Structural Engineer,
<br />Demolition of Building 14, , U.S. Army Corp of
<br />Engineers, Linde Site in Tonawanda, NY, 03/2003-
<br />08/2004. Responsiblc for enluating an existing 172
<br />foot by 182 foot, S..J- foot high, radio logically
<br />contaminated building; preparing a dcmolition plan for
<br />the surgical demolition of the building; and providing
<br />structural oversight during thc demolition.
<br />
<br />Consultant, NETL Report Identifying
<br />Vulnerabilities and Technology Solutions, U.S.
<br />Department of Energy, Pittsburg, Pennsylvania,
<br />06/2004 - 06/2004. Prm'idcd cxpertisc on vulnerabilil\'
<br />charactcristics of bridgcs and tunnels, mitigation
<br />approachcs, and current needs of first respondcrs.
<br />
<br />Consultant, Utility Tunnel Review, U.S. Army Corp
<br />of Engineers, Linde Site in Tonawanda, NY,
<br />09/2003 - 06/2004. Responsible for reviewing the
<br />dcsign of a new precast concrcte utility tunnel, resolving
<br />
<br />SHAW ENVIRONMENTAL, INC.
<br />
<br />06C 112006 T
<br />
<br />quality issues during fabrication of the prccast tunnel,
<br />evaluating cracks and dctcrioration in thc cxisting utility
<br />tunnels, and c\'aluating the effect of new hea\'y
<br />cquipmcnt loads on thc cxisting tunnels.
<br />
<br />Lead Civil/Structural Engineer, Eastchester
<br />Extension Project, Iroquois Gas Transmission, NY,
<br />OS/2002 - 06/2003. Responsiblc for dirccting and
<br />supcrvising the civil, geotcchnical, and structural
<br />enginecring for construction phasc serviccs for l\vo ncw
<br />comprcssor stations and the modification of thrcc
<br />eXlst1l1g comprcssor stations.
<br />
<br />Lead Civil/Structural Engineer, Bronx Metering &
<br />Regulating Station, Iroquois Gas Transmission
<br />System, New York City, OS/2002 - 06/2003.
<br />Responsiblc for dirccting and supelyising the ci,'il,
<br />geotcchnical, and structural cnginccring for construction
<br />phasc selyiccs for a ncw mctcring and rcgulating station
<br />to scrvc Ncw York Cil\'.
<br />
<br />Project Engineer and Lead Structural Engineer,
<br />South Boston Piers Transitway (The Silver Line),
<br />602053, Massachusetts Bay Transportation
<br />Authority, Boston, MA, 09/1995 - 04/2002.
<br />Responsiblc for managing and dirccting Sha\v's acti,'ities
<br />and subconsultant activities in pcrforming cnginccring
<br />and dcsign for a ncw bus maintcnance facility. The
<br />facility includcs a Fueling Building, a Buswash and
<br />Dcgrcasc Building, i\laintcnancc Building,
<br />Transportation Building, Parking Garagc, surfacc and
<br />cmbcdded vchiclc lifts, a dynomometer, cranes, parts
<br />handling cquipment, and dicsel and CNG fucling
<br />facilitics. Thc facility is dcsigned to maintain and fuel
<br />both 60 foot articulated duel modc (elcctric and dicsel)
<br />and CNG buscs.
<br />
<br />Project Engineer and Lead Structural Engineer,
<br />Tren Urbano (Transitway in Sanjuan, Puerto Rico),
<br />ICA-Miramar Metro San Juan/Tren Urbano
<br />Authority, Bayamon, Puerto Rico, 09/1996 -
<br />12/2003. Responsible for managing and dirccting Stonc
<br />& Wcbster's acti\'itics for providing principal dcsign and
<br />quality assurance sClyices for thc first alignment scction
<br />of the S1-billion Trcn Urbano transit project. Stonc &
<br />\Vebstcr was the principal consultant to lC,\ !\liramar
<br />!\Ietro San Juan, the joint vcnturc of lCA Construction
<br />Corporation of Mcxico and !\Iiramar Construction
<br />
<br />TIMOTHY J. LYNCH, P.E.
<br />
<br />2
<br />
|