My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Zyscovich
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-08-01) Prof. Design Svcs. for Heritage Park and Parking Garage
>
Responses
>
Zyscovich
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2010 12:27:59 PM
Creation date
11/29/2010 11:33:01 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Design Svcs for Heritage Pk
Bid No. (xx-xx-xx)
07-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />12. NAME <br />Michael D. Davila, P.E. <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />Com lete Dne Section E for each ke erson. <br />13. ROLE IN THIS CONTRACT <br />Principal-in-Charge, Mechanical Engineer <br /> <br /> <br />b. WITH CURRENT FIRM <br />14 <br /> <br />.FIRM NAME AND LOCATION (City and State) <br />11nson, Levinson, Ragan, Davila, Inc., West Palm Beach, Florida <br /> <br />16. EDUCATION (DEGREE AND SPEC/ALlZA nON) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Bachelor of Science Mechanical Engineering Florida / Mechanical <br />University of Florida, 1980 Florida / Fire Protection <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training. Awards. etc.) <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Aeromedical Facility PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> West Palm Beach, Florida 2003 2006 <br />a. (3) BRIEF DESCRIPTION (Brief scope. size. cost, etc.) AND SPECIFIC ROLE ./ Check if project performed with current firm <br /> Mr. Davila served as the Principal-in-Charge of the Mechanical, Electrical, and Plumbing Engineering design for this <br /> new Hangar/Office failcity for Palm Beach County's Trauma Helicopters. The entire facility is on emergency power, <br /> the hangar includes a low expansion foam fire suppression system. The total construction cost was $3.1 million. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Palm Beach County Sheriff Substation PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Bovnton Beach, Florida 2006 <br />b. (3) BRIEF DESCRIPTION (Brief scope. size. cost, etc.) AND SPECIFIC ROLE ./ Check if project perfonned with current firm <br /> Mr. Davila served as the Principal-in-Charge of the Mechanical and Electrical design for this facility consisting of <br /> administrative offices, holding cells, and detective offices. The facility includes a 100% backup generator system. <br /> The total construction cost was $4.7 million. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> FAUlScripps Joint Use Laboratory Facility PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Jupiter, Florida 2003 2004 <br /> BRIEF DESCRIPTI N Brief sea iz st etc. AND P IFIC R LE ./ Check if r . erforme wi h tfirm <br /> <br />.(3) <br /> <br />o ( <br /> <br />pe. s e. co , <br />d th P' <br /> <br />S EC 0 <br />I' Ch <br /> <br />th M h <br /> <br />p oJect pdt curren <br />I EI t' I d PI b' d <br /> <br />M <br /> <br />D '1 <br /> <br /> r. aVI a serve as e nnclpa -In- arge or e ec anlca, ec nca an um Ing eSlgns or a new <br /> 42,000 sq. ft. Laboratory, classroom and office building on the Jupiter campus of Florida Atlantic University. <br /> Systems designed were a new central plant, and steam and hot water systems. The project cost was <br /> approximately $10 million dollars. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> North County Resource Recovery PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> West Palm Beach, Florida 1998 1999 <br />d. (3) BRIEF DESCRIPTION (Brief scope. size, cost. etc.) AND SPECIFIC ROLE ./ Check if project performed with current firm <br /> Mr. Davila provided Mechanical and Fire Protection system design services for this project which included design <br /> for offices, shop, storage of flammable liquids, a visitors gallery, and fueling station. The construction cost for this <br /> facility was over $1,000,000.00. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> NASA HQ AHU Replacement PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Kennedy Space Center, Florida 2002 <br /> (3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE ./ Check if project performed with current firm <br />e. Mr. Davila served as the Project Manager directing the Mechanical, Electrical, and Plumbing Engineering design <br /> to provide for the phased replacement of the eighteen (18) chilled water AHU's, including installation of a new <br /> LonWorks based DOC control system in the KSC Headquarters Building. The total construction cost exceeds $6 <br /> million dollars. <br /> <br />. <br /> <br />AU1HORIZED FOR LOCAL REPRODUCTION <br />MANDA TORY USE OF DATE OF FORM 612004 <br /> <br />STANDARD FORM 330 (112004) PAGE 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.