Laserfiche WebLink
<br />12. NAME <br />,rold L. Ragan, P.E., RCDD <br /> <br />FIRM NAME AND LOCATION (City and State) <br />Johnson, Levinson, Ragan, Davila, Inc., West Palm Beach, Florida <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Com lete one Section E for each key person.) <br />13. ROLE IN THIS CONTRACT <br />Principal-in-Charge, Electrical Engineering <br /> <br />14. YEARS EXPERIENCE <br />2~T AL I ; 2TH CURRENT FIRM <br /> <br />16. EDUCATION (DEGREE AND SPECIALlZA nON) <br />Bachelor of Science Electrical Engineering <br />Florida Atlantic University, 1986 <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Florida / Electrical <br /> <br />Master of Science Engineering Management <br />Universit of South Florida, 1999 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations. Training. Awards, etc.) <br />Registered Communications Distribution Designer <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Aquatics Facility of Margate PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) <br /> Margate, Florida 2002 2003 <br />a. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE ./ Check if project performed with current firm <br /> Mr. Ragan served as the Electrical Engineer of Record for design of this municipal recreation facility. It consists of a <br /> swimming pool, directors administration area, 'wet' playground, and site activities pavilion.. The project cost was <br /> approximately $3.5 million. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Special Olympics Facility PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) <br /> Palm Beach County, Florida 2005 2006 <br />b. (3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE ./ Check if project performed with current firm <br /> Mr. Ragan served as the Principal-in-Charge of the design for this gymnasium and auditorium facility, designed <br /> specifically to support athletic and theatrical activities for the Palm Beach County Special Olympics.. The project <br /> cost was approximately $5 million. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Lake Clarke Shores Municipal Complex PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) <br /> Lake Clarke Shores, Florida 2006 2007 <br />c. (3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE ./ Check if project performed with current firm <br />Mr. Ragan was the Electrical Engineer of Record for the design of a new police station and a new town hall for the <br /> local municipality. Both buildings reside on a common campus along with a park and community gathering <br /> facility. The project cost was approximately $5.5 million. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Park Vista High School- Athletic Complex PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) <br /> Boynton Beach, Florida 2003 2005 <br />d. (3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE ./ Check if project performed with current firm <br /> Mr. Ragan served as the Principal-in-Charge for the design of this $70 million high school for the SDPBC. <br /> Integral to the design was a complete athletic complex with football and track & field stadium, baseball and <br /> softball fields, tennis courts, basketball courts, concession facilities, and press box. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Florida Atlantic University Track & Field PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) <br /> Boca Raton, Florida 2005 2006 <br /> (3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE ./ Check if project performed with current firm <br />e. Mr. Ragan was the Lead Electrical Engineer for the design of this multi-use facility designed to support track & <br /> field and football. A professional track consultant was employed to ensure systems were provided to support <br /> NCAA amenities, and the lighting on the track is television broadcast quality. The estimated cost of this project <br /> was $7.0 million. <br /> <br />. <br /> <br />AUTHORIZED FOR LOCAL REPRODUCTION <br />MANDATORY USE OF DATE OF FORM 612004 <br /> <br />STANDARD FORM 330 (112004) PAGE 2 <br />