Laserfiche WebLink
<br />12. NAME <br />George N. Khoury, PE <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Principal In Charge a. TOTAL b. WITH CURRENT FIRM <br /> <br />13 <br /> <br />7 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />Bliss & N itra , Inc. - Miami, Florida <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br /> <br />BSCE, University of South Florida, May 1984 <br />Structural Engineering <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br /> <br />Licensed in Florida <br />Certified Special Inspector <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Member of American Institute of Steel Construction; Florida Structural Engineering Association; Post-Tensioning Institute; and <br /> <br />Precast Concrete Institute <br /> <br />1 9. RELEVANT PROJECTS <br /> <br />. <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Florida State University Garage NO.2 PROFESSIONAL SERVICES ICONSTRUCTION (If applicable) <br /> Tallahassee, Florida 2001 2002 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE U Check if project performed with current firm <br />a. This project was an 855-car parking structure, four levels of parking with three scissor ramps for parking. The garage <br /> was built adjacent to Student Services Center also designed by BNI for 370,000 GSF. <br /> Construction Cost $9 Million. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Florida State University Garage NO.3 PROFESSIONAL SERVICES ICONSTRUCTION (If applicable) <br /> Tallahassee. Florida 2003 2004 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE U Check if project performed with current firm <br /> This project was a 1 ,500-car parking structure, five levels of parking. <br /> Construction Cost $15 Million. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> City of Hialeah Parking Garage PROFESSIONAL SERVICES ICONSTRUCTION (If applicable) <br /> Hialeah, Florida 2002 2003 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE U Check if project performed with current firm <br />c. <br /> This project was a 390-car parking structure, five levels of parking and built adjacent to the City of Hialeah Courthouse. <br /> The garage was built adjacent to the City of Hialeah Courthouse also designed by BNI. <br /> Construction Cost $3.9 Million. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Tallahassee Memorial Hospital Bixler Emergency PROFESSIONAL SERVICES ICONSTRUCTION (If applicable) <br /> Tallahassee, Florida 2001 2003 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE U Check if project performed with current firm <br />d. <br /> This project was constructed in two phases for a 653,000 SF expansion of this healthcare facility. Phase I included a <br /> 910-car, three level parking structure and Bixler Emergency Center. <br /> Construction Cost $54 Million. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Jacksonville Veterans Memorial Arena PROFESSIONAL SERVICES ICONSTRUCTION (If applicable) <br /> Jacksonville, Florida 2001 2003 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE U Check if project performed with current firm <br />e. City of Jacksonville built this 15,000-seat multipurpose arena. The facility was designed to host Sports and <br /> Entertainment Complex. <br /> Construction Cost $120 Million. <br /> <br />. <br /> <br />STANDARD FORM 330 (62004) PAGE 2 <br />