<br />
<br />('>. ~
<br />( Ii
<br />
<br />---- ""'
<br />
<br />Royal Palm Pointe Park - Vero Beach, FL
<br />AWARDS
<br />Award of Honor, American
<br />, Society of Landscape
<br />Architects, Florida Chapter
<br />Engineering Excellence
<br />Award, Florida Institute of
<br />Consulting Engineers, 2002
<br />
<br />Engineering Excellence
<br />Award, Florida Institute of
<br />') ", Consulting Engineers, 2002
<br />. ../,;,,1 "j I~"!I"II "I", 11,;,,1.. ill \..,." 1>"",/,. I I
<br />
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />I.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />
<br />
<br />This enhancement project included coordinating multiple
<br />subconsultants, conducting several public consensus
<br />workshops, assisting city government in applying for and
<br />securing various grants, expediting environmental permits,
<br />and ultimately producing a comprehensive redevelopment
<br />plan for the 2,800-foot corridor. A key to this project's
<br />success was analyzing the condition of the aging urban
<br />infrastructure (roads, utilities, sidewalks, etc,) and
<br />developing a comprehensive redevelopment package that
<br />upgraded this infrastructure in a manner that will
<br />encourage redevelopment while spreading the cost over a
<br />number of state, federal, and local funding sources.
<br />Included within the project is a three-acre urban waterfront
<br />park including a participatory fountain, park pavilion,
<br />multilevel plaza, bulkhead, courtesy boat slips and pier.
<br />The total project implementation was funded through a
<br />variety of sources including a special assessment district
<br />for the Pointe property owners; general City revenue
<br />sources; utility and roadway funding; and grants from the
<br />Florida Inland Navigation District and the U.S. Army Corps
<br />of Engineers.
<br />
<br />Client Reference:
<br />Monte Falls, Director of Public Works and Engineering
<br />City of Vero Beach
<br />Phone: (772) 978-5151
<br />
<br />Completed: 2001
<br />Total Fees Paid to Firm: $500,000
<br />Total Cost of Design and Construction, Estimated and
<br />Actual: Bid price: $4.89 million; Actual: $4,85 million
<br />Project Duration: 4 years
<br />
<br />UZ290066.07-0 Heritage Park & Parking Garage.qxp
<br />m007 Kimley-Horn and Associates, Inc.
<br />
<br />..,.,
<br />
<br />Boynton Beach Boulevard Extension and
<br />Promenade - Boynton Beach, FL
<br />AWARD
<br />Roy F. Kenzie Award - Best Capital Project/Beautification
<br />Award, Florida Re-development Association
<br />
<br />Burkhardt Construction and Kimley-Horn served the City
<br />of Boynton Beach Community Redevelopment Agency
<br />(CRA) for a boardwalk/streetscape project along the
<br />Intracoastal Waterway involving the extension of Boynton
<br />Beach Boulevard, This project is a part of a redevelopment
<br />effort by the CRA to improve the City's waterfront. The
<br />project consists of two specific elements: the extension of
<br />Boynton Beach Boulevard from US 1 to the Intracoastal
<br />Waterway, and the construction of a boardwalk along the
<br />
<br />Intracoastal Waterway from Boynton Beach Boulevard
<br />north for approximately 4,000 feet. This project will act as
<br />the link between the private sector and public sector
<br />redevelopment activity that has already commenced in this
<br />area.
<br />
<br />Client Reference:
<br />Lisa Bright, CRA Director
<br />City of Boynton Beach CRA
<br />Phone: (561) 737-3256
<br />
<br />Completed: Professional
<br />Services: 2004;
<br />Construction: 2005
<br />Total Fees Paid to Firm:
<br />$638,000
<br />Total Cost of Design and
<br />Construction, Estimated
<br />and Actual: $8,839,000 -
<br />$650,000 under budget
<br />Project Duration: 3 years
<br />
<br />
<br />,
<br />~
<br />I
<br />....!.
<br />
<br />1 ~~~ J ~
<br />K;II,I..!,-II"/',, dllllpl../l'.!
<br />ti,t.! IO!lOitf an) )l'"i~"l of a
<br />30( J-f, I()/ ,In }1I1l"hltle!
<br />1,,,,,/'J,,,,,lk "",) 1.3/iI) j~,,'1
<br />III /'iL'l'I'Il'<llk <llm'tl tI".
<br />Ill1tracoll~/al n'{,IL'ru'dY ill
<br />I !JoLln/oll 11......,..-1,.
<br />I -
<br />I
<br />
<br />lIl""'l-n Kimley-Hom
<br />~_U and Associates, Inc.
<br />
<br />4-2
<br />
<br />
<br />lJ H c:
<br />
<br />URBAN RESOURCE GROUP
<br />
<br />. InYI~IOII Of .IMlfl,~O.1I UD U50CIAHI. IIlC
<br />
|