Laserfiche WebLink
<br />. <br />. <br />'. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS <br /> <br /> 26. NAMES OF KEY 27. ROLE IN THIS 28. EXAMPLE PROJECTS LISTED IN SECTION F <br /> (Fill in "Example Projects Key' section below before completing <br /> PERSONNEL CONTRACT table. Place "X' under project key number for <br /> (From Section E, (From Section E, narticioation in same or similar role.) <br /> Block 12) Block 13) 1 2 3 4 5 6 7 8 9 10 <br />Jack Perry, RLA, ASLA Project Manager X X <br />Jerry Ingram, P.E. Principal-in-Charge <br />Chris Barton, RLA, AICP Park Planning <br />Jonathan Haigh, RLA, Park Planning <br />ASLA <br />James Pankonin, RLA, Landscape Architect <br />AS LA <br />Jimmy Bellamy Landscape Architect X <br />Manny Arencibia, RLA, Landscape Architect X X X <br />ASLA <br />Fadi Khalil, P.E. Civil Engineering <br />Walter Lugo, P.E. Civil Engineering X <br />Dean Penny, P.E. Parking Deck Structural X X <br />Engineering <br />Adam Cochran, P.E. Parking Deck Structural X X <br />Engineering <br />Jamie Farnham, E.!. Parking Deck Structural <br />Engineering <br />Ted Kendziora Environmental <br />Burt Baldo, P.E. Roadway/Traffic/MOT <br />Faisal Awan Roadway/Traffic/MOT <br />Randall Blanchette Civil Engineering <br />John McWilliams, P.E. Traffic Engineering X <br />Ken Creveling, AICP Financial Analysis <br />Alfredo Budik, P.E. Geotechnical <br />Ric Katz Public Relations/Public <br />Workshoos <br />Aviva Baer Public Relations/Public <br />Workshoos <br />Tony Franyie, Jr. MEP <br />Richard Golber Graphics/Wayfinding <br />Todd Hall Water Feature Design <br />Kobi Karp, AlA Architecture <br />Jennifer McConney, AlA Architecture <br />