<br />Approach cont... <br /> <br />y Start Up of the Project <br />· Initially, a clear understanding of the assignment is established, This includes the scope of work, schedules <br />and budget. <br />· In this case, we select an individual as required to perform each task, <br />· Time is scheduled to retrieve applicable construction documents and visit the site. <br />· Finally, applicable schedules and cost estimates are established, <br /> <br />y Site Investigation & Existing Conditions <br />· Architects International, Inc. strongly believes that the initial site investigation is extremely important for <br />the success of the project. With the construction documents in hand, our personnel will verify existing <br />dimensions, conditions and materials, In addition, it is standard practice for our team members to <br />photograph the site and in some cases videotape the existing conditions, At this time, any hazardous <br />material testing would take place, <br />· Criteria addressed includes code compliance, life safety, design interface, useful life of <br />Mechanical/Electrical/Plumbing/Communication system equipment, energy efficiency and future <br />requirements, <br />· A complete code analysis is performed, Coordination with the SIB and any other agency involved, etc, is <br />determined, <br />· A preliminary report will be generated from the information gathered during the site investigation and <br />design analysis. The preliminary report delineates the existing conditions and design solutions including <br />alternatives, schematic layouts, cost estimates, etc, Architects International, Inc, strongly believes that a <br />well executed site investigation and preliminary report establishes the basis for a smooth transition into <br />schematic design, design development and construction documents, <br /> <br />y Meeting Schedules <br />· Architects International, Inc. always strives to deliver a project on time. We understand that timing is <br />critical; Mr, Crespi's years of experience allows Architects International, Inc. to generate a schedule <br />that is concise and realistic for each project. A computerized schedule system specifies completion dates <br />for the various phases and elements of work, Elements of work include site investigation, design <br />calculations, drawing preparation, specifications, cost estimates, value engineering, submittals for design <br />review and approval. The schedule is reviewed by Mr, Crespi, AlA the project manager bi-weekly so that <br />additional staff can be allocated to meet project commitment dates, <br /> <br />y Budget Cost Control <br />· Architects International, Inco's team objective is to complete your project within the established budget <br />and deliver the facility design or study on time, During the design process, cost estimates will be measured <br />against budget allocations, The project team will review estimates and reconcile this information with the <br />planned budget. Architects International, Inc. has a reputation for consistently having construction bids <br />that are within a few percentage points of the original estimate, <br /> <br />City of Sunny Isles Beach <br />RFQ # 07-08-01 <br />Page 5 of 11 <br /> <br />ARC HIT E C T S .. <br />I N T ERN ^ T ION ^ L .. <br />