Laserfiche WebLink
<br />2.c. Constructability... <br /> <br />Architects International, Inc. has a proven approach to successfully complete this type of project based on our <br />years of experience, This is based on a foundation of the users needs; site opportunities and constraints; and permit- <br />ability and constructability constrains, The melding of identified user needs with the unique opportunities and <br />constrains, while recognizing the constrictions of constructability (both purely engineering and codified engineering <br />and environmental constraints) ensures that the project can be approved for construction and successfully <br />constructed, <br /> <br />3. Experience <br /> <br />3.a. Project Experience... <br />Detailed descriptions on SF 330 Section E (Resumes) and Section F (Project Examples) <br /> <br />Architects International, Inc.'s Experience includes: <br />. Jose Marti Park Multipurpose Center, Miami, Florida, 10-acre park site including exterior amenities, batting <br />cages, lighting and a community center and playfields, The park not only surrounds but runs under FOOT's 1-95 <br />structure, <br />. Deerwood Park at Bonita Lakes, Miami, Florida, 10,3 acre park project which include the addition of a new <br />recreation center building and parking, <br />. Carlos Arboleya Park, Miami, Florida. Park's gateway entrance feature to act as a gateway to the campground, <br />Themed to blend with nature environment and surroundings, <br />. Parking Garages #3 & #4, Miami, Florida, Services included inspections during the construction of this parking <br />garage at Florida International University's University Park Campus, <br />. Rhodes Building Parking Garage, Miami, Florida, Developed the design criteria for two design-build parking <br />garages with a combined total capacity for approximately 1,400 vehicles, <br />. North Parking Structure, Miami, Florida, 11 story, concrete structure to accommodate 2,000 vehicles <br />. Martin Luther King Metro Rail Parking Station, Miami, Florida, 1,300 parking spaces to accommodate the <br />Metro Rail riders at this station, <br /> <br />URS Corporation's Experience includes: <br />. Vista View Regional Park Expansion Project, Broward County, Florida, 62-acre site adjacent to the original <br />160-acre Vista View Regional Park. <br />· Everglades Holiday Park, Broward County, Florida, 800-acre park is Broward's only gateway to the <br />Everglades, <br />· Mary Brandon Park, West Palm Beach, Florida, Community park development to meet needs of surrounding <br />neighborhoods and the community high school. <br />. Golden Fig & San Park, Boca Raton, Florida, Two neighborhood parks with significant involvement from the <br />surrounding residents, CprED (Crime Prevention throuah Environmental Desian) principals were used to <br />address the community's safety and security concerns, <br /> <br />A.DA Engineering, Inc.'s Experience includes: <br />· Countess de Hoernle Park, Boca Raton, Florida. 228 acre parcel design of the Phase 1 Master Plan <br />components for the southern parcel to satisfy the City's immediate need for softball/baseball and soccer playing <br />fields, while environmentally and culturally innovative, <br />· Traz Powell Stadium Playfield Grass Replacement with Synthetic Turf, Miami, Florida. Installation of <br />synthetic turf with rubber infill on the football field in addition to modifications and improvements to the existing <br />facilities at Traz Powell Stadium, <br />· Curtis Park Synthetic Field and Track Improvements, Miami, Florida. Replacement of existing football/soccer <br />grass field with synthetic turn, relocation of the long jump area, relocation of shot put, pole vault and the <br />relocation or replacement of existing underground utilities. <br /> <br />City of Sunny Isles Beach <br />RFQ # 07-08-01 <br />Page 7 of 11 <br /> <br />ARC HIT E C T S .. <br />I N T ERN ;\ T ION ;\ L .. <br /> <br />c9 <br />