Laserfiche WebLink
requirements? <br />No, as long as the contractor can provide stamped and sealed documents by a <br />landscape architect when needed. <br />4. What is the projected start date? <br />Early in 2011. . <br />5. Is there a possibility for an extension for submittal? <br />Requests for an extension will be considered. <br />6. Will the selection process be objective? <br />It will be as objective as possible. <br />The mandatory Pre - Submittal Conference was concluded at 3:45 p.m. <br />Mandatory Pre-Subm ttal Conference QA 113010 Page 2 of 2 <br />